WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

6
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani

Transcript of WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

Page 1: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

WG3: Main Linac

H. Hayano, C. Nantista, C. Pagani

Page 2: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

Main Linac session (blue part) : Time chart

Page 3: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

March 27, Saturday

Tunnel Layout (Joint with CFS)

HLRF (Joint with CFS)

Main Linac Integration (Joint with Beam Dynamics)

CFS Tunnel Status T. Lackowski

Klystron Cluster Equipment C. Nantista

DRFS Equipment S. Fukuda

General Installation Equipment I. Ruehl

DRFS Development Shigeki Fukuda

Power supply for DRFS Mitsuo Akemoto

LLRF consideration for DRFS Shinichiro Michizono

KCS Development Chris Natista

HOM's and Gradient Spread Chris Adolphsen

discussion w/ CFS (V. Kuchler)

Flash overview Nicholas Walker

Analysis of FLASH Beam on Gradient Stability Data Shilun Pei

9mA FLASH Workshop Summary Shinichiro Michizono

Update of RTML, FNAL BPM and Split SC Quad Nikolay Solyak

Split SC Quad Nikolay Solyak

Lorents Force Detuning Studies at STF Yasuchika Yamamoto

Linac Beam Dynamics Update Kiyoshi Kubo

( DRFS, Klystron cluster )

( Flash, others )

Page 4: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

March 28, Sunday

Cavity

Cavity Integration

Summary of understanding of quench limit in 9-cell cavities using T-mapping and optical inspection

Yasuchika Yamamoto, Sebastian Aderhold

Latest 9-cell cavity testing results from FNAL Joe Ozelis

Recent cavity test results from KEK Eiji Kako

New results on field emission suppression Rongli Geng

Comparison EP procesing parameters at KEK and JLAB Takayuki Saeki

IHEP high gradient efforts on 1.3 GHz 9-cell cavity for ILC Jie Gao

Efforts on the R&D of SRF cavity at Peking University Ke-Xin Liu

Replica-method and local grinding repair Ken watanabe

Review of plans for upcoming cavity processing and testing Camille Ginsburg

Review on ACD topics (new shape, large-grain cavity,vertical EP etc) Zack Convey, Fumio Furuta

Update on global cavity database and yield evaluation Yasuchika Yamamoto, Camille Ginsburg

Status report of DESY activities Eckhard Elsen

discussion

Operational Gradient re-evaluation discussions

ILC Gradient R&D status and challenges Rongli Geng

Gradient strategy proposal A. Yamamoto

discussion

Test facility status, tuner&coupler plug-compatibility discussionsStatus of NML Bob KephartStatus of STF Hitoshi Hayano

R&D status in INFN PisaCarmine Elvezio Pagliarone

discussionPlug-compatibility document H. Hayano

Joint with BDSfor 10Hz operation(HLRF, Cryo people)

( Operational gradient re-evalution, Test facilities)

Page 5: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

March 29, Monday

Cryomodule, Cryogenics

Industrialization

S1-G Cryomodule assembly status Norihito OhuchiS1-G Cavity assembly status Eiji KakoS1-G RF preparation Shigeki Fukuda

Proposal of experiment schedule of S1-G cryomodule

Hitoshi Hayano

Cavity test plan Eiji KakoRF test plan Shinichiro MichizonoCryomodule thermal test plan Norihito Ohuchi

Preparation of Industrialization, R&D planFNAL industrialization study status Bob KephartIndia industrialization study status Shekhar Mishra KEK industrialization study status H. HayanoStatus of XFEL module assembly facility at Saclay

Olivier Napoly

For IPAC indutrialization session Jim Kerby

( S1-Global experiment )

Page 6: WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.

2nd floor, room 202: Main Linac session