Wide Area Protection (WAP) Wide Area Protection (WAP) for a Major Load Center using a for a Major Load Center using a
Fast Load Shedding SchemeFast Load Shedding Scheme
ByVictor Wong
General Manager, Power TransmissionSarawak Energy Berhad
Presented at PQ Synergy 2010, Bangkok
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 22Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Introduction
Concept of WAP
WAP Architecture
Dynamic Simulation
Performance of WAP
Conclusion
OutlineOutline
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 33Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
1. INTRODUCTION
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 44Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBSarawak State Transmission GridSarawak State Transmission Grid
Similajau
Kemantan
Tg.Kidurong
Tudan
Engkilili
Btg.Ai
MatadengMukah
Sarikei
Tg.Manis
Kemena
Matang
Mambong
Selangau
Oya Road
Existing 275kV linesExisting 132kV lines
Existing 132kV substations
Existing 275kV substations
Existing power plants
Existing Power System
SejingkatBiawak
Grid System Demand : 1040MW
Installed Capacity : 1233MW
275kV Line : 767 km
(94MW hydro)
(210MW coal) (78MW diesel)
(270MW coal)
(506MW gas)
(75MW gas)
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 55Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
SELANGAU 275 kV
BINTULU 275kV
ENGKILILI 275 kV
KEM
KEMENA 275kV
~
Kuching Load
450MW
~
MAMBONG 275kV
OYA 275kV
~
Sibu Load
125MW
Bintulu Load 60MW
Smelter Load 100MW
Engkilili Load 19MW
Sarikei Load 29MW
KCH P/S
SPC Coal Gen =210MW TAR Diesel Gen =78MW
BAT Hydro AI P/S BAI Gen =94MW
Bintulu Gas P/S Bin Gen=506MW
~
Mukah Coal P/S MPG
Gen=270MW
MTD 132kV
PMB 132kVMukah
Load 20MW
~
Tudan 275kV
Miri Gas P/S Miri Gen=75MW
Miri Load
135MW
230MW250MW 220MW 335MW 185MW 55MW
Bintulu Load 45MW
Sarawak 275 kV Grid System – Typical power flowSarawak 275 kV Grid System – Typical power flow
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 66Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
UFLS is not effective in mitigating double circuit tripping for Sarawak power system ( 9th August 2008 Event )
Wide Area Protection (WAP)
aka System Protection Scheme (SPS)]
designed & implemented to supplement the existing UFLS to mitigate against double circuit tripped contingency
UFLS UFLS To Mitigate Double Circuit Tripped ContingencyTo Mitigate Double Circuit Tripped Contingency
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 77Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Kuching System Frequency For 9th August 2008 Event
36.00
38.00
40.00
42.00
44.00
46.00
48.00
50.00
52.00
0 1 2 3 4 5 6 7 8Time(Sec.)
Freq
uenc
y(H
z)
99thth August 2008 incident August 2008 incident Loss of both circuit Selangau-Kemena linesLoss of both circuit Selangau-Kemena lines
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 88Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
2. CONCEPT OF WIDE AREA PROTECTION2. CONCEPT OF WIDE AREA PROTECTION(WAP)(WAP)
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 99Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBConcept OF WAPConcept OF WAP
Objective of WAP deployment in Sarawak power systemSafeguard Kuching power systemAutomatic corrective measuresLoss of double circuit sectionsMambong-Engkilili-Oya-Selangau-Kemena-Bintulu
WAP system ACQUIRE generation and load informationCOMPUTE quantum of loads needed to be shed for a set of pre-defined contingent events DETECT the inception of the contingent event with sensors located strategically in the power system TRIP command to shed loads
within 150ms + CB opening time
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1010Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBSELANGAU
DATA ACQUISITIONUNIT (DAW) AT
OYA & SELANGAU
BINTULUCB STATUS
ENGKILILI
KUCHING SYSTEM
KEM
KEMENA
SDC
33/11kV feeders
33/11kV feeders
33/11kV feeders
33/11kV feeders
CB OPENED
ARMING SIGNAL
(BASED ON PRE-DETERMINED LOAD SHEDDING TABLE)
~ ~
WAN
WIDE AREA NETWORKMonitor & Control Workstation (MCW) with fail-over facility
MAMBONG
Substation A
System Info. Collection
MW,MVAR,MWH,V,Freq MCW
MCW
~
BINTULU SYSTEM
DAW DAW DAW DAW
UR F35 UR F35 UR F35 UR F35
UR F35 Relay
OYA
Substation B Substation C Substation D
Trip Signal Trip Signal Trip Signal Trip Signal
Concept OF WAPConcept OF WAP
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1111Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
3. WAP ARCHITECTURE3. WAP ARCHITECTURE
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1212Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
SELANGAU
BINTULUENGKILILI
KEM
KEMENA
~~
MAMBONG OYA
~
ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5
1. Zone 1 : Mambong – Detect Engkilili-Mambong Double Circuit Tripping
2. Zone 2 : Engkilili – Detect Engkilili-Kemantan-Oya Double Circuit Tripping
3. Zone 3 : Oya – Detect Oya-Selangau Double Circuit Tripping
4. Zone 4 : Selangau – Detect Selangau-Kemena Double Circuit Tripping
5. Zone 5 : Kemena – Detect Kemena-Bintulu Double Circuit Tripping
~
WAP ARCHITECTUREWAP ARCHITECTURE
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1313Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
MCW 1 MCW 2 Client Historian
Printer
GSP Time
Monitor &Control Workstation (MCW)
with fail-over facility
Ethernet Switch
Ethernet Switch
DAW
Protection Relay
Feeder Energy Meter
Feeder Energy Meter
Feeder Energy Meter
RS 485
Etherne
t
Ethernet Switch
DAW
Protection Relay
Feeder Energy Meter
Feeder Energy Meter
Feeder Energy Meter
RS 485
Etherne
t
Wide Area Network(WAN)
WAP
Local Substation Local Substation
SDC
Setup of the Wide Area Protection System
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1414Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBMain Control Workstation (MCW)Main Control Workstation (MCW)
Collect the data i.e MW, MAVR, frequency, CB Status, MWH and voltage from all 35 DAWs.
Perform data conversion from data collected and stores the data at its internal process database (PDB).
Send selected data to historian server for data archival and to client HMI for operator display.
Perform deficit calculation on 3 minutes interval to update WAP load shedding table for each zones.
Send out arming or disarming signal to all affected feeders.
Disable or enable WAP scheme
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1515Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBData Acquisition Unit (DAW)Data Acquisition Unit (DAW)
Collects and stores WAP related data from protection relays and energy meters in real time using Modbus protocolSends the data upon request by the MCWReceives arming information, selection criteria, and zone status from MCW and stores them in the internal table every 3 minutesMonitors IEC 61850 GOOSE messages for double-circuit tripped status originating from EHV substationsPerforms logic operations based on the arming table and predefined WAP logic schemeSend tripping signal to protection relay to execute tripping EHV substationsDAW receives 275kV double circuit lines CB status (IEC 61850 GOOSE messages) from protection relays and relays them to the other substations
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1616Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBHuman-Machine Interface (HMI)Human-Machine Interface (HMI)
Operator displayLocal control request/completed notificationLow WAP margin Low WAP selection Double-circuit tripping detectionAutomatic failover WAP faultyCommunication error at any of the substationsDisable or enable WAP schemeRemove or add in substations/feeders from load shedding table
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1717Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1818Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 1919Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2020Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2121Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2222Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2323Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2424Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
4. DYNAMIC SIMULATION4. DYNAMIC SIMULATION
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2525Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBDynamic Simulation
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2626Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBDynamic Simulation
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2727Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
4. PERFORMANCE OF WAP4. PERFORMANCE OF WAP
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2828Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBPerformance Of WAP on 31Performance Of WAP on 31stst October 2009 October 2009
WAP Zone Operated = OYAPower import @ Oya= 290MWOya-Selangau double-circuit tripped
Islanded Kuching power systemLoad demand = 462MWLocal generation = 172MWSystem frequency dip to 48.84Hz recovered steadily to 50.66Hz.
Load shedded by WAP Oya Zone310MW 138 feedersaverage WAP operating time : 108.65 ms + CB operating time
WAP deployed successfully to save Kuching power system from collapse
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 2929Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Table 1 : Summary of SPS PerformanceTable 1 : Summary of SPS Performance
Incident MW LossAmount of Load
Shed By SPSTotal feeders shed by SPS
Freq (Hz) Dip Post Steady State
Freq (Hz)
OYA-SLG Lines double circuit
tripping290MW 310.1MW 138 48.85 50.66
Table 2 : SPS Operating Time (excluding CB opening time)Table 2 : SPS Operating Time (excluding CB opening time)
WAP Operating Time (ms)Number Of
FeedersWAP Operating Time (ms)
Number Of Feeders
10-20 2 90-100 920-30 24 100-110 030-40 0 110-120 040-50 0 120-130 4650-60 0 130-140 2760-70 0 140-150 2370-80 0 150-160 780-90 0 160-170 0
Total Feeders Shed By WAP 138 Average WAP operating Time 108.65
WAP Performance on 31 October 2009 IncidentWAP Performance on 31 October 2009 Incident Oya-Selangau Double Circuit Tripping Oya-Selangau Double Circuit Tripping
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 3030Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB31 October 2009 Incident
Actual and Simulation response
45.00
46.00
47.00
48.00
49.00
50.00
51.00
0 1 2 3 4 5 6 7 8 9 10
Time(Sec.)
Fre
quen
cy(H
z)
31102009 Actual system frequency response with WAP operated -captured by disturbance recorderSimulated System frequency response with WAPSimulated System frequency response with UFLS
48.84Hz 48.60Hz
45.72Hz
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 3131Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
6. CONCLUSION6. CONCLUSION
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 3232Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEBConclusionConclusion
WAP scheme operation was validated
Significantly enhance Kuching power system supply security
Allows greater flexibility in system operation
Allows more economic generation dispatch
Tuesday, 18 April 2023Tuesday, 18 April 2023 Slide No. Slide No. 3333Private and ConfidentialPrivate and ConfidentialDo not duplicate or distribute without written permission.
SEB
Thank YouThank You
Any Question?Any Question?