REAL RESULTS LOWER COMPLETIONS | COMPOSITES
TruFrac® Composite Plug Accelerates Plug-and-Perf Operation with Average Mill-Out Time of 10.5 Minutes
Objectives
• Decrease time on location during the mill-out phase of a plug-and-perf operation.
Our Approach
• Weatherford deployed TruFrac composite plugs—made of 97 percent premium composite material— in 26 zones.
• The coiled tubing (CT) and rock bit drilled the plugs out in an average time of 10.5 minutes per plug without short trips.
Value to Client
• The short length and low metallic content of the TruFrac composite plug helped to reduce mill-out and on-location time, which enabled the operator to begin producing the well faster.
• The reduction in on-location time and associated costs improved overall well economics.
LOCATION Eagle Ford Shale
WELL TYPE Onshore, oil
PRODUCTION CASING 5-1/2 in., 23 lb/ft (139.7 mm, 34.2 kg/m)
BOTTOMHOLE TEMPERATURE 285°F (140.5°C)
TOTAL MEASURED DEPTH 18,325 ft (5,585 m)
LATERAL LENGTH5,667 ft (1,727 m)
CIRCULATING PRESSURE6,500 psi (44.8 MPa)
WELLHEAD PRESSURE4,000 psi (27.5 MPa)
PRODUCTS/SERVICESTruFrac 10K top ball frac plug
BOTTOMHOLE ASSEMBLY• 4 3/8-in. JZ 126 rock bit
• 3 1/8-in. mud motor
• Agitator
• Jar
• 2 3/8-in. high-pressure CT unit
TruFrac plugs are made with a proprietary blend of 97 percent premium composite material, which enables higher run-in speeds and more efficient milling, and provides superior sealing and anchoring.
weatherford.com
Weatherford products and services are subject to the Company’s standard terms and conditions, available on request or at weatherford.com. For more information contact an authorized Weatherford representative. Unless noted otherwise, trademarks and service marks herein are the property of Weatherford and may be registered in the United States and/or other countries. Weatherford products named herein may be protected by one or more U.S. and/or foreign patents. Specifications are subject to change without notice. Weatherford sells its products and services in accordance with the terms and conditions set forth in the applicable contract between Weatherford and the client.
© 2015 Weatherford. All rights reserved. 11735.01
Plug # Drill-Out Time
1 9 min
2 15 min
3 15 min
4 11 min
5 9 min
6 12 min
7 9 min
8 8 min
9 12 min
Plug # Drill-Out Time
10 10 min
11 7 min
12 12 min
13 13 min
14 11 min
15 7 min
16 8 min
17 8 min
18 16 min
Plug # Drill-Out Time
19 17 min
20 7 min
21 7 min
22 7 min
23 11 min
24 13 min
25 11 min
26 8 min
AVG. 10.5 min