WGISS Infrastructure Task Team (WITT) Report/Proposal. WGISS15/SG14 Meeting Toulouse, FR May 2003. History. At the last WGISS and SG meetings @ UofHawaii & Alexandria, respectively; I unwisely pointed out that WGISS/SG’s “backoffice” could benefit from some additional organization. - PowerPoint PPT Presentation

Transcript of WGISS Infrastructure Task Team (WITT) Report/Proposal

Page 1: WGISS Infrastructure Task Team (WITT) Report/Proposal

WGISS Infrastructure Task Team(WITT)

Report/Proposal

WGISS15/SG14 Meeting

Toulouse, FR

May 2003

Page 2: WGISS Infrastructure Task Team (WITT) Report/Proposal

History

• At the last WGISS and SG meetings @ UofHawaii & Alexandria, respectively; I unwisely pointed out that WGISS/SG’s “backoffice” could benefit from some additional organization.

• WGISS, as smart as they are, immediately noticed my miscalculation in pointing this out, jumped on the opportunity and directed me to develop a plan to put some structure and organization to the internal operations of the WGISS.

• I accepted the challenge and made a mental note of my mistake for later reference.

• Hence the birth of the WGISS Infrastructure Task Team

Page 3: WGISS Infrastructure Task Team (WITT) Report/Proposal

Goals of the WITT• Develop a Term of Reference (TOR) for a new Task Team,

now called the WGISS Infrastructure Task Team (WITT)• Review current web pages for both WGISS and the SG

and make recommendation to improve.• Develop a new web page to reflect the new SG

organizational structure.• Develop a plan to capture meeting results and make

available via the web site.• Develop a plan for Mailing List support, DNS and web site

naming convention. • It has been decided by the WITT Lead (Jeff) that CII will

not be covered under the WITT startup phase. CII will be addressed after the WGISS/SG effort has been put in place.

Page 4: WGISS Infrastructure Task Team (WITT) Report/Proposal

WITT Members• WITT members:

– Jeff Smith/NASA-EOS/301-614-5038/ [email protected] – Sally Miller/NASA-NREN/650-604-5411/ [email protected] – Yonsook Enloe/NASA-EOS/xxx-xxx-xxxx/ [email protected] – Allan Doyle/NASA-EOS/ 781-433-2695/ [email protected] – Andy Germain/NASA-EOS/301-902-4352/ [email protected]– Stu Doescher/USGS-EDC/605-594-6013/ [email protected]

• WITT Ad hoc members (or designated representatives):– Terry Fisher/ [email protected] – Ivan Petiteville/ [email protected] – Osamu Ochiai/ [email protected] – Wyn Cudlip/ [email protected] – Paul Kopp/ [email protected] – Each WGISS and SG Secretariat

Page 5: WGISS Infrastructure Task Team (WITT) Report/Proposal

Major Sub-Tasks

• Conference Support– Pre-, during and Post- support– Presentation material gathering

• Web Site– Hosting– Content

• Mailing Lists and DNS– Mailing list maintenance– Access Authority

Page 6: WGISS Infrastructure Task Team (WITT) Report/Proposal

Conference Support 1/4

• WITT will provide a guidelines document/list of minimum support requirements– Facilities

• 1 plenary room (~50-60 people comfortably)• 1 secondary room (~25-30 people): quantity dictated by meeting

goals• Hotel coordination, logistics and/or information

– The host organization will provide a web site for meeting logistics. – A pointer to this web site will be put on the WGISS web site.

• Computer projector for both rooms• Plenty of Power strips• Print services (whether via network or disk)• Microphones • Overhead projector (optional)• Anything else??

Page 7: WGISS Infrastructure Task Team (WITT) Report/Proposal

Conference Support 2/4

• WITT to provide a guidelines document/list of desired support requirements– Internet access– WITT will provide a Wireless LAN (router) if

Internet access is provided by host and if requested by host organization

• Detailed list of network configuration requirements will be provided to host organization

– WITT will provide Mail Relay• Requires IP address of host network

Page 8: WGISS Infrastructure Task Team (WITT) Report/Proposal

Conference Support 3/4

• Conference data capture – The WGISS chair and the hosting organization will be responsible for

maintaining the agenda, both draft and final.– At the end of the meeting the WGISS chair must provide the final

agenda of the meeting to the WITT secretariat. This agenda needs to be very accurate because the WITT will use this agenda to document the meeting results. The agenda will also be used as a way for people to find a specific presentation via the web site. See http://wgiss.ceos.org/wgiss13/wgiss13inf.htm for example.

– WGISS chair and/or the host organization will provide any presentations above the SG level.

– The SG chair/vice-chair is responsible for their SG agenda and for gathering all presentations from their TTs

– The SG chair/vice-chair is responsible for an accurate agenda of their sessions. This agenda needs to be very accurate because the WITT will use this agenda to document the meeting results. The agenda will also be used as a way for people to find a specific presentation via the web site.

Page 9: WGISS Infrastructure Task Team (WITT) Report/Proposal

Conference Support 4/4

• Conference data capture (cont)– A WGISS summary of the meeting would be nice to

capture the high level results of the meeting.– A SG summary of the meeting would be nice to

capture the high level results of their SG meeting.– WITT will provide a USB/portable Memory stick

reader and memory stick to WGISS and SG chairs/vice-chairs to gather presentations.

– All presentations must be provided in a PowerPoint, Word or Excel type format.

– No FTP services at conference will be provided by WITT.

Page 10: WGISS Infrastructure Task Team (WITT) Report/Proposal

Web Hosting

• Proposal: – Move the WGISS and SG pages to a Web

hosting company.

• Benefit:– Makes changing of Chairs easier because the

outgoing and incoming chairs will not have to move the web site.

– Remove any organization specific policies regarding web site hosting (eg. Accessibility, security, etc).

Page 11: WGISS Infrastructure Task Team (WITT) Report/Proposal

Web Hosting Requirements

• Web pages (Duh)• Storage: support all WGISS & SG information

– Document Repository: To save disk space, documents will not reside at the Web Hosting site, but at a server to be defined later. Maybe the WGISS Chair’s site?

– Pointers will be provided to Documents– Meeting presentations: See Conference Support Section

• Mail list support– See Mailing List Section

• FTP service– Must support in case we host some documents local

Page 12: WGISS Infrastructure Task Team (WITT) Report/Proposal

Web Site Content• Content (draft URL: http://dev.nren.nasa.gov/wgiss/ )

– About WGISS– WGISS, SG and TT descriptions– WGISS and SG Chairs/vice-Chairs, TT Leads, and agency

representatives contact information– TT web pages will be handled by TT Lead, unless otherwise requested

by the TT Lead– Links to Plenary page– Links to EOGEO and other pertinent sites– Events past and future (mainly WGISS and SG) - Also see “Conference

Support”• Past meeting presentations will be made available via FTP in both original

format and PDF.• Admin

– Only WITT Lead’s designated representative, Web Master, and WGISS and Subgroup secretariats will have write access to edit web pages.

Page 13: WGISS Infrastructure Task Team (WITT) Report/Proposal

Mailing Lists and DNS

• WGISS and SG mailing lists will be supported by the web hosting company

• Administrative control provided by WITT Lead’s representative.

• The mailing lists will be reviewed at each SG meeting• The mailing lists will not be made public• Requests for joining WGISS and SG mailing lists should

be approved by the Chairs or vice-chairs• TT mailing lists will be supported by the TT Lead, unless

otherwise requested by TT Lead.• DNS registration and sustaining support will be provided

by the WITT.• Naming structure will be discussed the WITT session