WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics)...

15
WG5 - MAS Progress Report at TP #10 roup Name: WG5 MAS (Management, Abstraction & Semantics) ource: WG5 Chairs eeting Date: 2014-04-07 to 2014-04-11 genda Item: TP#10, Item 14, Reports from Working Groups

Transcript of WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics)...

Page 1: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

WG5 - MAS Progress Report at TP #10

Group Name: WG5 MAS (Management, Abstraction & Semantics)Source: WG5 ChairsMeeting Date: 2014-04-07 to 2014-04-11Agenda Item: TP#10, Item 14, Reports from Working Groups

Page 2: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Issues for DECISION in TP

© 2014 oneM2M PartnersTP-2014-0022

2

N/A

Page 3: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Issues for DISCUSSION in TP

• Issue 1:<text>

• Issue 2:<text>

© 2014 oneM2M PartnersTP-2014-0022

3

N/A

Page 4: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Items for INFORMATION

• Latest contribution status can be found in– MAS-2014-0364R08-MAS_10_0_contribution_list

© 2014 oneM2M PartnersTP-2014-0022

4

Page 5: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Highlights• TS-0001 Functional Architecture

– Agreed contributions for ARC endorsement (see final status in ARC report):• ARC-2014-1277R01 mgmtCmd CR• ARC-2014-1233R04 Correction of node resource• ARC-2014-1266 remove-parameters-resource• ARC-2014-1265R01 modify-deviceCapability• ARC-2014-1264R01 modification_to_mgmtObj_procedure• ARC-2014-1192R03 Cleanup of editors notes and highlights in ASM and DMG CSFs• ARC-2014-1268R02 managements_to_nodes• ARC-2014-1278R02 Conversion_of_CMDH_Policies_to_mgmtObj• ARC-2014-1286R03 define mgmt objects for SCA resource• ARC-2014-1269R02 state-machine-for-sw-mgmt• MAS-2014-0365R03 App-ID Additional Clarification Text• MAS-2014-0368 Editorial updates to correct grammar and proper wording

– Stage 2 clean up regarding management aspect is considered as 95% complete

© 2013 oneM2M PartnersTP-2014-0022

5

Page 6: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Highlights• TS-0004 Protocol– Agreed contributions for PRO endorsement (see final

status in PRO report):• PRO-2014-0154R02 mgmtCmd & execInstance

– Stage 3 work on management is just beginning, further contributions are invited on • data type definition• common primitives & procedures regarding <mgmtObj>, ontologyRef• Investigate changing from <mgmtObj> resource type to {mgmtObj}

prototype

© 2013 oneM2M PartnersTP-2014-0022

6

Page 7: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Highlights• TS-0005: Management enablement (OMA)

– Agreed contributions:• MAS-2014-0351R02 Resource Mapping for OMA DM• MAS-2014-0352R04 DataType Identification Mapping for OMA DM• MAS-2014-0355R01 resource-mapping-for-management• MAS-2014-0366R03 DataType_Identification_Mapping_for_OMA_LWM2M• MAS-2014-0367R03 Resource Mapping for OMA LWM2M

– Output version: v0.1.0– Current status: draft (40%)– Milestone forecast: No change.

• TS-0006: Management enablement (BBF)– No input contribution.– Input version: v0.1.0– Current status: draft (40%)– Milestone forecast: No change.

© 2014 oneM2M Partners<Document number>

7

Page 8: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Highlights

• TR-0007: Abstraction & Semantics TR– Agreed contributions:

• MAS-2014-0356 proper_usage_terminologies_ABS_TR• MAS-2014-0354R02 Device+DeviceTemplate-Modelling• MAS-2014-0353R01 Architectural Considerations for Semantic Support• MAS-2014-0359R01 Key Issues on Semantics and Ontologies

– Output version: v0.8.0– Current status: Draft (60%)– Milestone forecast: No change.

© 2014 oneM2M Partners<Document number>

8

Page 9: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Open Issues

• Management Attribute injection (i.e. {mgmtObj} prototype)?– Investigate changing from <mgmtObj> resource type to {mgmtObj}

prototype in stage 3 first– Potential CR to ARC TS 1.1 according to stage 3 development

• In the case that single <mgmtObj> resource mapped to multiple underying dm technologies (OMA DM 1.X/2.0, LWM2M, TR069), the mapping of attributes objectID and objectPath need FFS??

© 2014 oneM2M Partners<Document number>

9

Page 10: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Open Action Items

© 2014 oneM2M PartnersTP-2014-0022

10

# Action Item Description Owner Status

A-WG5-9.0-001

TS-0004: CMDH Policies data type Qualcomm OPEN

A-WG5-9.0-002

TS-0004: <mgmtObj> resources schema, primitives, procedures

Huawei, LGE, Qualcomm

OPEN

A-WG5-9.0-003

TS-0004: <mgmtCmd> resources schema, primitives, procedures

IDCC OPEN

A-WG5-9.0-004

TS-0005: Mapping to DM1.x Huawei, LGE OPEN

A-WG5-9.0-005

TS-0005: Mapping to DM2.0 LGE, Gemalto OPEN

A-WG5-9.0-006

TS-0005: Mapping to LWM2M LGE, Gemalto, Ericsson

OPEN

A-WG5-9.0-007

TS-0005: New objects (CMDH Policies, charging policies) Qualcomm OPEN

A-WG5-9.0-008

TS-0006: Mapping to BBF TR069, New objects (CMDH Policies, charging policies)

ALU, Qualcomm OPEN

*Blue items are addressed in TP#10 and before

Page 11: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Open Action Items (new)# Action Item Description Owner Status

A-WG5-10.0-001

to ensure oneM2M requirements are correctly shared with HGI / BBF Smart Home team on Device Template activity.

NEC, Orange OPEN

A-WG5-10.0-002

to put in the ARC issue list for further refinement of the terminology of 'instance' of <mgmtObj> resource to refer to the sub-class of <mgmtOjb> resource, e.g. [CMDHPolicies]).

Nicolas OPEN

A-WG5-10.0-003

TR-0007: consistency check regarding the terminology of 'entity' vs. 'device'

Martin (NEC) OPEN

A-WG5-10.0-004

TS-0006: draft recommendation of instantiating the resource uri (e.g. node name) based on the device/object instance names of underlying dm technologies.

Tim (ALU) OPEN

A-WG5-10.0-005

TR-0007: lead the restructuring of TOC NEC, Modacom OPEN

Page 12: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Next Steps - Management• May have further refinement on TS-0001 (Functional

Architecture) jointly with WG2 on Management Aspects. • Progress TS-0004 (Protocol) jointly with WG3 on Management

Aspects.– Mangement data types, resource schema, primitives, procedures– See open AIs

• Progress TS-0005 (OMA) & TS-0006 (BBF)– Mapping of basic data types, identifiers, existing resources from TS-

0004, DM Server Interactions, New Objects (e.g. CMDH Policies)– See open Ais

© 2014 oneM2M Partners<Document number>

12

Page 13: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Next Steps – Abstraction & Semantics• Progress TR-0007 (WI-0005: Abstraction & Semantics

Study)– Restructuring– Develop common terminologies, levels/features/stages of

semantic support– Converging on architectural impact based on ARC TS R1

© 2014 oneM2M PartnersTP-2014-0022

13

Page 14: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.

Next Meetings / Calls

• Conference Calls– MAS#10.1 (mgmt): Apr 28th 2014, UTC 13:00-15:00– MAS#10.2 (semantics): May 12th 2014, UTC 13:00-15:00– PRO#10.4 (joint WG3): May 13th 2014, UTC 12:00-15:00– MAS#10.3 (mgmt): May 19th 2014, UTC 13:00-15:00– MAS#10.4 (joint WG3): May 26th 2014, UTC 13:00-15:00

• Face-to-Face– MAS#11.0: Jun. 9-13, Xian, China

© 2014 oneM2M PartnersTP-2014-0022

14

Page 15: WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: 2014-04-07 to 2014-04-11.