What grading system should be used to evaluate the group projects?

13
What grading system should be used to evaluate the group projects?

description

What grading system should be used to evaluate the group projects?. Problem-Solving in Groups. 1 st Define the Issue or Problem Identify problem and specify symptoms of problem Gather info on size and scope of the problem Research the seriousness, urgency,implications of the problem. - PowerPoint PPT Presentation

Transcript of What grading system should be used to evaluate the group projects?

Page 1: What grading system should be used to evaluate the group projects?

What grading system should be used to evaluate the group

projects?

Page 2: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

1st Define the Issue or Problem

• Identify problem and specify symptoms of problem

• Gather info on size and scope of the problem

• Research the seriousness, urgency,implications of the

problem.

• Look for causes and underlying conditions of the

problem

Page 3: What grading system should be used to evaluate the group projects?

Parking at LC?

Page 4: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

2nd Consider Goals and Constraints

• Identify criteria for successful achievement of goals

• Rank-order the criteria in importance

• Which criteria MUST BE MET vs less important.

• Refine goals, based on criteria, to be satisfactory

Page 5: What grading system should be used to evaluate the group projects?

Group Project Criteria

• Peer Evaluation (20%)

• Identification of Problem (20%)

• Documentation of steps to solve (20%)

• How well did group meet established timetable / accomplish tasks (20%)

• Presentation of Project (20%)

Page 6: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

3rd Brainstorm Solutions• The more ideas the better-QUANTITY!

• All ideas are Welcome!

• No criticism–All ideas are AWESOME BABY!

• Use someone else’s ideas as a springboard for additional ideas or thoughts!

Page 7: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

4th Evaluate Possible Solutions• Assign and “A” to the best one-third of ideas

• Assign a “C” to the least usable one-third

• Middle one-third automatically receives a B

• Go back to B’s and separate into A’s or C’s.

• Prioritize A’s in terms of importance/urgency

Page 8: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

5th reach a Consensus• Does everyone agree this is the best solution?

• What concerns / issues does anyone is group have.?

• Can everyone “LIVE” with this solution?

Page 9: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

6th Plan Implementation of Solution

• Develop a procedure for implementing solution with a timetable

• Is it achievable? Implementable? Too expensive? Too Long?

• Does Solution accomplish goals.

• Implement ongoing evaluation plan that occurs at regular intervals

Page 10: What grading system should be used to evaluate the group projects?

Problem-Solving in Groups

1st - Define the issue or problem

2nd - Consider the goals to be achieved and constraints on the goals

3rd - Generate possible solutions (Brainstorming)

4th - Evaluate possible solutions

5th - Reach a consensus on solution.

6th - Plan implementation of solution

Page 11: What grading system should be used to evaluate the group projects?

Cautions

• Do NOT vote (winners and losers)

• Avoid early, quick, easy compromises / agreements

• Reach the point when “ it may not be exactly what I want, but at least I can live with this decision and support it”.

• Treat differences of opinion as a way of: • Gathering additional info

• Clarifying issues

• Forcing the group to seek better alternatives

Page 12: What grading system should be used to evaluate the group projects?

Caution

Do Not compete internally. Work for welfare of group!

Page 13: What grading system should be used to evaluate the group projects?

What grading system should be used to evaluate the group

projects?