WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint -...

12
Update from Working Group 1 Trevor J. Stocki

Transcript of WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint -...

Page 1: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Update fromWorking Group 1

Trevor J. Stocki

Page 2: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Outline

• Scenario C The Chalk river model.• Marine model scenario (Sizewell,

Scenario A)• Update on iodine (Sizewell, Scenario A)• Final report.

Page 3: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Scenario C

• We will be modeling aquatic releases to the Ottawa River from Chalk River Labs.

• A template for the scenario has been set up.

• Each participant looked at this in advance of the meeting.

• We identified possible problems and took measures to solve them.

Page 4: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Scenerio A v2: Marine Results

Page 5: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Concentration in water

Page 6: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Understand differences

• France and Brazil have plume models.• UK box model. • The concentration in water is different by a

factor of about 20x. • The results are different by about a factor

of 20.

Page 7: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Scenario A v2 Iodine

• We found problems with deposition velocity.

• We are still investigating other differences.• Another difference is feeding habits of the

cows. • We will go back to our institutes to

investigate, further.

Page 8: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Training

• We had demos of the code CROM by Juan Carlos

• We also had a demo of Symboise by Christophe.

Page 9: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Final report: getting close to the end

• We have set up an outline for our final report.

• We have tasked out sections.

• We have sent deadlines for these tasks.

Page 10: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Next meeting

• We will either have our next meeting in Canada (after the Hamilton Conference) or Austria (in September as back up).

Hamilton Ottawa

Page 11: WG1 Update from Working Group 1 Vienna friday2011.ppt · 2011. 3. 16. · Microsoft PowerPoint - WG1 Update from Working Group 1_Vienna_friday2011.ppt [Compatibility Mode] Author:

Final remarks

• Scenario A is done except for iodine.• Scenario C is started, hope to have the

modeling done before the summer meeting.

• We are also starting to write our final report.