Wheatstone Project Update - Chevron.com · Wheatstone Project Update: Selected Images, November,...
Transcript of Wheatstone Project Update - Chevron.com · Wheatstone Project Update: Selected Images, November,...
© 2013 Chevron Corporation. All rights reserved.
Wheatstone Project Update:
November 1, 2013
© 2013 Chevron Corporation. All rights reserved.
Micro-tunnel Boring
In August, boring of the .75-mile (1.2-km) micro-tunnel began at the shore crossing. Micro-tunnelling is being used to bring the 44-inch trunk line ashore.
Site Offices and Support Facilities
Micro-tunnel Launch PitBeach
Jacking Pipes (Tunnel Liners)
2
© 2013 Chevron Corporation. All rights reserved.
Micro-tunnel Boring
Inside the micro-tunnel launch pit, workers complete a push of the concrete jacking pipes. More than 400 pipes are pushed together to provide a conduit to pull the trunk line.
3
© 2013 Chevron Corporation. All rights reserved.
LNG Plant Site
4
Construction works at the LNG plant site are progressing, with key areas now taking shape.
© 2013 Chevron Corporation. All rights reserved.
LNG Plant Site
At the LNG plant site, fill is being brought from nearby borrow pits to raise the site level and piling is underway for the foundations of LNG Train 1.
Beach
LNG Tanks Area
LNG Train Area
Main Plant Site Access
RoadCondensate Tanks Area
Fill Borrow Pit #2
5
© 2013 Chevron Corporation. All rights reserved.
LNG Tank Pad
Piling works for the foundations of the two LNG storage tanks is underway.
LNG Storage
Tank Piles
6
© 2013 Chevron Corporation. All rights reserved.
LNG Plant Site Foundations
Piling for the foundations of LNG Train 1 nears completion as construction of the refrigeration compressor foundation commences. More than 4,000 piles have been installed on site to date.
Refrigeration Compressor Foundation
7
© 2013 Chevron Corporation. All rights reserved.
LNG Plant Site Marine Facilities
At the Material Offloading Facility (MOF), the east quay piling platform and rock works for the temporary jetty are both complete.
Eastern MOF Quay
MOF Support Facilities Area
Southern MOF Quay
8
© 2013 Chevron Corporation. All rights reserved.
LNG Plant Site Marine Facilities
Installation of the abutment wall for the Product Loading Facility (PLF) is underway. The wall will anchor the shore end of the PLF.
9
© 2013 Chevron Corporation. All rights reserved.
Platform Construction
At the DSME shipyard in Okpo, Korea, the intermediate deck is now fully installed and erection of the top deck has commenced.
10
© 2013 Chevron Corporation. All rights reserved.
Platform Construction
At the DSME shipyard in Okpo, Korea, erection of the steel gravity structure (SGS) pontoon and node blocks is nearing completion.
11
© 2013 Chevron Corporation. All rights reserved.
Platform Construction
12
© 2013 Chevron Corporation. All rights reserved.
Construction Workforce Accommodation Facilities
With the first phases complete, more than 3,000 workers are now housed onsite.
13
© 2013 Chevron Corporation. All rights reserved.
Construction Workforce Accommodation Facilities
At the Construction Village, the new kitchen and western diner facilities are operating, while the eastern diner nears completion.
Kitchen and Diner
Construction Village
Fly CampPioneer Camp
14
© 2013 Chevron Corporation. All rights reserved.
Social Infrastructure
The Chevron-funded 1.2-mile (1,900-meter) runway at Onslow airport is now operational and construction of a new terminal is well underway.
15
New Runway
Old Runway
Terminal Building
New Apron
© 2013 Chevron Corporation. All rights reserved.
Social Infrastructure
The Chevron-funded upgrade to Four Mile Creek picnic and fishing area is nearing completion.
16
New Runway