What is BIM?2017/09/05 · What is BIM? Marc Thiel, 05.09.2017 HOCHTIEF ViCon – Marc Thiel Build...
Transcript of What is BIM?2017/09/05 · What is BIM? Marc Thiel, 05.09.2017 HOCHTIEF ViCon – Marc Thiel Build...
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Build digitally first.
Application of Building Information ModelingWhat is BIM?Marc Thiel, 05.09.2017
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
• We have gained experience from 400 projects worldwide
• Practical work and development are our strengths
• Our services are independent ofCAD software providers
• We are a HOCHTIEF Solutions subsidiary with 80% external clients
• Our clients’ value is created with professional data process management
HeadquartersEssen, Germany
Modeling BranchChennai, India
Middle East BranchDoha, Qatar
UK BranchLondon (2014)
About HOCHTIEF ViCon
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
What is BIM?
BIMis a method for optimizing
• development• planning• execution• and operation
of building and infrastructure facilities using integrated computer models and linked information.
⇒ increased knowledge⇒ higher quality⇒ lower costs
Integrated and analyzed information
BIMBuilding Information Modelling(Building/ infrastructure) GIS
Geographic Information System
data baseVarioushardware and software• Databases• Collaboration tools • MS SharePoint• Handhelds• Web EX Screen sharing• iRoom• …
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
3D-Model4D-Model5D-ModelnD-Model Structure no BW132
Designer G.Strichelt
Additional InfoLength 10,40 m
Height 7,90 m
Thickness 1,75 m
3D-Geometry
Start Date 18.08.2010
End Date 23.08.2010
Schedule
Sub NU Stahlbeton
Cost 7.200,00
Cost
Trade Stahlbeton
Material C30/37
Conctere cover 40 mm
Other BII
BoQ
3D-Model Data model
Länge 5,40 m
Höhe 2,90 m
Dicke 0,115 m
Anfangsdatum 18.08.2010
Enddatum 20.08.2010
Ausführender NU Rohbau
Kosten 517,15
Gewerk Mauerwerk
Material KSV 12-1,8
Feuerwiderst. F90
Statik nichttragend
Mietbereich MB 7
Planer G.Strichelt
Abmessungen
Ergänzende Informationen
InformationGrapical Data Numerical Data
Building Information ModelingVisual Structuring of Data / Components on large Infrastructure projects
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Model Types during Project LifecycleFor Infrastructure Projects
3D MarketingModel
3D Design Model
3D ConstructionModel
3D AssetModel
3D Schematic Model
3D QuantityModel
Phas
eM
odel
Typ
e
Concept Conceptual Design Tender & Construction Documents Construction Operation
Design / Construction / Operation of Facility2D Drawings / Product spezification / Production data / Handover & Operational data
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
BIM Use CasesBased on a digital 3D Model
3D Visualization
3D Quantity Take-off 3D Data Management
4D Scheduling
3D Design Coordination
3D Building Operation
3D Modeling
iRoom - Screensharing
Mobile data acquisition
3D As-Built Documentation
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Digital informationInformation is nothing without retrieval
– Data hard to access
– Information retrieval in weeksusing man power
– Tons of paperwork
Traditional data collection– Data easy accessible
– Information retrieval in secondsusing information management software
– less paperwork
Modern data collection
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Using digital informationInformation Management Systems
• Single source of truth
• Single point of data collection with ability for multiple uses
• Data consistency across the project
• Timely data acquisition
• Information retrieval in seconds
Information Management SystemsStructured Digital information– greater accuracy in reporting
– reducing risk of errors and saving cost
– Single point of entry
– allowing more time to assess
– ‘Live’ reporting
– Reduction in indirect costs as a result of using the system
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
ORISProject communications levels
Online Roads/Rail Information SystemOne data pool – many applications
Management / Client Reporting/ DocumentationTechnical Communication
data processing
data utilization
Progress Costs ApprovalsPhotos & Doc. Coordination3D models
Digital data embedded in processes/workflows…… made accessible for all stakeholders in the project
Open Roads
SMS CATS JHET
Project Pack
data creation
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Open Roads
SMS CATS JHET
Project Pack
Online Roads/Rail Information SystemOne data pool – many applications
Management / Client Reporting/ DocumentationTechnical Communication
ORISProject communications levels
data creation
data utilization
Progress Costs ApprovalsPhotos & Doc. Coordination3D models
data processing
Digital data embedded in processes/workflows…… made accessible for all stakeholders in the project
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Open Roads
SMS CATS JHET
Project Pack
data creation
Sensor dataSpecifications
Costs Schedules
2D drawingsPHOTOS
3D models
Bill of quantitiesOrders
Contracts
Protocols
Bills
Construction journal
Online Roads/Rail Information SystemOne data pool – many applications
Management / Client Reporting/ DocumentationTechnical Communication
ORISProject communications levels
data processing
data utilization
Progress Costs ApprovalsPhotos & Doc. Coordination3D models
Digital data embedded in processes/workflows…… made accessible for all stakeholders in the project
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Use of BIMAdvantages
• Professional, standardized production processes established on site
• Less Re - Work
• More accurate data creation and processing
• Timely data acquisition -> more time to react, better control, less risk
• Less Set-Up time for construction teams
• Savings in personnel (data administration and processing)
• Incorporation of supply chain data and processes
• Better Handover Data and As - Build information
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
The five componentsof a successful BIM Implementation
The Five Components of BIM
Data security and user managementCertified hardware and software
Data formats and structureData versioning
Internet
Collaboration and communicationKnowledge and experienceRoles and responsibilitiesTrust and commitmentCulture
Building standardsRisks and insurance
Ownership of deliverablesProject guidelines and contracts
Quantity take-offCost estimationChange managementOperation and maintenanceDesign creation and coordinationScheduling and progress monitoring
HOCHTIEF ViCon – Marc Thiel
Build digitally first.
Build digitally first.
www.hochtief-vicon.com
Better projects need better processes -
Marc ThielHOCHTIEF ViConAlfredstraße 23645133 Essen, [email protected]+49 201 824 3052