Overview of HDM-4
Henry KeraliLead Transport SpecialistThe World Bank
![Page 2: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/2.jpg)
Transport and Development
Transport sector is vital for economic & social developmentRoads constitute largest component of transportRoads require a balance of:
Maintenance (or Preservation)Development (or Improvement)
Objective of Road ManagementConsistent and Rational Policy ObjectivesSufficient and Reliable FundingEffective Procedures & Management Tools (e.g. HDM-4)
![Page 3: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/3.jpg)
Maintenance Expenditure
In many developing and emerging economies, actual expenditure on road preservation and maintenance is between 25 ~ 60% of need.
![Page 4: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/4.jpg)
HDM-4 Concept
Predicts road network performance as a function ofTraffic volumes and loading
Road pavement type and strength
Maintenance standards
Environment / Climate
Quantifies benefits to road users from:Savings in vehicle operating costs (VOC)
Reduced road user travel times
Decrease in number of accidents
Environmental effects
![Page 5: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/5.jpg)
OptimumTotal
Road User
Road Works
Cost
Design Standards
Optimum Transport Costs
![Page 6: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/6.jpg)
Road Management
Purpose: To optimise the overall performance of the network over time in accordance with POLICY OBJECTIVES and within budgetary constraints
Typical objectives:Minimise transport costs
Preserve asset value
Provide and maintain accessibility
Provide safe and environmentally friendly transport
![Page 7: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/7.jpg)
Road Management Functions
PlanningSetting standards and policiesLong term estimates of expenditure
ProgrammingMedium term work programmes
PreparationDetailed project design and work packaging
OperationsImplementation of works in field
![Page 8: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/8.jpg)
Role of HDM-4
Management Function HDM-4 Application
Planning Strategy Analysis
Programming Programme Analysis
Preparation Project Analysis
![Page 9: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/9.jpg)
HDM-4 Applications
Road sector policy studies
Strategic planning of road network development, improvement & maintenance
Determination of funding requirements
Preparation of multi-year road work programmes
Economic appraisal of individual road projects
Research studiesRoad pricing
Vehicle regulations
Pavement design standards
![Page 10: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/10.jpg)
Standards & Policies
Road pricingroad use costs (to define fuel levies)congestion chargesweight-distance charges
Vehicle regulationsaxle load limitsenergy consumption, vehicle emissions & noise
Engineering Standardssustainable road network sizepavement design and maintenance standards
![Page 11: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/11.jpg)
Strategy Analysis
Objectives:Determine budget allocations for road maintenance and improvementPrepare for work programmesDetermine long term network performanceAssess impact on road users
Strategy analysis is concerned with the analysis of entire road networks to determine funding needs and/or to predict future performance under budget constraints
![Page 12: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/12.jpg)
Strategic Planning
Forecast scenarios of revenues & available budgetAssess current condition of assetsForecast traffic demands (from road network plan)Evaluate impact of strategies on performance and costs - using predictive modelOptimize strategies under alternative budget scenarios - maximize NPV for each scenarioDetermine multi-year program allocations & performance
![Page 13: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/13.jpg)
Strategic Analysis ApproachRoad NetworkRoad Network G F P
LMHMatrixMatrix
Resource Constraints
PreservationEvaluation
OptimizationModule
Optimal Strategy underBudgetary Constraints
Revenues, Sector budgets
Development Candidates
![Page 14: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/14.jpg)
Budget Allocation
Routine maintenance needs based on road lengths under each category of roadsRecurrent maintenance needs based on pavement surface condition Periodic maintenance needs based on economic indicatorsImprovement needs based on economic indicators
![Page 15: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/15.jpg)
Budget Summary
Maintenance Budget ($m)Primary Roads
Flexible Gravel
Secondary Roads
Flexible GravelRegion
North
East
South
West
45.9 18.7
34.6 13.5
52.1 21.0
27.2 20.4
34.5 21.8
24.9 11.8
45.0 21.8
19.5 12.3
![Page 16: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/16.jpg)
Effect of budget levels
2.0
3.0
4.0
5.0
6.0
2000 2001 2002 2003 2004 2005 2006
Aver
age
Rou
ghne
ss (I
RI)
$20m
$15m
$10m
AnnualBudget
Target = 3.5 IRI
Primary Roads
![Page 17: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/17.jpg)
Road Network Performance
3.0
4.0
5.0
6.0
7.0
2003 2004 2005 2006 2007 2008 2009
Ave
rage
Rou
ghne
ss (I
RI) Feeder
Roads$30m/yr
SecondaryRoads$35m/yr
PrimaryRoads$20m/yr
Budget Allocations
![Page 18: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/18.jpg)
Optimal budget requirements
0
50
100
150
200
250
2003 2004 2005 2006
US
$ m
/yea
r . DevelopmentImprovementPeriodicRoutine
![Page 19: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/19.jpg)
Programme Analysis
Objective: prioritise candidate road projects in each year within annual budget constraintAnnual budgets obtained from strategic maintenance plan
Concerned with the preparation of single or multi-year road work and expenditure programmes under
specified budget constraints.
![Page 20: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/20.jpg)
Procedure .
Use specified standards to screen network & identify candidate projects, e.g.
road sections which exceed specified conditionroads with inadequate capacitypavements which need strengtheningupgrade pavements with high traffic volumes
![Page 21: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/21.jpg)
Procedure ..
Determine maintenance or improvement optionsSpecify budget limits & periodsOptimise using selected objectiveProduce optimal list of projects for budget period
![Page 22: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/22.jpg)
Work Programme Output
Priority Road Length Province Type of Scheduled Cost CumulativeRank Section (km) or District Road Work Year $m S$m
1 N1-2 20.5 2 Resealing 2000 5.4 5.42 N4-7 23.5 7 Overlay 40mm 2000 10.9 16.33 N2-5 12.5 5 Reconstruct 2000 8.6 24.94 R312-1 30 4 Widen 4 lane 2000 31.4 56.35 R458-3 36.2 3 Overlay 60mm 2000 16.3 72.6
: : : : : : : :1 N4-16 32.1 6 Reconstruct 2001 22.8 22.82 R13-23 22.4 4 Overlay 40mm 2001 9.7 32.53 N521-5 45.2 2 Widen 4 lane 2001 41.3 73.8
: : : : : : : :1 N1-6 30.2 4 Resealing 2002 8.2 8.22 N7-9 17.8 3 Overlay 60mm 2002 9.2 17.43 F2140-8 56.1 1 Reconstruct 2002 34.9 52.3
: : : : : : : :
20032003200320032003
200420042004
200520052005
![Page 23: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/23.jpg)
Project Appraisal
Project typesNew construction, upgrading
Reconstruction, resealing
Widening, lane addition
Non-Motorised Transport lanes
Economic indicatorsNet Present Value (NPV)
Economic Rate of Return (ERR)
Benefit Cost Ratio (BCR), NPV/C
First Year Rate of Return (FYRR)
![Page 24: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/24.jpg)
Economic Decision Criteria
NPV IRR3 NPV/C FYRRProject economic validity V.Good V.Good V.Good PoorMutually exclusive projects V.Good Poor Good PoorProject timing Fair Poor Poor GoodProject screening 1 Poor V.Good Good PoorUnder budget constraint 2 Fair Poor V.Good Poor
Notes:1. check for robustness to changes in key variables (sensitivity analysis)2. with incremental analysis3. IRR may be indeterminate with NONE or MANY solutions.
![Page 25: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/25.jpg)
Project Level Outputs
Sensitivity analysis resultsScenario analysisRoad condition indicatorsRoad user cost detailsEnergy & emissions
![Page 26: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/26.jpg)
HDM-4 as a Decision Support Component of Road Management Systems
![Page 27: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/27.jpg)
Data Data CollectionCollection DatabaseDatabase DecisionDecision
SupportSupportManagementManagementInformationInformation
InventoryConditionStructuresTrafficFurnitureUnit CostsStandards
RDBMS(RIMS)
Life CycleAnalysis(HDM-4)
Standard& CustomReports
Components of a Road Management System
![Page 28: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/28.jpg)
Management Information
Starting point in implementation“Must be relevant to the decision-making process with little or no further processing”
Determine:Purpose/use of the management informationCorrespondence with management structureKey reports to be produced by Decision Support systemReports Formats
![Page 29: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/29.jpg)
Decision Support SystemTransparency of analysisLife cycle analysis capable of:
Short, Medium & Long term analysesWhat-if analysis, Performance indicators
Management must understand analysis frameworkAvailability of local technical expertiseDefault data sets
HDMHDM--44
![Page 30: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/30.jpg)
HDM Technology Set
KnowledgeBase Software
ModelsSEERDWE
RUE
![Page 31: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/31.jpg)
HDM Series
![Page 32: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/32.jpg)
Conclusions – Why HDM-4?
Transparency of analysis
Economic analysis capable of:Short, Medium & Long term analyses
What-if analysis
Internationally accepted analysis framework
Availability of technical expertise
Local calibration
![Page 33: Why HDM-4?](https://reader034.fdocuments.in/reader034/viewer/2022050720/58a19dfe1a28abd04d8c353d/html5/thumbnails/33.jpg)
Web sites:
http://hdm4.piarc.orghttp://www.bham.ac.uk