The business of sustainability © Copyright 2018 by ERM Worldwide Group Limited and/or its affiliates (‘ERM’). All Rights Reserved. No part of this work may be reproduced or transmitted in any form or by any means, without prior written permission of ERM. What’s Going on with NSR? Air Quality Policy Changes in the US Ken Weiss, PE, BCEE Principal Partner ERM October 22, 2018

Transcript of What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many...

Page 1: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

The business of sustainability

© Copyright 2018 by ERM Worldwide Group Limited and/or its affiliates (‘ERM’). All Rights Reserved. No part of this work may be reproduced or transmitted in any form or by any means, without prior written permission of ERM.

What’s Going on with NSR?Air Quality Policy Changes in the US

Ken Weiss, PE, BCEEPrincipal PartnerERM

October 22, 2018

Page 2: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Today’s Topics

How did we get here?

New approach to actual to projected actual applicability test

Source Aggregation

Project Aggregation

NSR Project Emissions Accounting

ACE Rule – proposed revisions to NSR applicability for EGUs

What’s Going on with NSR? 2

Page 3: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Growth of EPA Regulations

What’s Going on with NSR? 3

Over 27,000 pages in 2017; Increase of almost 700 pages

0

5,000

10,000

15,000

20,000

25,000

Pages in 40 CFR

Others(5%)

Waste(8%)

Pesticides(3%)

Toxics(6%)

Water(12%)

Air(66%)

Source: U.S. Code of Federal Regulations

Page 5: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

The Case for Change

The time required to obtain a permit is unreasonably long and varies across the country

~45% of industry NSR permits > 1 year to process

Range 1 month to 7.5 years.

14 month average

Rule complexity and uncertainty

95% of refining capacity has entered into settlement agreements since March 2000

112 refineries in all, at present

NSR was a primary issue in the vast majority

What’s Going on with NSR? 5

Page 6: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Lessons from the 2002 NSR Reforms

What’s Going on with NSR? 6

Scorecard In Effect

Abandoned, Stayed Vacated or Revoked

10 yr Baseline Emissions Lookback

Actual to Future Actual Methodology

Actual PALS

Clean Unit Test X

Pollution Control Project Exclusion X

Flexible Permitting and NSR Green Groups X

RMRR Bright-Line Test X

Project Aggregation Rule X

Source Aggregation Policy

Reasonable Possibility Rule

Fugitive Emissions Rule X

Page 7: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Bill Wehrum on NSR Reform

What’s Going on with NSR? 7

BNA Energy and Climate Report (November 27, 2017)

“I'm not so sure full-scale reform is what we need to do. The analogy I use is we're going to try to hit a few singles, maybe a couple of doubles, but we're not going to swing for the fences . . . ” “If we do enough of these more

targeted things, then I think over time we will have a big impact on the program.”

Page 8: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Tools for NSR Reform

What’s Going on with NSR? 8

01 02 03 04

Guidance memos

Source determinations

Applicability determinations

Rulemaking

05

Legislation

Page 9: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

A New Approach to ATPA

Page 10: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Actual-to-Projected-Actual Applicability Test

December 7, 2017 - Guidance memorandum titled “New Source Review Pre-construction Permitting Requirements: Enforceability and Use of the Actual-to-Projected-Actual Applicability Test in Determining Major Modification Applicability.”

New approach to EPA enforcement regarding the ATPA Test

EPA will not “substitute its judgment for that of the owner or operator” concerning a source’s emissions projections, unless there is clear error.

Projections may include intent to actively manage post project emissions

Enforcement focus will be on post project emissions

Use of demand growth exclusion is explicitly recognized and allowed

What’s Going on with NSR? 10

Page 11: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

Source Aggregation Guidance

Page 12: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Aggregation – The Updated 3-Part Test

What’s Going on with NSR? 12

Page 13: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Two Key Updates

1. April 30, 2018 Meadowbrook Energy Source Determination – Addressing the term “Common Control”. Control means the power to dictate decisions impacting compliance.

2. September 4, 2018 Draft Guidance – Interpreting “Adjacent” for New Source Review and Title V Source Determinations in all Industries Other Than Oil and Gas

A. Adjacency solely based on proximity

B. No bright line rather “Nearby” is the test

C. Functional Interrelatedness is not a factor

What’s Going on with NSR? 13

Page 14: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Understanding “Control” and Source Aggregation

What’s Going on with NSR? 14

Does KSL Support or Control Meadowbrook? Does Meadowbrook Support or Control KSL?

Keystone Sanitary Landfill

MeadowbrookEnergy

LLC

Landfill Gas Pipeline

Page 15: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

Project Aggregation Rule (w/ OMB since July 6th)

Page 16: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

What is Project Aggregation?

What’s Going on with NSR? 16

Should two separate projects be combined into a single permit application rather than permitted individually?

Project A Project BJanuary 201730 tons per year VOC

November 201725 tons per year VOC

Page 17: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

What Has Been Historic Approach to Project Aggregation?

What’s Going on with NSR? 17

Historic approaches established through guidance memos

January 2009 final rulemaking

under Bush administration withdrawn by Obama EPA

Further defined under previous administration -

“case by case” determination based on

multiple factors

Guidance memos

Bush final rulemaking

Back to historic

guidance docs

Page 18: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

What is Happening Now?

What’s Going on with NSR? 18

Projects should be combined that are “substantially related”Have more in common than simply supporting the overall basic function of the facility

0201

03Approach expected

to be similar to 2009 rulemaking

EPA has drafted rulemaking which is currently under OMB review

Projects presumed to be separate if they are three or more years apart

Page 19: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

March 13th NSR Project Emissions Accounting Guidance

Page 20: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Project Emissions Accounting

What’s Going on with NSR? 20

1 2 3New

CT/HRSG

Project Description:• Construct New CT/HRSG• Remove Boiler #1

Emissions Increase due

to Natural Gas Combustion

Emissions Decrease due

to Boiler 1 Removal

Scope of Step 1 significant emissions increase evaluation under previous guidance – all shutdown credits in Step 2Current guidance allows shutdown credits that are part of the project

Page 21: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Project Background

Source Description: University with central powerhouse for steam and electric generation

Proposed project:

Construct new natural gas-fired CT/HRSG

Remove existing coal-fired spreader stoker boiler (Boiler 1)

What’s Going on with NSR? 21

Page 22: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

PSD Applicability Under Previous Policy

What’s Going on with NSR? 22

Step 1 – Does project result in a significant emissions increase?PM PM10 PM2.5 NOx

CT/HRSG 40.6 40.6 40.6 66.0

Above PSD? Yes Yes Yes Yes

PM PM10 PM2.5 NOx

Boiler 1 -84.0 -61.2 -38.1 -70.7

Other Changes +3.6 +3.6 +3.6 +49.5

Net Change -38.8 -17.0 6.1 +44.8

Above PSD? No No No Yes

Step 2 – Does project result in a significant net emissions increase (accounting for contemporaneous increases and decreases)?

Page 23: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

PSD Applicability Under March 13, 2018 Policy

What’s Going on with NSR? 23

Step 1 – Does Project result in a significant emissions increase?

PM PM10 PM2.5 NOx

CT/HRSG 40.6 40.6 40.6 66.0

Boiler 1 -84.0 -61.2 -38.1 -70.7

Project Emissions -43.3 -20.6 2.5 -4.7

Above PSD? No No No No

Project does not trigger PSD

Page 24: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

NSR Reforms in Proposed ACE Rule

Page 25: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

What Triggers NSR

What’s Going on with NSR? 25

NSPS – Will it result in any increase the maximum achievable hourly emissions

NSR – Will it result in a significant increase in actual annual emissions

A modification is “any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source.”

Page 26: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Major Issues with NSR Annual Test

What’s Going on with NSR? 26

Very subjective Many things affect annual emissions

According to EPA:• Replacing components (even with identical components) will

almost always cause an increase in annual emissions• Improving the efficiency of a plant will almost always cause

an increase in annual emissions

Page 27: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

NSR Reform Proposed for EGUs in ACE Rule

What’s Going on with NSR? 27

Will the project result in an increase in maximum hourly emissions? (Some version of the current NSPS test)

If so, will the project result in a significant increase in actual annual emissions? (The current NSR test)

Step 1 Step 2

Page 28: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

www.erm.com

Issues to be Resolved

What’s Going on with NSR? 28

Achieved vs. Achievable

01

What’s the baseline?• Highest hour in last

year? 5 years? 10 years?

• Statistical Approach (e.g. Upper Tolerance Limit)

• Hourly rate averaged over a representative period. 24 hours? A week? 30 days?

02

How to deal with pollutants not monitored by CEMs

03

How to deal with post project emissions data

04

Page 29: What’s Going on with NSR?...permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past

The business of sustainability

Thank you Ken WeissPrincipal Partner, [email protected]

Mr. Weiss is the founding Partner of ERM’s Air Quality Practice. He has spent a 44 -year career addressing the environmental challenges facing the private sector. Mr. Weiss obtained his first PSD permit in 1983 and more recently has played an integral role in many of the energy sector NSR enforcement cases that the EPA has brought over the past decades. He is a frequent lecturer on New Source Review and is well known to AWMA. Mr. Weiss is a contributing author to the latest revision to Perry’s Chemical Engineers Handbook as well as the recently released (June 2017) AWMA update of the New Source Review Manual previously published by USEPA.

ERM is a leading global provider of environmental, health, safety, risk, social and sustainability consulting services. ERM has more than 4,500 people in over 40 countries and territories working out of more than 160 offices.

Over the past three years ERM has worked for more than 50 percent of the Global Fortune 500 delivering innovative solutions for business and selected government clients to help them understand and manage the sustainability challenges that the world is increasingly facing.