New Transport Engineering
Technology Centre for
Wetherill Park TAFE
![Page 2: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/2.jpg)
New Transport and Engineering Technology
Centre for Wetherill Park TAFE The 19th June 2013, the state government announced the approval for funding which would allow the construction of the Transport and Engineering Technology Centre at Wetherill Park TAFE
“The project will shift in delivery to simulation, technology based training and industry projects. Simulation technology will be implemented across the areas of engines and transmissions, fuel systems, electronics, fluid power and driving simulation for heavy vehicles. Expansion of E-learning and the roll out of the National Broadband Network will allow SWSI to facilitate direct learning in the work place. This will allow the student to learn on the job via remote technology. It will also provide an industry training hub for the sector to advance the industry on a global front.”Extract from media release,Adrian Piccoli MP, 19/6/2013
![Page 3: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/3.jpg)
The following slides outline the recent proposals for the Transport Engineering Technology Centre at Wetherill Park TAFE.
Plans and diagrams displayed were discussed at PCG9 (Project Control Group meeting #9) held at Wetherill Park TAFE, 19/5/14.These slides, do not represent the final design, and the images used are for illustrating ideas and concepts.
Feedback is to be channelled back to the Project officer,[email protected]
New Transport and Engineering Technology
Centre for Wetherill Park TAFE
![Page 4: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/4.jpg)
New Transport and
Engineering Technology
Centre for Wetherill Park TAFE
Wetherill Park TAFE was officially opened on the 9th
September 1981 by Minister for Education,the Hon. Paul Landa LL.B. M.L.C.
Today, Automotive Programs are delivered in the following locations at Wetherill Park College:
• Light Vehicle Programs delivered in CP BLOCK• Heavy Vehicle and Plant Programs delivered in:
• DP BLOCK (electrical & diesel)• H BLOCK (engines , gear boxes, and final drives)• F BLOCK (brakes, frames, hydraulics and
commercial classes)• M BLOCK (stage 1 apprentice classes)
• Auto Electrical Programs delivered in CT, CP, DP & F
Blocks.
CP
F
M
DP
H
CT
![Page 5: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/5.jpg)
• Staff accommodation (staff rooms and offices for head teachers, teachers and clerical support staff) for automotive programs at Wetherill Park are located on the ground and second floor of J Block, and in CT Block.
• J block also presents access issues for disabled persons wishing to visit staff accommodated on the second floor, as there are no ramps or lifts for wheel
chair access.
CT
J
Current location of staff accommodation for automotive programs at Wetherill Park TAFE
![Page 6: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/6.jpg)
Capital Works
Overview
Construction of Transport Engineering and Technology Centre (Blocks CP & F) will include:• 9 multi purpose automotive labs,
average size 79sqm each.• Covered workshop area to be
increased from 2500sqm to over 4000sqm.
• Wi-Fi connectivity throughout workshop with charge stations for student’s e-learning devices.
• Student amenity area of approx. 80sqm with Wi-Fi access and meal preparation areas.
![Page 7: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/7.jpg)
Capital Works
Overview
The capital works project also includes the refurbishment of A Block.
The refurbishment will provide new staff accommodation for Automotive Teaching staff.
Design includes:• Open plan office design• 5 offices for 10 head teachers• Workstations for 36 teachers• Formal reception for industry guests• Provisions for outdoor breakaway
area for teaching staff
![Page 8: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/8.jpg)
Capital Works
Overview
The capital works project also includes the removal of the following structures .
• Y Block which will create more open space for students outside class time.
• K Block (old spray booth) and MS(storage shed) for improved street appearance
![Page 9: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/9.jpg)
Western Elevation
This drawing is the artist’s impression of how the new centre will appear once the roof is constructed above CP & F Blocks as viewed from the service road entering from the lights at The Horsley Drive. Click here from the existing building appearance.
![Page 10: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/10.jpg)
Western Entrance
![Page 11: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/11.jpg)
Eastern Elevation
This drawing is the artist’s impression of how the new centre will appear once the roof is constructed above CP & F Blocks, creating a Covered Open Learning Area(COLA), as viewed from DP Block.Click here from the existing building appearance.
![Page 12: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/12.jpg)
Western Elevation A, CP and F
Blocks
This drawing is the artist’s impression of how the new centre will appear once the roof is constructed above CP and F Blocks, along with the refurbished staff accommodation in A Block as viewed from the service road entering from the lights at The Horsley Drive.
![Page 13: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/13.jpg)
C Block Viewed from A Block
![Page 14: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/14.jpg)
Transport Engineering Technology
Centre
Utilisation of floor space in work shop is for illustrative purposes and needs to be worked through with head teachers, after a review of resources and teaching programs.
New roof, creating a Covered Outdoor Learning Space
![Page 15: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/15.jpg)
Transport Engineering Technology
Centre
A student amenities area will be created.Students will have access to:• Comfortable indoor
and outdoor areas for lunch and after class activities
• High speed Wi-Fi access for pre/post class study groups
• Kitchen facilities
![Page 16: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/16.jpg)
3D Visual Impression from inside
CP Block looking East
Existing roof materials between CP and F block to be removed with a single roof to extend over CP and F blocks creating a large flexible learning space
Over 12metres high
![Page 17: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/17.jpg)
3D Visual Impression from inside
CP Block looking East
Labs to have glass walls both on exterior walls and walls facing the workshop for lighting and security/management improvements
![Page 18: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/18.jpg)
3D Visual Impression from inside
F Block looking East
For improved lighting and energy efficiencies, roof and some exterior walls to be constructed using translucent materials. Workshop floor to be treated with a reflective finish for added improvements.
![Page 19: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/19.jpg)
Transport Engineering Technology
Centre
Considerations for the labs in CP Block include:• New comfortable and flexible seating designs
![Page 20: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/20.jpg)
Transport Engineering Technology
CentreConsiderations for the labs in CP Block include:
• New comfortable and flexible seating designs• Use of glass for internal and external walls for
improved security and lighting efficiencies
![Page 21: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/21.jpg)
Transport Engineering Technology
CentreConsiderations for the labs in CP Block include:
• New comfortable and flexible seating designs• Use of glass for internal and external wall for
improved security and lighting efficiencies• Large, easy to view, high definition,
interactive display devices
![Page 22: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/22.jpg)
Transport Engineering Technology
CentreConsiderations for the labs in CP Block include:
• New comfortable and flexible seating designs• Use of glass for internal and external wall for
improved security and lighting efficiencies• Large, easy to view, high definition,
interactive display devices• High-speed Wi-Fi connectivity for students,
with on-site server ensuring stable delivery of lessons.
![Page 23: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/23.jpg)
Transport Engineering Technology
CentreConsiderations for the labs in CP Block include:
• New comfortable and flexible seating designs• Use of glass for internal and external wall for
improved security and lighting efficiencies• Large, easy to view, high definition,
interactive display devices• High-speed Wi-Fi connectivity for students,
with on-site server ensuring stable delivery of lessons. (“drop-outs”)
• Climate controlled class rooms for improved student comfort
![Page 24: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/24.jpg)
Transport Engineering Technology
CentreConsiderations for the labs in CP Block include:
• New comfortable and flexible seating designs• Use of glass for internal and external wall for
improved security and lighting efficiencies• Large, easy to view, high definition,
interactive display devices• High-speed Wi-Fi connectivity for students,
with on-site server ensuring stable delivery of lessons. (“drop-outs”)
• Climate controlled class rooms for improved student comfort
• Storage cabinets that can be easily moved to suit the lessons being delivered
![Page 25: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/25.jpg)
Accommodation for Automotive
StaffA Block will be completely refurbished, creating an open plan office for the automotive teaching staff.Main design features include:• Formal reception for
industry visitors• Work spaces for up to 36
teachers• 5 private offices for up to
10 head teachers• Staff amenities room to
accommodate 18 staff• Provisions for out door
break away area
![Page 26: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/26.jpg)
CP BLOCK F BLOCK
Existing Workshops View from Front Service road off The Horsley Drive
![Page 27: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/27.jpg)
NEW ROOF SPAN
CP BLOCK
Existing Workshops Viewed from the front of DP BLOCK
![Page 28: Wetherill Park Planned Major Capital Works](https://reader033.fdocuments.in/reader033/viewer/2022052909/55978c801a28ab691e8b45e1/html5/thumbnails/28.jpg)
END OF PRESENTATION