We’ve prepared a module estimate for
i) BNRGSK building at Block Hqrs of Rs.25 lakhs each.
ii) BNRGSK for GP Hqrs of Rs.10 Lakhs each.
iii) Farm Ponds
iv) Field Bunding
at DRDA,and circulated to all Blocks for adoption,which has helped us to maintain uniformity & speedy execution of projects.
Awareness Programme
A) MGNREGA Rath was made with various display banners explaining all aspects of MGNREGA in local language and was moved to villages forecasting the awareness among people.
B) MGNREGA Mela was conducted at Panchayat level where PRI members, SHG members ,Asha Karmi in addition to the villagers were invited.The problems & suggestion were discussed in the Mela.
C) Maha Palli Sabha was also called from 16th to 22nd May-2010 for selection of projects by the Pallisabha.
Steps taken for Quick completion of projects
Small projects are taken up and steps taken for complete those in a single phase, like
small village roads, Small Farm ponds etc. Villagers are encouraged for coming
together and finish the work within the scheduled time for work.
SUCCESS STORIES-NANDAPUR
Name Of The Project : Ghat Cutting of Road from B.Rukba to Panasput Name of the Village / G.P : B.Rukba / Khemunduguda
Eastimated Cost : Rs.3,00,000/- Scheme / Year : MGNREGS / 2009-2010 Mandays Generated : 4750 Total length of Road : 1.20 KMs Works Executed : Ghat cutting in stony earth, Rs dry masonry guardwall,
Rs dray packing cause ways. Date of Starting : 20.12.2009 Date of Completion : 23.02.2010
Name of the Work- Const.of D/W with F/C at Khagadora
Est.Cost- 5.00 Lakhs
Scheme- MGNRGA-2008-09
Village- Khagadora
G.P- Dumuripadar
Date of Starting- 15/02/2009
Date of Completion- 17/09/2009
Total Length- Masonary- 352 Meter
Earthen- 1287 Meter
Description- It reaches to area of 17.5 Acres which has uplifted the living status of tribal.
Name of Work- Const.of road from Girliput to BadapadarEst.cost- 4.00 lakhsScheme- MGNREGS-2009-10Gp- KENDARTotal Mandays- 2695Wage component- 2.42 Lakhs
Description- The road connects the villages Kusumguda, Bondakatra, Mastiguda and Bilaput. Earlier tribals are to travel 18 kms to reach block Hqr.
BEFORE AFTER
Name of the Project - Construction of W.H.S. at batakuhudiVillage- Batakuhudi
Gram Panchayat - Dhamanahandi,Block - Kotpad
Dist. - KoraputScheme - NREGA,
Year - 2008-09.Esst. Cost - Rs 5.00 Lakhs
The cross bond was constructed over the perennial nallah called sunakota nallaby which the water rises to the cultivable land and after completion of this project about
50acr land get irrigated which was previously a dry land.
BEFORE AFTERName of the Project - Construction of new tank at Colony 7
Village - S.B.NuagamGram Panchayat- S.B.Nuagam,Block - KotpadDist. - KoraputScheme - NREGA,Year - 2008-09.
Esst. Cost - Rs 5.00 Lakhs The tank at Colony 7 was the dmand for the people of S.B.Nuagam village since
long and the tank was excavated out of NREGA and 5055 no of mandays generated out
of this project. 25 acr cultivable land get irrigated by this tank.
PROJECT PROFILE Name of the Work- Const.of Tank at Kaudiaguda
Name of the Scheme- NREGS(O) 2008-09Estimated Cost- Rs.5.00 Lakhs
Unskilled labourers- Provide employment to 4452 mandaysRemarks-
After this project the villagers of Kaudiaguda are mostly benefited During requirement of irrigation facilities around 22 Acres of agriculture field has been provided irrigation facilities . Around 28 numbers of ST households and 18 numbers of SC household are benefited after completion of this project.
PROJECT PROFILE 1. Name of the Work- Const.of farm pond of Sri.Jadu Kendu Hatoguda of Lima
Name of the Scheme- NREGS(O) 2007-08Estimated Cost- Rs.0.35 Lakhs
Unskilled labourers- Provide employment to 500 man daysRemarks-
After this project the beneficiary Jadu Kundu of Hatoguda village of Lima GP is highly benefited during his vegetable cultivation of around 2 Acres throughout the year.His
economic status has been increased consturcion of farm pond through NREGS scheme and he is highly appreciate to get the benefit through scheme. The unskilled labourers are
Mostly Benefited during the Execution of the Work.
PROJECT PROFILE Name of the Work- Const.of CC road at Digapur
Name of the Scheme- NREGS(O) 2008-09Estimated Cost- Rs.3.00 Lakhs
Unskilled labourers- Provide employment to 1752 man daysRemarks-
After this project the villagers of Digapur ,Nuaguda, Nadialpallyare communicated with GP HQRs Digapur. Around 48 numbers of ST households and 22 numbers of SC household are benefited after completion of this project.
Name of the Work :- Const of Diversion weir with F/C at Maliput Village of Pottangi Block.
Name of the G.P :- MaliputName of the Village :- Maliput.
Estt. Cost: :- Rs3,00,000/-Scheme :- NREGS-09/10 (Water Bodies)
Desc-A perinial Source emerging from Purunapadar village is crossing the NH-43 under a culvert where the water was bonded by an earthen cofferdam by villagers for irrigation purpose . The cofferdam was washed away by rains in every year.
As per the persistence demand of farmers a concrete permanent diversion weir was to be constructed along the nallah, which will irrigated more aycut area like 10.00 hectares .
SGSY-Infrastructure of Cost- 15.00Lakhs