CTBUH 2014 Shangai Conference
ADVANCES IN SEISMIC DESIGN
AND CONSTRUCTION IN INDONESIA
Davy SukamtaDavy SukamtaDavy SukamtaDavy SukamtaPrincipal, Davy Sukamta & Partners – Structural EngineersPresident,Indonesian Society of Civil&Structural Engineers
CTBUH 2014 Shangai Conference
ISEMS, 7-8 November 2013
Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?
1. To considers recent great earthquakes in Indonesia
USGS
Aceh Earthquake Mw=9.1 (December, 2004)
Yogya Earthquake Mw=6.3 (May, 2006)
Tasik Earthquake Mw=7.4 (Sept, 2009)
Padang Earthquake Mw=7.6 (Sept, 2009)
Jambi EarthquakeMw=6.6 (Oct, 2009)
Nias Earthquake Mw=8.6(March, 2005)
Courtesy Masyhur IrsyamRecent major earthquakes, Western Indonesia
CTBUH 2014 Shangai Conference
Damage to engineered structure
2
CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference
Advances inSeismic Design And Construction
for High-Rise BuildingsIn Indonesia
1. Issuance of New Seismic Resistant Design Code (2012)
2. Use of Nonlinear Pushover Analysis andPerformance-Based Seismic Design for High-Rise Buildings In Design Office
3. Application of Base Isolation System for High-Rise Buildings
CTBUH 2014 Shangai Conference
IBC 2011
ASCE 7-05ASCE 7-10
UPDATING THE CODERef.Prof.Masyhur Irsyam
SNI-2002
3 maps for 500-yr EQ and 3 for 2500-yr EQa.PGAb.Spectra at 0.2 secc.Spectra at 1.0 sec
SNI-2012
What are the changes?
3
CTBUH 2014 Shangai Conference
( Irsyam et al,2010)
Mw for Seismic hazard map 2010
CTBUH 2014 Shangai Conference
( Irsyam et al,2010)
CTBUH 2014 Shangai Conference
Many provisions of ASCE 7-10 have been included in the SNI:1726-2012
CTBUH 2014 Shangai Conference
New Provisions
Vertical Irregularities
Horizontal Irregularities
Seismic Design Categories
Redundancy Factors
Generating Design Response Spectrum
4
CTBUH 2014 Shangai Conference
The Pakubuwono Signature
- 50-story 250-M high- RC core wall & outrigger
- First building analyzed withPBSD method in Indonesia
- Structural Engineer: Davy Sukamta & Partners- Completed in 2014
The use of PERFORMANCE-BASED SEISMIC DESIGN
CTBUH 2014 Shangai Conference
PAKUBUWONO SIGNATURE
Floor-to-floor 3.85mRC Core wall and Outriggers as lateral resisting systemWall thickness 650 mmOutrigger Beam 3-story deepExpected inelastic action at coupling beams, base of core wall, both ends of outrigger columns
Designed in accordance with PEER-TBI Guidelines
CTBUH 2014 Shangai Conference
3-D Nonlinear Model
core wall
hinge zones
Basement structure is includedModel is fixed at the mat foundation level
SSI is not included
CTBUH 2014 Shangai Conference
CHICHI RECORD
3-D VIEW Y-AXIS X-AXIS
5
CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference
CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference
6
CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference
� Loma Prieta 1989 – $7 Billion
� $450 Million per Second
� Northridge 1994 - $30 Billion
� $2 billion per second!
� Kobe 1995 - $150 - $200 Billion
� $7.5 billion per second!!
Earthquakes Can Be Catastrophic And Very Expensive
CTBUH 2014 Shangai Conference
Fundamental principle of base isolation: modify the response of the building so that the ground can move below the buildings without transmitting these motion into the building.
CTBUH 2014 Shangai Conference
7
CTBUH 2014 Shangai Conference
Plan of Base Isolators
16 nos HDRB HH130 -6R24 nos HDRB HH150-6R
HDRB
CTBUH 2014 Shangai Conference
Courtesy: Bridgestone,Japan
CTBUH 2014 Shangai Conference
Lateral Resistant System: RC Corewall+Outriggerand Seismic Steel Moment Frame, with HDRB
CTBUH 2014 Shangai Conference
Structural Scheme – Outrigger Floor
Shear Link
Outrigger Beam
8
CTBUH 2014 Shangai Conference
Outrigger
RC core wall
NomorPeriodeGetar Nomor
Periode Getar Faktor Partisipasi Mass (%)
Ragam (detik) Ragam (detik) X-trans Y-trans Rz-rotn1 1.657 1 1.657 0.00 58.08 0.012 1.453 2 1.453 54.97 0.00 0.033 1.012 3 1.012 0.01 0.00 65.31
Fixed-base Structure
Nomor Periode Getar Faktor Partisipasi Mass (%)Ragam (detik) X-trans Y-trans Rz-rotn
1 4.233 0.00 99.05 0.002 4.160 99.20 0.00 0.183 3.454 0.18 0.00 99.81
Base-isolated Structure
Dynamic Characteristic ofBased-Isolated vs Fixed-Base Structure
OutriggerColumn
1.657 sec → 4.233 sec
CTBUH 2014 Shangai Conference
R=2.0 CD=2.0
R=6.0 CD=5.0
Performance of Seismically Isolated Structure vs Conventional Structure
CTBUH 2014 Shangai Conference
Seismic design detailings are put in place with strict supervision to the works, starting from foundation:- Confinement of pile- Diameter of bend- Length of hook
CTBUH 2014 Shangai Conference
9
CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference
PURI MATAHARI TOWER
JAKARTA
27-storyBase-isolated structure
Typical Floor Plan
CTBUH 2014 Shangai Conference
Base Isolation Plan
7 nos.HT090x6R9 nos.HT120x6R10nos.HT130x6R12nos.HT160x6R
CTBUH 2014 Shangai Conference
Area Mode
Periode
Modal Participating Mass Ratios (%Mass)
(detik) Ux-Trans Uy-Trans Rt-trans
Tower
1 1.899 57.90 0.07 0.00
2 1.755 0.06 59.96 1.11
3 1.308 0.01 0.50 65.13
Base-isolated Structure
Fixed-based Structure
1.899sec 3.755sec
10
CTBUH 2014 Shangai Conference
ETABS Model BM Diagram of Core Wall
CTBUH 2014 Shangai Conference
Fixed-Base Isolated Base
V=77436 kN
V=12906 kN
V=39946 kN
V=19973 kN
Non-linear Push-over Analysis
Direction
CTBUH 2014 Shangai Conference
Fixed-Base Isolated Base
V=12906 kN
V=77436 kN
V=39946 kN
V=19973 kN
Non-linear Push-over Analysis
Direction
CTBUH 2014 Shangai Conference
0
5
10
15
20
25
30
35
40
45
0 0.2 0.4 0.6 0.8 1 1.2
Ba
se S
he
ar
(x1
00
0K
N)
Displacement (m)
Base Shear vs Displacement (PUSH-1)
ISOLATOR
DISPLACEMENT
ROOF DISPLACEMENT
0
1000
2000
3000
4000
5000
6000
0 0.02 0.04 0.06 0.08 0.1
Ba
se S
he
ar
(x1
00
0K
N)
Displacement (m)
Base Shear vs Displacement (PUSH-2)
ISOLATOR
DISPLACEMENT
ROOF DISPLACEMENT
11
CTBUH 2014 Shangai Conference
R=2.0 CD=2.0
R=6.0 CD=5.0
Fully Operational
Fema 356 CP
Fema 356 LS
Fema 356 IO
Performance of Seismically Isolated Structure vs Conventional Structure
CTBUH 2014 Shangai Conference
The Puri Matahari Tower under construction
CTBUH 2014 Shangai Conference
http://www.davysukamta.com