WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background...

10
WG2

description

§2. Integration of pre- and post- closure safety in the SC Modify title of §2.1: « The stepwise evolution of the SC » (SC already discussed in §1) Add §2.3 describing the proposed approach for the integration (introduction to §3) Add an explanation in §2.2 of the implications for the management of uncertainties throughout the different phases of repository development Define « handshake » in the glossary Insert explanation and figure on the integration of operational and post-closure safety functions illustrating the « handshake »

Transcript of WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background...

Page 1: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

WG2

Page 2: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§1. Introduction• Simplification of the introduction, e.g.:– New structure

1. Background2. Objectives3. Scope

– Synthesize some of the information• Background should include:– §1.1.1 (« risks »), §1.1.2 (« safety »), §1.1.3 and §1.2– An explanation of the different types of risks associated

with geological disposal • Add preservation of memory in the specificities of a

GDF (§1.1.3)

Page 3: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§2. Integration of pre- and post-closure safety in the SC

• Modify title of §2.1: « The stepwise evolution of the SC » (SC already discussed in §1)

• Add §2.3 describing the proposed approach for the integration (introduction to §3)

• Add an explanation in §2.2 of the implications for the management of uncertainties throughout the different phases of repository development

• Define « handshake » in the glossary• Insert explanation and figure on the integration

of operational and post-closure safety functions illustrating the « handshake »

Page 4: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

Pre/Post-closure Interface

4

Page 5: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§3. SE, DT & as-built state (1/3)• Add an explanation of the figure in §3.1 (How to interprete it

? Not a « geometrical » boundary) • Add examples to facilitate the understanding of the different

concepts• « Initial state »

– The term should be clearly defined/explained (§2.3) – Discussion on the initial state that needs to be considered in the

post-closure SA throughout the different phases of repository development ( SE vs. DT vs. as-built state) (See 1st & last figures of §3.3)

• Enlarge the scope of the « parameters »:– Include all parameters that need to be monitored in the

management system (not only physical barriers)

Page 6: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§3. SE, DT & as-built state (2/3)• Robustness not discussed => explain link between SE and

robustness• Explain what is included in the « safety margins »:– include also all uncertainties associated with construction

and operation (e.g. unc. on testing methods, construction methods,…)

• Explain the different causes of design changes (REX, optimisation, changes in waste characteristics, unexpected conditions,…)

• 2nd & 3rd figure of §3.3: Indicate on the figures what the implications are (e.g. « design changes are required », « unacceptable situations »,…)

Page 7: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§3. SE, DT & as-built state (3/3)• Last figure of §3.3: Use the same format/design as

previous figures for the as-built state• Add title and numbers for each figure• Reformulate last sentence where it is suggested that

the proposed approach does not apply to closure works

Page 8: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§4. Compliance Control• Restructure to clarify the differences between §4 & §5• Operational Limits and Conditions (OLCs) are not

mentionned in the document (Parts of the DT ?)• How to deal with parameters that can’t be

measured ?:– Implications for uncertainty management– Implications for QA– ... ?

• §4.3: Add examples of the different types of parameters associated with requirements that need to be monitored (not only physical parameters)

Page 9: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

§5. Managing Deviations• §5.1:– « Design changes » should be explicitely identified as a

possible action– Reformulate the 3rd bullet:

• Additional margins can be claimed if work is performed to reduce uncertainties (e.g. more detailed characterization of local conditions)

• The formulation « Reviewing the SC » might be confusing• Figure:– Clarify the term « assessment » (= assessment of

compliance , not SA)– Closure should appear clearly

• Deviations from the SE should also be addressed

Page 10: WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.

Suggestions for IAEA• For electronic publications, link with the

definition of key terms would greatly facilitate the comprehension (e.g. pop up of small a box with definition)

• Suggestion of future IAEA initiative: Activities allowing Member States to share experience and practices and aimed at developing guidance on « requirement management »

• Consider where this TECDOC would assist or should be referenced from existing IAEA documentation