Work breakdown structure (WBS) MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT.
WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work...
-
Upload
jesus-black -
Category
Documents
-
view
218 -
download
4
Transcript of WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work...
WiFi LAN WITH TV AND RADIO RECEPTION
Project Stages
Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report
Project Charter
Project Charter
Existing Hardware:
LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD
LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD
Project Charter
Sketch
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
TV Program
Transmitting TV program Over the WiFi LAN Connection
Project Charter
Project Charter
Proposed Hardware: Linksys WUSBF54G Wireless-G USB Network Adapter with Wi-Fi Finder STANDARDS: IEEE 802.11b, 802.11g, USB 1.1, USB 2.0 PORT: USB Port CHANNELS: 802.11b/802.11g RECEIVE SENSITIVITY: 54Mbps @ -65dBm, 11Mbps @ -80dBm SECURITY FEATURES: WEP Encryption Compatible with 802.11g and 802.11b (2.4GHz) Standards Support USB 2.0 with up to 54Mbps, High-Speed Data Transfer Rate with Automatic Fallback Compatible with Microsoft Windows 2000 and XP
User Comments Very good range even at 1km Easy to read display with the all require information Rechargeable battery Good Speed
Project Charter
USB 2.0 AVerMedia TV Hybrid + FM Volar Pen Drive
USB 2.0 Pen Drive Watch Analog TV OR High Quality Digital Terrestrial TV FM Radio broadcasts on your PC/Notebook Microsoft MCE 2005 Compliant on Digital TV PVR Features Time-Shift, TV Scheduler Record Video to MPEG1/2 formats 4:3 and 16:9 wide-screen format 16 Channel Preview Windows XP and XP MCE 2005
Project Feasibility
Approach Overview:
Implement the LAN connection between two laptops via WiFi adapter.
Install one TV and Radio Receiver in one of the laptops and transfer the signal through Wifi LAN
Description of the solution:
Firstly we need to install two WiFi adapters in two laptops
LAPTOP
WiFi Adapter
LAPTOP
WiFi Adapter
Project Feasibility
Install one TV and Radio receiver
LAPTOP
WiFi Adapter
Project Feasibility
Capture some radio or TV signal
LAPTOP
WiFi Adapter
Project FeasibilityTransfer the signal from one laptop to another using WiFi
connection
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
Transmitting TV program Over the WiFi LAN Connection
Project Feasibility
Benefit/Cost of solution:
2 x USB WiFI adapters - $126.80 USB TV and Radio Receiver - $108.90 Installation and testing fees - $1000
Project Feasibility
Recommended solution:
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
TV Program
Transmitting TV program Over the WiFi LAN Connection
Work Breakdown Structure
CHANGE CONTROL
Change Request Overview:
Bluetooth dongle has the following features:
Maximum range if the wireless connection is 100 metre Encrypted data Security Easy maintenance
CLOSE-OUT REPORT
Project Deliverables
DELIVERABLE DATE ACCEPTED
Project Charter 17/10/2007
Project Diagram 17/10/2007
Work Breakdown Structure 24/10/2007
Feasibility Study 24/10/2007
Change Control 31/10/2007
Close-Out Report 07/11/2007
CLOSE-OUT REPORT
Budget Baseline:
CATEGORY PLANNED ACTUAL VARIANCE
Hardware $500 $235.70 -$264.30
Software $0 $0 $0
Labour $2,000 $1,000 -$1,000
Total $2500 $1235.70 -$1265.30
CLOSE-OUT REPORT
Schedule Baseline
And that’s all Gentlemen
Thanks for your Time