Outline
Modelling of electrical networks
Overview of recent blackouts and their causes
How can modelling help in preventing blackouts
p3 ©J.W. Bialek, 2010
Overview of recent blackouts
Only wide-area blackouts, not local ones
– Local ones a majority Interconnected system blackouts in 2003:
US/Canada, Sweden/Denmark, Italy
UCTE “disturbance” 2006
May 2008 disturbance in the UK
p4 ©J.W. Bialek, 2010
Modelling of electrical networks
A network is a planar graph with nodes (buses, vertices) and branches (lines, edges)
GB high-voltage transmission network is meshed and consists of 810 nodes and 1194 branches
UCTE and US interconnected networks consist of several thousands nodes
For most analyses, the network is described by algebraic equation (Current and Voltage Kirchhoff’s Laws)
Electromechanical stability of rotating generators is described by differential equations
p5 ©J.W. Bialek, 2010
Preventing blackouts We can’t live without electricity so the power system has to be designed and
operated in a robust manner
– Should ride through “credible” disturbances
– Trade-off between cost of keeping reserves and security
A proxy to probabilistic risk assessment: (N-1) contingency – a deterministic criterion
N-1 contingency: a single disturbance (generation/line outage) should not cause problems
– it is unlikely that 2 or more units will be lost simultaneously
– generation reserve: the loss of the largest infeed (a nuclear reactor of 1320 MW at Sizewell B)
– Transmission reserve: loss of double-circuit line (N-D)
p6 ©J.W. Bialek, 2010
When do blackouts happen?
... when (N-1) contingency analysis has not been done properly (Italy 2003, UCTE 2006)
... or when more than 1 thing went wrong (US/Canada 2003, Sweden 2003, GB 2008)
... or hidden mode of failure (London 2003)
The new world of renewables and Smart Grids may require the use of probabilistic risk assessment
– Briefly today, more Thursday 3.30pm “Mathematical modelling of future energy systems”
p7 ©J.W. Bialek, 2010
Classification of blackouts
Transmission inadequacy: a failure in a transmission network causes a cascading overloading of the network (a majority)
Generation inadequacy: failures of power plant(s) cause a deficit of generation (GB 2008 disturbance)
Usually a mixture: an initial network fault causes a separation of the network into parts with deficit/excess of generation
p8 ©J.W. Bialek, 2010
Major transmission failures in late summer/autumn 2003
7 blackouts affecting 112 million people in 5 countries
14 August 2003, USA/Canada
23 August 2003, Helsinki
28 August 2003, south London
5 September 2003, east Birmingham
23 September 2003, Sweden and Denmark
28 September 2003, whole Italy except Sardinia
22 October 2003, Cheltenham and Gloucester
p9 ©J.W. Bialek, 2010 The Oregonian, 24 August 2003, after C. Taylor
p10 ©J.W. Bialek, 2010
NE of USA/Canada: before
p11 ©J.W. Bialek, 2010
NE of USA/Canada: after
p12 ©J.W. Bialek, 2010
p13 ©J.W. Bialek, 2010
p14 ©J.W. Bialek, 2010
Where it all began: Ohio and surrounding areas
Source: US/Canada Power System Outage Force
p15 ©J.W. Bialek, 2010
How it all started: tree flashover at 3.05 pm
Source: US/Canada Power System Outage Force
p16 ©J.W. Bialek, 2010
Bad luck?
Alarm and logging system in FirstEnergy (FE) control room failed 1 hour before the cascade started
Not only it failed, but control room engineers did not know about it
When lines started to trip they could not take corrective action: the system was not (N-1) secure after first trips
p17 ©J.W. Bialek, 2010
Cascading tripping: an initial line trip casues overloading on other parallel lines
Source: US/Canada Power System Outage Force
p18 ©J.W. Bialek, 2010
Effect of line trips on voltages: depressed voltage (Ohm’s Law)
Source: US/Canada Power System Outage Force
p19 ©J.W. Bialek, 2010 Source: US/Canada Power System Outage Force
p20 ©J.W. Bialek, 2010 Source: US/Canada Power System Outage Force
p21 ©J.W. Bialek, 2010
Speed of cascading
Source: US/Canada Power System Outage Force
p22 ©J.W. Bialek, 2010
Danish/Swedish blackout: 23/09/03, 5 M people
Normal load, big margins
Denmark self-sufficient, southern Sweden supplied from central/northern
1.2 GW Oskarshamn nuclear plant trips due to a feed-water valve problem
5 min later double busbar fault trips 4 lines at Horred substation
(N-5) contingency
1.8 GW Ringhals nuclear plant shuts down
Southern Sweden and western Denmark blacks out
p23 ©J.W. Bialek, 2010
Italy
p24 ©J.W. Bialek, 2010
Frequency as real power balance indicator
Power generated must be equal to power consumed
Frequency is the same at any part of interconnected network
If there’s a sudden loss of generation, energy imbalance is made up from kinetic energy of all rotating generators
The speed (frequency) drops triggering all turbine governors to increase generation automatically (feedback control)
If frequency drops too much,automatic load shedding isactivated
generation deficit => frequency drops, generation surplus => frequency increases
Source: National Grid
p25 ©J.W. Bialek, 2010
3 am: import 6.7 GW, 25% of total demand, 300 MW over agreed
CH operated close to (N-1) security limit but Italy didn’t know about it
86% loaded internal Swiss Lukmanier line trips on a tree flashover
3.11 am: ETRANS informs GRTN (disputed, no voice recordings)
GRTN reduces imports by 300 MW as requestedSource: UCTE
p26 ©J.W. Bialek, 2010
two more CH lines trip and Italy loses synchronism with UCTE
Island operation: import deficit leads to a frequency drop and load shedding
Until 47.5 Hz, 10.9 GW of load shed but 7.5 GW of generation lost
Frequency drops below 47.5 Hz and remaining units trip
Blackout 2.5 minute after separation: whole Italy, except of Sardinia.
Source: UCTE
p27 ©J.W. Bialek, 2010
UCTE: Union for the Co-ordination of Transmission of Electricity – association of TSOs now renamed ENTSO-E (European Network of Transmission System Operators for Electricity)
UCTE disturbance in 2006
Source: UCTE
p28 ©J.W. Bialek, 2010
Flows just before the blackout
Generation 274 GW including 15 GW of wind (5.5%)
Strong east-west power flows, i.e. the West depends on imports
strong wind generation in northern GermanySource: UCTE
p29 ©J.W. Bialek, 2010
Timeline
Image: http://www.cruise-ship-report.com/News/110506.htm
18 Sept: a shipyard request EON for a routine disconnection of double circuit 380 kV line Diele-Conneferde in northern Germany on 5 Nov
3 Nov: the shipyard request to bring forward the disconnection by 3 hours. Late announcement could not change exchange programs
4 Nov 9.30 pm: EON concludes empirically, without updated (N-1) analysis, that the outage would be secure. Wrong!
9.38: EON switches off of the line
10.07: Alarms of high flows. EON decides, without simulations, to couple a busbar to reduce the current
Result: the current increases and the line trips
As the system was not (N-1) secure, cascading line tripping follows
separation of UCTE into 3 regions with different frequencies
p30 ©J.W. Bialek, 2010
0.8 GW deficit49.7 Hz
8.9 GW deficit49 Hz
10 GW surplus51.4 Hz
Source: UCTE
p31 ©J.W. Bialek, 2010
Western Europe: 8.9 GW deficit
Frequency drop to 49 Hz triggered automatic and manual load shedding (17 GW) and automatic tripping of pump storage units (1.6 GW)
However the frequency drop caused also tripping of 10.7 GW of generation – more load had to be shed
DC connection UK-France: continued export from France despite the deficit!
p32 ©J.W. Bialek, 2010
Resynchronisation
A number of uncoordinated unsuccessful attempts made without knowledge of the overall UCTE situation
Full resynchronisation after 38 minutes
Source: UCTE
p33 ©J.W. Bialek, 2010
Cockenzie and Sizewell B were lost within 2 mins: (N-2) event, 1714 MW
Loss of Sizewell B is the largest infeed loss planned for (1320 MW)
Further 279 MW of wind tripped due to frequency drop (total 1993 MW)
Automatic load shedding of 546 MW triggered at 48.8 Hz
Voltage reduction caused reduction of demand by 1200 MW
More generation was connected and supply restored within 1 hour
Source: National Grid
GB May 2008 event: a near miss
p34 ©J.W. Bialek, 2010
Will there be more blackouts?
People tend to learn from the past
... but generals are usually prepared to the last (rather than future) war
Lessons learned from the blackouts - improvements in communications and coordination in Europe and USA
... but new challenges are looming ahead
p35 ©J.W. Bialek, 2010
Generation adequacy issues
Possible problems after 2015 (Ofgem Discovery report)
Regulatory uncertainty
p36 ©J.W. Bialek, 2010
Increased penetration of renewable generation
Wind already a contributing factor to UCTE 2003 and GB 2008 disturbances
“Any feasible path to a 80% reduction of CO2 emissions by 2050 will require the almost total decarbonisation of electricity generation by 2030” (Climate Change Committee Building a Low Carbon Economy 2008)
p37 ©J.W. Bialek, 2010
Smart Grids
Comms-enabled responsive demand, electric cars etc
Highly stochastic generation and demand: (N-1) contingency criterion may become obsolete soon – new probabilistic risk assessment tolls required
Dependence on comms networks is a new mode of failure
p38 ©J.W. Bialek, 2010
Example of new modelling techniques: preventive network splitting
EPSRC grant started January 2010 (Complexity Science call)
Exciting collaboration between graph theorists from Southampton (Brodzki, Niblo) , OR experts from Edinburgh (Gondzio, McKinnon) and power engineers from Durham (Bialek, Taylor)
Split the network in a controlled manner before it partitions itself
Initial main challenge: speaking the same language, mutual education
p39 ©J.W. Bialek, 2010
Conclusions
(N-1) contingency criterion has served us well in the past but there were a number of wide-area blackouts in 2003, 2006 and 2008
New challenges of increased wind penetration and Smart Grids
New mathematical modelling tools required to prevent future blackouts