Westminster Presbyterian Church SITE PLAN, GENERAL NOTES...
Transcript of Westminster Presbyterian Church SITE PLAN, GENERAL NOTES...
1
A101
BUILDING SECTION
WALL SECTION
1
A101
ENLARGED DETAIL
ELEVATION MARK
1 /A101SECTION DETAIL
1
A101
1
A101
KEY TO SYMBOLS:
KEYED NOTE1
A101
1
1 1
1
FLOOR OR DATUM LEVEL
TREES
ROOF DRAIN
DOWNSPOUT
RD
DS
#TITLE1/8" = 1'-0"
VIEW MARK
EARTH
MATERIAL SYMBOLS
GRAVEL OR POROUS FILL
CONCRETE MASONRY UNIT
STONE
CONCRETE
FIBROUS INSULATION
FIBER BOARD OR RIGID INSULATION
PLASTER, GYPSUM WALL BOARD, MORTAR, OR PARTICLE BOARD
FINISHED WOOD
ROUGH WOOD
PLYWOOD
STEEL OR IRON
ALUMINUM
WESTMINSTER PRESBYTERIAN CHURCH
SEXTON HOUSEENTRY
BUTZER SCHOOL BUILDING
GARAGE
DE
LA
WA
RE
AV
EN
UE
PARKING AREA
SUMMER STREET
CONSTRUCTION VEHICLE NOTE:CONTRACTORS ARE PROHIBITED FORM PARKING VEHICLES IN UNDESIGNATED AREAS. NO VEHICLE CLEANING (I.E. CONCRETE DELIVERY, TOP SOIL DELIVERY, ETC.) IS PERMITTED ON SITE.
CONTRACTOR PARKING. SIX (6) SPACES WILL BE RESERVED (BY ORANGE CONE) FOR CONTRACTOR USE M-F DURING WORK HOURS
JB
JBJBJB
30
' -
0"
24
' -
6"
18' - 5" 60' - 0"
PROTECT TYP.
PROTECT TYP.
PROTECT TYP.
FLAGSTONE
CONCRETE
CONCRETE
CO
NC
RE
TE
FLA
GS
TO
NE
FLA
GS
TO
NE
FLAGSTONELAWN
LAWN
LAWN
LAWN
CONCRETE
ASPHALT
BRICK PAVER CURB
STAGING AREA:REFERENCE NOTES 1-6
6' CHAIN LINK FENCE W/ PRIVACY SCREENING
FLAGSTONE
A-300
2
A-3001
A-301
2
A-3011
MEMORIAL GARDEN
ASPHALT PAVING
24' - 0
"
SCHOOL PLAYGROUND
PARKING AREA
ASPHALT PAVING
EXISTING DUMSTER ENCLSURE
EXISTING STRUCTURE
NORTH ACCESS STAGING AREA FOR ACM WORK. 6' - 0" H CHAINLINK FENCE W/ PRIVACY SCREEN
UNITED WAY OF WNY
50' - 0"
22' - 0
"
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�001
SITE PLAN, GENERAL NOTES & SYMBOLSWestminster Presbyterian Church
1845
GENERAL NOTES
A. ALL WORK IS TO CONFORM WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS AND AGENCIES HAVINGJURISDICTION.
B. CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. DO NOTSCALE DRAWINGS OR DETAILS.
C. WHERE DIMENSIONAL DISCREPANCIES ARISE, REVIEW FIELD CONDITIONS WITH THE ARCHITECT BEFOREPROCEEDING WITH WORK OR ORDERING MATERIALS.
D. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS AND MATERIALS WITHINTHE PROPOSED CONSTRUCTION AREA.
E. ALL DETAILS, SECTIONS, AND MATERIALS SHOWN OR NOTED ON DRAWINGS SHALL APPLY TO ALL OTHERSIMILAR LOCATIONS UNLESS NOTED OTHERWISE.
F. ALL CORNERS AND JUNCTIONS WHERE TWO MATERIALS ADJOIN SHALL BE SEALED.
G. ALL CONTRACTORS ARE RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TOSUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGSAND FIELD CONDITIONS, CONFER WITH THE ARCHITECT FOR RESOLUTION.
H. ALL PLYWOOD AND OTHER WOOD MATERIALS USED FOR CONSTRUCTION SHALL BE FIRE RETARDANT(PTFR) TYPE WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK SHALL BEPRESSURE TREATED TYP (P.T.)
I. GC SHALL COORDINATE ALL WORK AT ROOF NOT TO VOID MFGR WARRANTIES.
J. THE CONTRACTOR SHALL INSPECT ALL ROOFING, STONE AND CLAY MASONRY ASSEMBLIES AT THE WORKAREAS, INCLUDING INTERIOR STEEPLE TOWER FOR DAMAGED, DETERIORATED & DISPLACED WOODTIMBER FRAMING, STONE OR BRICK, MORTAR & BOND FAILURE AND/OR STRUCTURAL DEFICIENCIES. ANYDISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS SHALL BE BROUGHTTO THE ATTENTION OF THE ARCHITECT OR OWNER'S REPRESENTATIVE AS SOON AS THEY ARE KNOWN.
K. WHERE REMOVAL OF EXISTING BRICK AND STONE MASONRY IS REQUIRED, THE CONTRACTOR SHALLTAKE EVERY PRECAUTION TO SAFELY EXTRACT WHOLE, INDIVIDUAL UNITS WITHOUT CAUSING FURTHERDAMAGE TO THE MATERIAL REMOVED OR TO SURROUNDING BUILDING FABRIC. EVERY ATTEMPT SHALL BEMADE TO SAVE, REPAIR AND REUSE EXISTING MATERIAL FROM BUILDING FACADE FOR REINSTALLATION.REPLACEMENT MATERIAL NEEDS THE ARCHITECT’S APPROVAL AT ALL INSTANCES AND IS A PART OF THISWORK WHEN APPROVED BY THE ARCHITECT.
L. WHERE NECESSARY AND AS APPROVED, MATCHING MATERIAL SHALL BE USED TO REPLACE SEVERELYDETERIORATED OR OTHERWISE NON REPAIRABLE BUILDING COMPONENTS. REPLACEMENT MATERIALSSHALL BE CAREFULLY SELECTED BY CONTRACTOR TO ACHIEVE STRUCTURAL, COLOR, TEXTURE ANDOTHER APPEARANCE CHARACTERISTICS AS REQUIRED TO BLEND WITH EXISTING SURROUNDING WORKAT EACH REPAIR LOCATION.
M. REPOINT MORTAR JOINTS AT BUILDING FACADE WHERE INDICATED OR AS NECESSARY TO COMPLETEWORK IN CONTRACT.
N. THE CONTRACTOR SHALL USE ONLY SPECIFIED AND APPROVED MORTAR FORMULATIONS. SEPARATEFORMULATIONS ARE REQUIRED FOR BRICK AND STONE MASONRY. UNLESS OTHERWISE INDICATED,MATCH EXISTING (ORIGINAL) BOND PATTERNS AND JOINT PROFILES.
O. PREPARE AREAS FOR REPOINTING BY REMOVING EXISTING MORTAR IN JOINTS TO A DEPTH EQUALING 21/2 X THE JOINT WIDTH OR A MINIMUM OF 3/4" FROM FACE OF STONE OR A MINIMUM OF 1" FROM FACE OFBRICK, WHICHEVER IS GREATER.
P. THE CONTRACTOR SHALL NOT MARK OR OTHERWISE DAMAGE EXISTING STONE OR CLAY MASONRY. THEUSE OF POWER TOOLS IS PROHIBITED UNLESS FIELD TESTED AND APPROVED BY ARCHITECT.
Q. THE CONTRACTOR SHALL MAINTAIN AND OR REPLACE EXISTING WEEP HOLES AT MORTAR JOINTS WITHINTHE WORK SCOPE AREA.
R. PROTECT ALL METAL FLASHING WHERE PRESENT. REPLACE CONCEALED FLASHING IN KIND IF DAMAGEDDURING REMOVALS.
S. PROTECT ALL METAL FLASHING WHERE PRESENT. REPLACE CONCEALED FLASHING IN KIND IF DAMAGEDDURING REMOVALS.
T. INCREMENTAL CLEANING OF MASONRY SHALL BE PERFORMED AS OFTEN AS NEEDED TO REMOVEMORTAR AND RELATED CONSTRUCTION RESIDUE. FINAL WASHING OF MASONRY SURFACES SHALL BEDONE AT WORK COMPLETION. ALL INCREMENTAL CLEANING SHALL BE DONE WITH STIFF BRUSH, CLEANWATER AND SPECIFIED DETERGENTS ONLY.
U. THE CONTRACTOR SHALL MEASURE AND DOCUMENT ALL DIMENSIONS AND FIELD CONDITIONS RELATIVETO THE PROJECT AND AS REQUIRED FOR ACCURATE REPLACEMENT OF BUILDING COMPONENTS ANDREINSTALLATION OF SALVAGED MATERIAL. ALL SALVAGED MATERIAL SHALL BE CATALOGED ANDREINSTALLED IN ITS ORIGINAL LOCATION UNLESS OTHERWISE APPROVED BY ARCHITECT.
1" = 30'-0"1
SITE PLANNORTH
DRAWING LIST
A-001 SITE PLAN, GENERAL NOTES & SYMBOLS
A-101 ROOF PLAN
A-300 NORTH & WEST EXTERIOR ELEVATIONS
A-301 SOUTH & EAST EXTERIOR ELEVATIONS
A-310 ROOF ELEVATIONS
A-400 BUILDING SECTION THROUGH STEEPLE & ENLARGED PLANS
A-410 ROOF DETAILS
A-411 ROOF, LOUVER & OCULUS DETAILS
A-102.1 SPIRE PLANS, SECTIONS AND DETAILS ADD ALTERNATE #1
HM-100 ROOF PLAN - HAZARDOUS MATERIALS ABATEMENT
HM-101 LANTERN & BELFRY PLANS - HAZARDOUS MATERIALS ABATEMENT
SITE STAGING NOTES
1. PROVIDE GEO-TEXTILE MAT & STONE BASE FOR ALL LAWN ACCESS PATHS & STAGING AREAS. REMOVE ALL IN ITS ENTIRETY AT PROJECT COMPLETION & RESTORE LAWN, TYP.
2. EXISTING LAWN AREA - RESTORE TO ORIGINAL ELEVATION. PROVIDE NEW TOP SOIL & GRASS SEED, TYP. THROUGHOUT DISTURBED.
3. LOCATE PORTABLE TOILET WITHIN ENCLOSURE.
4. CONTRACTOR TO PROVIDE DUMPSTER WITHIN ENCLOSURE FOR CONTRACTORS USE THROUGHOUT DURATION OF PROJECT. CONTRACTORS PROHIBITED FROM USING WPC DUMPSTERS.
5. CONTRACTORS ARE PROHIBITED FROM BLOCKING THE SITE ENTRANCE OF EXIT DRIVES WITHOUT EXPRESSED PERMISSION FROM WPC.
6. SPRINKLERS EXISTING UNDERGROUND. SHALL TEST / CONFRIM SPRINKLER SYSTEM OPERATION COMPONENTS AS NECESSARY AFTER COMPLETION OF CONTRACTOR WORK.
PROJECT SUMMARY
THE INTENT OF THIS RESTORATION PROJECT IS TO:
A. REMOVE HAZARDOUS MATERIALS AT VARIOUS LOCATIONS;B. REPAIR SLATE ROOFING AT VARIOUS LOCATIONS; C. REPLACE FLAT ROOFING ASSEMBLIES WITH NEW EPDM;D. REPLACE ALL ASSOCIATED COPPER ROOF AND MASONRY FLASHINGS IN-KIND; E. REPLACE COOPER GUTTERS IN-KIND;F. REPOINT AND REBUILD STONE AND BRICK MASONRY AT VARIOUS LOCATIONS; G. REPAIR WOOD LOUVERS; CLAD IN COPPER WHERE NOTEDH. PAINT EXTERIOR CORNICES;
A. ADD ALTERNATE #1: AT WOOD FRAMED STEEPLE SPIRE, REMOVE AND PROVIDE NEW DIAMOND SLATE ONTO NEW UNDERLAYMENT’S AND WOOD DECKING, PROVIDE NEW MODIFIED BITUMEN UNDERLAYMENT OVER ENTIRE ROOF AREA AND INSTALL NEW SLATE SHINGLES TO MATCH ORIGINAL IN SIZE, THICKNESS, EXPOSURE AND PATTERN. CAREFULLY REMOVE ALL LIGHTING PROTECTION SYSTEM AND CABLE CONDUCTORS, SMOKE DETECTIONAND ALARM SYSTEM AND EXISTING FIRE SUPPRESSION GLASS & LIQUID-FILLED GLOBES TO CONDUCT ROOF REPLACEMENT. RE-INSTALL ALL SYSTEMS IN THEIR ORIGINAL LOCATION AFTER COMPLETION. B. ADD ALTERNATE #2: PROVIDE NEW MECHANICAL VENTILATION SYSTEM WITHIN THE SPIRE.
REMOVE EXISTING AND PROVIDE NEW STEP, PARAPET AND CRICKET FLASHING AT JUNCTURE OF SLATE ROOF WALLS & PARAPETS. WEDGE AND FULLY MORTAR FLASHING INTO THE MASONRY CONSTRUCTION. THE COVERAGE OF THE FLASHING IS TO MATCH THE EXISTING INSTALLATION.
REMOVE EXIST. GUTTER AND HANGERS AND FLASHING WHERE SHOWN ON DETAILS. PROVIDE NEW 16OZ. COPPER GUTTER AND OUTSIDE HANGERS ANDFLASHING AS DETAILED. GRADE NEW GUTTER TO EXISTING DOWNSPOUTS AS REQUIRED (1/8"/FT. MIN.) CONNECT TO EXIST. DOWNSPOUTS AND PROVIDE NEW WIRE BASKETS AT EACH LOCATION.
CAREFULLY REMOVE EXISTING FIRE SUPPRESSION GLASS & LIQUID-FILLED GLOBES IN MASONRY STEEPLE & WOOD-FRAMED SPIRE PRIOR TO RESTORATIVE WORK. ALL BULBS SHOULD BE CONSIDERED AS FRAGILE & DANGEROUS. AS SUCH, HANDLE W/ EXTREME CAUTION & CARE. REINSTALL ONLY AFTER COMPLETION OF ALL CONSTRUCTION ACTIVITY.
GENERAL SLATE AND COPPER ROOFING, STONE
AND BRICK MASONRY RESTORATION NOTES:
1)THE CONTRACTOR SHALL INSPECT ALL ROOFING, STONE AND CLAY MASONRY ASSEMBLIES AT THE WORK AREAS, INCLUDING INTERIOR STEEPLE TOWER FOR DAMAGED, DETERIORATED & DISPLACED WOOD TIMBER FRAMING, STONE OR BRICK, MORTAR & BOND FAILURE AND/OR STRUCTURAL DEFICIENCIES. ANY DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR OWNER'S REPRESENTATIVE AS SOON AS THEY ARE KNOWN.
2)WHERE REMOVAL OF EXISTING BRICK AND STONE MASONRY IS REQUIRED, THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO SAFELY EXTRACT WHOLE, INDIVIDUAL UNITS WITHOUT CAUSING FURTHER DAMAGE TO THE MATERIAL REMOVED OR TO SURROUNDING BUILDING FABRIC. EVERY ATTEMPT SHALL BE MADE TO SAVE, REPAIR AND REUSE EXISTING MATERIAL FROM BUILDING FACADE FOR REINSTALLATION. REPLACEMENT MATERIAL NEEDS THE ARCHITECT’S APPROVAL AT ALL INSTANCES AND IS A PART OF THIS WORK WHEN APPROVED BY THE ARCHITECT.
3)WHERE NECESSARY AND AS APPROVED, MATCHING MATERIAL SHALL BE USED TO REPLACE SEVERELY DETERIORATED OR OTHERWISE NON REPAIRABLEBUILDING COMPONENTS. REPLACEMENT MATERIALS SHALL BE CAREFULLY SELECTED BY CONTRACTOR TO ACHIEVE STRUCTURAL, COLOR, TEXTURE AND OTHER APPEARANCE CHARACTERISTICS AS REQUIRED TO BLEND WITH EXISTING SURROUNDING WORK AT EACH REPAIR LOCATION.
4)REPOINT MORTAR JOINTS AT BUILDING FACADE WHERE INDICATED OR AS NECESSARY TO COMPLETE WORK IN CONTRACT.
5)THE CONTRACTOR SHALL USE ONLY SPECIFIED AND APPROVED MORTAR FORMULATIONS. SEPARATE FORMULATIONS ARE REQUIRED FOR BRICK AND STONE MASONRY. UNLESS OTHERWISE INDICATED, MATCH EXISTING (ORIGINAL) BOND PATTERNS AND JOINT PROFILES.
6)PREPARE AREAS FOR REPOINTING BY REMOVING EXISTING MORTAR IN JOINTS TO A DEPTH EQUALING 2 1/2 X THE JOINT WIDTH OR A MINIMUM OF 3/4" FROM FACE OF STONE OR A MINIMUM OF 1" FROM FACE OF BRICK, WHICHEVER IS GREATER.
7)THE CONTRACTOR SHALL NOT MARK OR OTHERWISE DAMAGE EXISTING STONE OR CLAY MASONRY. THE USE OF POWER TOOLS IS PROHIBITED UNLESSFIELD TESTED AND APPROVED BY ARCHITECT.
8)THE CONTRACTOR SHALL MAINTAIN AND OR REPLACE EXISTING WEEP HOLES AT MORTAR JOINTS WITHIN THE WORK SCOPE AREA.
9)PROTECT ALL METAL FLASHING WHERE PRESENT. REPLACE CONCEALED FLASHING IN KIND IF DAMAGED DURING REMOVALS.
10) PROTECT AND KEEP CLEAN, ALL BUILDING ELEMENTS ADJACENT TO AND BELOW WORK AREA.
11) INCREMENTAL CLEANING OF MASONRY SHALL BE PERFORMED AS OFTEN AS NEEDED TO REMOVE MORTAR AND RELATED CONSTRUCTION RESIDUE. FINAL WASHING OF MASONRY SURFACES SHALL BE DONE AT WORK COMPLETION. ALL INCREMENTAL CLEANING SHALL BE DONE WITH STIFF BRUSH, CLEAN WATER AND SPECIFIED DETERGENTS ONLY.
12) THE CONTRACTOR SHALL MEASURE AND DOCUMENT ALL DIMENSIONS AND FIELD CONDITIONS RELATIVE TO THE PROJECT AND AS REQUIRED FOR ACCURATE REPLACEMENT OF BUILDING COMPONENTS AND REINSTALLATION OF SALVAGED MATERIAL. ALL SALVAGED MATERIAL SHALL BE CATALOGED AND REINSTALLED IN ITS ORIGINAL LOCATION UNLESS OTHERWISE APPROVED BY ARCHITECT.
NOTICE OF PROJECT SIGNIFICANCE
HISTORIC SIGNIFICANCE ACKNOWLEDGEMENT: “THIS PROPERTY HAS BEEN DETERMINED TO POSSESS HISTORIC AND (E.G., ARCHITECTURAL, ENGINEERING, ARTISTIC) SIGNIFICANCE. THE CONTRACTOR SHALL RECOGNIZE THAT ALL ASPECTS OF THE PROPERTY MAY POTENTIALLY CONTRIBUTE TO THIS SIGNIFICANCE AND THE CONTRACTOR SHALL NOT JUDGE THE RELATIVE SIGNIFICANCE OF ANY FEATURES NOR THE IMPACT OF ANY OR ALL PROPOSED WORK. THIS RESPONSIBILITY SHALL REST SOLELY WITH THE ARCHITECT. CONSEQUENTLY NO DEVIATIONS FROM THE CONTRACT DOCUMENTS SHALL BE PERFORMED AND NO FEATURES OR MATERIALS SHALL BE ALTERED, REMOVED, REUSED, OR TAKEN FROM THE PREMISES, WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT AS BEING CONSISTENT WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. ALL WORK SHALL BE CONSISTENT WITH THE SECRETARY OF THE INTERIOR’S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES.”
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
1
A-400
1
A-400
A-301
2
A-3001
A-300
2
A-3011
3
A-410
7
A-410
12" / 12" 12" / 12"
24' - 0" 21' - 6" 10' - 4" 47' - 2" 19' - 10" 120' - 11"
21
' -
6"
32
' -
2"
21
' -
8"
4' -
6"
72
' - 1
1"
6"
/ 12
"6
" /
12
"
5" / 12" 5" / 12"
21' - 6" 47' - 6" 18' - 4" 8' - 2"8
' -
0"
28
' -
0"
24
' -
3"
16
' -
6"
CLOISTER AT GRADE
12
" / 12
"1
2"
/ 12
"
12" / 12"12" / 12"
12
" / 12
"
EDPMNIC
EDPMNIC
ANTENNA
2
A-411
1
A-410
2
A-411
4
A-410
4
A-411
4
A-411
7
A-410
222' - 3"
243' - 9"
15
2' -
9"
VTR
VTR
BUILDING LINE
7' -
1 1
/2"
6' - 7"
A-3101
2
3
4
EXISTING SNOW FENCE
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP. PROVIDE NEW STONE FINIAL WHERE MISSING TO MATCH ORIGINAL
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
REBUILD MASONRY & STONE SPIRE FROM 2' BELOW ROOF EAVE TO TOP, REPLACE COPPER ROOF FLASHING
EXISTING SNOW FENCESNOW FENCE
COPPER RIDGE CAP +/-156' - 5"
COPPER RIDGE CAP +/-
SLATE ROOF 1: SPIRE
SLA
TE
RO
OF
3:
PR
OV
IDE
30 S
LA
TE
R
EP
LA
CE
ME
NT
S
SLATE ROOF 4:PROVIDE 50 SLATE REPLACEMENTS
COPPER RIDGE CAP +/-
147' - 1"
139' - 8"
6"
/ 12
"
6"
/ 12
"
9"
/ 12
"9
" /
12
"
CO
PP
ER
RID
GE
CA
P +
/-46' -
6"
139' - 8"
A-3105
6
7
8
SLATE ROOF 7: REMOVE AND REINSTALL ALL SLATE ADJACENT TO EPDM ROOF 15
ROOF 8: EPDM
ROOF 9: EPDM
ROOF 10:EPDM ROOF 11: EPDM
ROOF 12: EPDM
ROOF 13: EPDM
ROOF 14: EPDM
ROOF 15: EPDM
ROOF 16: COPPER STANDING SEAM. REMOVE EXISTING; PROVIDE NEW 16 OZ COPPER; MATCH ORIGINAL DETAILS, PAINT WOOD CORNICE
A-310
12
9
10
11
8
A-410
12" / 12"12" / 12"
+/-
+/-
+/-123' - 0"+/-
132' - 6"+/-
125' - 7"+/-
137' - 4"+/-
134' - 3"+/-
134' - 3"+/-
108' - 1"+/-
103' - 5"+/-
EXISTING EPDM NIC
R.D.
RD RD
RD
SC
RD
DS DSDS
DS DSDSDS
DS
DS
DS
DS
DS
DS
DS
2
SLATE ROOF 2:PROVIDE 100 SLATE REPLACEMENTS
4
SLA
TE
RO
OF
6:
PR
OV
IDE
20 S
LA
TE
RE
PLA
CE
ME
NT
S4
2
A-410
3 PROVIDE NEW 16 OZ COPPER RIDGE CAP
PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
2PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
COPPER GUTTER
2PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
66
SC
6
6
3 PROVIDE NEW 16 OZ COPPER RIDGE CAP
3 PROVIDE NEW 16 OZ COPPER RIDGE CAP
4
4
2PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
DS
EXISTING GRANULAR SURFACE MODIFIED BITUMEN ROOFING MEMBRANE TO REMAIN
5 COPPER GUTTER
5COPPER GUTTER
5COPPER GUTTER
14 COPPER GUTTER
ROOF 4: PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
ROOF 3: PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
ROOF 1: PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
ROOF 3: PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
2' -
0"
2' - 0"2' - 0" 2' - 0"
2' -
0"
2' - 0" 2' - 0"
2' -
0"
2' - 0"
2' -
0"
DS
DS
DS
DS
BUILDING LINE
ROOF EDGE
COPPER GUTTER
BUILDING LINE
14 COPPER GUTTER
2' - 0" 2' - 0"
156' - 1"+/-
ROOF EDGE
BUILDING LINE
SLATE ROOF 5: PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
14COPPER GUTTER
9 REMOVE & REINSTAL SLATE8SC8
SC8
8
13REMOVE & REINSTALL CLAY CAMELBACK COPING
A-31014
13
10
A-410
7
9 REMOVE & REINSTAL SLATE
REMOVE AND REINSTALL SLATE FOR AT LEAST 2 COURSES ON THE OPPOSING SLOPE
9
REMOVE AND REINSTALL SLATE FOR AT LEAST 2 COURSES ON THE OPPOSING SLOPE
9
33' - 9"
3
A-410
A-301
3
ROOF 3: PROVIDE NEW 16 OZ COPPER VALLEY FLASHING
10
12 REBUILD MASONRY PARAPET
ROOF EDGE
BUILDING LINE
13REMOVE & REINSTALL CLAY CAMELBACK COPING
ROOF 5: REMOVE AND SALVAGE EXISTING SLATE. REMOVE UNDERLAYMENTS COMPLETELY TO EXPOSE DECK. PROVIDE NEW MODIFIED BITUMEN UNDERLAYMENT AND SLIP SHEETING, THEN REINSTALL SLATE SHINGLES, PROVIDE NEW SLATE TO MATCH ORIGINAL WHERE MISSING, BROKEN OR CRACKED.
ROOF 13: REMOVE EXISTING +/- 1" MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 12: REMOVE EXISTING +/- 1" MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 11: REMOVE EXISTING +/- 2" BALLASTED/MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 9: REMOVE EXISTING +/- 2" BALLASTED/MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 17: EPDM
130' - 0"+/-
ROOF 17: REMOVE EXISTING +/- 3" MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 8: REMOVE EXISTING +/- 1" MODIFIED BITUMEN/VB OVER SLOPING WOOD DECK (WATER BELOW ROOF MEMBRANE). EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 15: REMOVE EXISTING +/- 4" EPDM/TAPERED INSULATION OVER FLAT DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
ROOF 14: REMOVE EXISTING +/- 1" MODIFIED BITUMEN OVER SLOPING WOOD DECK. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
4
A-410
REMOVE & REINSTALL STONE COPING13
REMOVE EXISTING & PROVIDE NEW 16 OZ COPPER FLASHING AROUND CHIMNEY, SIMILAR TO 4/A-420
16
16
16
16
16
3' -
3"
116' - 0"
116' - 6"
116' - 3"
ROOF 10: REMOVE EXISTING +/- 2" BALLASTED/MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK. EXISTING DECK TO REMAIN. REMOVE ALL ASSOCIATED WALL FLASHINGS AND TERMINATIONS. PROVIDE ADHERED EPDM OVER MECHANICALLY FASTENED TAPERED INSULATION ROOFING SYSTEM.
2
A-410
16 STONE COPING
EXISTING CHIMNEY
EXISTING LEAD SHEET CAPPED CHIMNEY
REPLACE ALL COPPER FLASHING ON ROOF 14
PAINT WOOD CORNICE
21' - 0"
NIC
PAINT ALL WOOD SOFFITS
PROVIDE NEW WOOD & METAL TRIM WHERE MISSING TO MATCH ORIGINAL
REMOVE EXISTING & PROVIDE NEW 16 OZ COPPER "YANKEE" GUTTER & DS. MATCH ORIGINAL PROFILE
DS DS
1COPPER FLASHING ROOF 12
ROOF EDGE
ROOF EDGE
8
RUBBER ROOF PAVERS OVER 1/2 ROOF AREA
RUBBER ROOF PAVERS OVER 1/2 ROOF AREA
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�101
ROOF PLANWestminster Presbyterian Church
1845
1/8" = 1'-0"1
ROOF PLANNORTH
KEYED PLAN NOTES
# Description
1 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLASHING ANDSTEPPED COUNTERFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT ANDSEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTER STEP FLASHING.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE COUNTERFLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENTAND SLIP SHEETING.
2 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLAT SEAM ROOFING,FLASHING AND STEPPED COUNTERFLASHING OVER MODIFIED BITUMENUNDERLAYMENT AND SEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTERSTEP FLASHING. REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR AMINIMUM OF 2'-0" BEYOND THE FLAT LOCK AND OVER MODIFIED BITUMENUNDERLAYMENT AND SLIP SHEETING.
3 REMOVE EXISTING COMPLETELY AND PROVIDE NEW 16 OZ COPPER RIDGE CAP.MATCH ORIGINAL PROFILE.
4 PROVIDE THE NUMBER OF SLATE REPLACEMENTS INDICATED IN AS MANYLOCATIONS. SLATE REPLACEMENT INCLUDES LOCATIONS WHERE SLATE ISBROKEN, MISSING OR DAMAGED. PROVIDE NEW SLATE TO MATCH ORIGINAL INCOLOR, SIZE, THICKNESS, EXPOSURE AND COURSING. ARCHITECT WILL WORKWITH THE CONTRACTOR DURING THE CONSTRUCTION PERIOD TO IDENTIFY THEEXACT LOCATIONS FOR SLATE REPLACEMENT.
5 EXISTING COPPER GUTTERS ARE TO REMAIN. REPLACE ALL THROUGH BOLTS ATCOPPER TOP HANGERS AND UNDER BRACKETS WITH NEW STAINLESS STEEL 3/16”DIA ROUND HEAD BOLTS AND NUTS. VIF EXACT SIZE IN FIELD.
6 RD = ROOF DRAIN. REMOVE EXISTING AND PROVIDE NEW MARATHON ROOFING“PROLINER” RETROFIT DRAIN AND STRAINER FOR EPDM. VERIFY OUTLET SIZE INFIELD.
7 RD (E): EXISTING ROOF DRAIN. REMOVE AND REINSTALL.
8 SC = SCUPPER. REMOVE EXISTING LEAD COATED COPPER SCUPPER AND PROVIDENEW 16 OZ SHEET COPPER CONSTRUCTED SCUPPER.
9 FOR A MINIMUM OF TWO COURSES, REMOVE AND REINSTALL EXISTING SLATE TOENABLE ROOFING REPLACEMENT WORK. REINSTALL SLATE OVER MODIFIEDBITUMEN UNDERLAYMENT AND SLIP SHEETING. TIE-IN NEW ROOFING TOUNDERLAYMENT IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS.
10 REMOVE EXISTING COPPER VALLEY FLASHING AND PROVIDE NEW COPPER VALLEYFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT AND SEPARATION SHEET.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE FLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENT AND SLIPSHEETING.
11 PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY.
12 REBUILD EMBATTLED STONE CAPPED AND BRICK MASONRY CONSTRUCTEDPARAPET. SALVAGE ALL FACE BRICK AND RE-INSTALL. PROVIDE NEW COMMONBRICK BACKUP WHERE REQUIRED.
13 REMOVE AND REINSTALL CLAY CAMELBACK COPING ONTO THROUGHWALLFLASHING- SEE DETAILS.
14 REPLACE EXISTING COPPER GUTTER AND STRAPS, PROVIDE NEW TO MATCHORIGINAL IN EVERYWAY INCLUDING BUT NOT LIMITED TO SIZE, SHAPE ANDMATERIAL THICKNESSES.
15 EXISTING WOOD LOUVER: REPLACE WOODEN SLATS WITH NEW PRESSURETREATED WOOD SLATS AND PAINT ENTIRE LOUVER. PROVIDE NEW INSECTSCREEN ON THE INTERIOR SIDE. REPLACE ALL PERIMETER SEALANT.
16 REMOVE AND REINSTALL STONE COPING ONTO THROUGHWALL FLASHING- SEEDETAILS.
#
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
6
A-102.1
ROMAN DIAMOND SLATE PATTERN:REMOVE EXISTING SLATE & PROVIDE NEW OVER MODIFIED BITUMEN UNDERLAYMENT & SHEETING. PROVIDE NEW SLATE TO MATCH ORIGINAL, VIF.
EXISTING ASPHALTIC TAR FLASHING, TYP.
EXISTING LEAD COATED SHEET STONE CAP, TYP.
REMOVE EXISTING & PROVIDE NEW 16 OZ COPPER RIDGE CAP. MATCH EXISTING PROFILE, INSTALL WITH XXX CONTINUOUS LOCK STRAPPING, REFER TO DETAIL 1/A411, TYP.
REMOVE, REPAIR & REINSTALL COPPER FINIAL
278' - 3"
TOP OF SPIRE
REMOVE & REINSTALL LIGHTNING PROTECTION
195' - 9"194' - 0"
BOTTOM OF SPIRE
EXISTING 9X12 TIMBER POST
EXISTING 7-1/2 X 8 SLOPED TIMBER RIDGE TO REMAIN
REMOVE EXISTING AND PROVIDE NEW 2X CONTINUOUS WOOD FRAMING RIDGE NAILER ATTACHED TO SLOPED TIMVER RIDGE, TYP.
EXISTING 4 X 3-1/2 TIMBER X-BRACING, TYP.
REMOVE EXISTING & PROVIDE NEW 2X4 WOOD FRAMING AT 2'-0" O.C. MAX, TYP.
REMOVE EXISTING 5/4 T&G PLANK SHEATHING & PROVIDE NEW (2) LAYERS 5/8" T&G PLYWOOD SHEATHING, TYP.
EQ. EQ. EQ.2'-0" MAX TYP.
NEW WOOD FRAMED SILL & GUTTER BOX A-102.1
6
2X12 SILL
2X12 RIM
COPPER STRAINER
5/8" PLYWOOD
(2) LAYERS 5/8" PT PLYWOOD
2X4 @ 2'-0" O.C.
2X4 SILL
2X8 RIM
2X8 JOIST @ 2'-0" O.C.
PROVIDE NEW 16 OZ COPPER DOWNSPOUT & CONNECT TO EXISTING
1/2" DIAMETER ANCHOR BOLT @ 2'-0" O.C.
LA
P
6"
6"
NEW SLATE INSTALLED OVER MODIFIED BITUMEN UNDER LAYMENT & SLIP SHEETING
16 OZ COPPER GUTTER FULLY LOCK & SOLDER ALL SEAMS. PROVIDE CONCEALED EXPANSION JOINTS WHERE REQUIRED INSTALL OVER MODIFIED BITUMEN UNDERLAYMENT & SLIP SHEETING
REMOVE EXISTING WOOD FRAMING
REMOVE & REPLACE EXISTING WOOD DECKING W/ STRUCTURAL, EXTERIOR GRADE PLYWOOD
EXISTING SLATE SHINGLES
EXISTING POST & PURLIN JOINT
REMOVE EXISTING FRAMING SUPPORT SHIM
REMOVE EXISTING GUTTER
REMOVE EXISTING FLASHING
10"
5"
2"
REMOVE EXISTING OUTRIGGER
EXISTING BRICK MASONRY
COMPLETELY REMOVE EXISTING WOOD & COPPER CLAD GUTTER & PROVIDE NEW
REMOVE EXISTING ASPHALTIC TAR FLASHING
REMOVE EXISTING LEAD COATED SHEET COVERED
STONE CAP, TYP.
2x12 RIM JOIST
2x8 JOIST @ 2'-0"
2x8 RIM JOIST
(2) LAYERS 5/8" T&G PLYWOOD DECKING
2X4 @ 2'-0" O.C.
2X4 SILL
EXISTING 7 1/2" X 8" SLOPED TIMBER RIDGE
NEW CONTINUOUS 2X RIDGE NAILER MATCH ORIGINAL HEIGHT ± 5 1/2" VIF TYP.
EXISTING TIMBER JOIST (TYP)
REMOVE EXISTING & PROVIDE NEW 4" DIAMETER COPPER 16 OZ RIDGE CAP. MATCH EXISTING PROFILE. INSTALL WITH CONCEALED CONTINUOS LOCK STRIPS, REFER TO DETAIL 1/A-411
3 1/2"
1 1/2"
VIF & MATCH EXISTING
1' - 8" ±
MA
X
2' -
0"
6
A-102.1
NEW CONTINUOUS 2X NAILER RIPPED TO MATCH OCTAGONAL SPIRE FOR POSITIVE FASTENING OF DECKING , TYP.
INSIDE MASONRY WALL
2X12
1/2" DIAMETER ANCHOR BOLT @ 2'-6" O.C., TYP.
2X BLOCKING TO EXISTING TIMBER JOISTS
2X12 RIM JOIST
REMOVE EXISTING & PROVIDE NEW WOOD FRAMED GUTTER BOX & DECK FRAMING
2X8 JOISTS
2X8 RIM
EXISTING TIMBER JOISTS
EXISTING 7 1/2" X 8" SLOPED TIMBER RIDGE
2X4 @ 2'-0" O.C. WALL W/ (2) LAYERS 5/8" T&G PLYWOOD SHEATHING
A-102.1
5
6
A-102.1
6"
7"
1' -
2"
10"
10"
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�102.1
SPIRE PLANS, SECTIONS AND DETAILS
ADD ALTERNATE #1Westminster Presbyterian Church
1845
1/4" = 1'-0"8
SPIRE ELEVATION1/4" = 1'-0"
9TYPICAL OCTAGONAL FRAMING ELEVATION
1 1/2" = 1'-0"6
SECTION AT TOP OF STEEPLE - NEW
1 1/2" = 1'-0"3
SECTION AT TOP OF STEEPLE - EXISTING
2STEEPLE PERSPECTIVE
1STEEPLE PERSPECTIVE - EXPOSED STRUCTURE
(8) 7-1/2" X 8" DEEP - TIMBER RIDGE - SLOPED
12" X 12" TIMBER CENTER MAST POLE
(8) 9" X 12" TIMBER POSTS - VERTICAL
1 1/2" = 1'-0"5
DETAIL FRAMING PLAN
TOP OF SPIRE
EL. 278' - 0"
BOTTOM OF SPIRE
EL. 194' - 0"
BELFRY
EL. 168' - 1"
LANTERN
EL. 150' - 1"
TOP OF SPIRE
EL. 278' - 0"
BOTTOM OF SPIRE
EL. 194' - 0"
BELFRY
EL. 168' - 1"
LANTERN
EL. 150' - 1"
1/4" = 1'-0"4
FRAMIING PLAN AT ELEVATION 194'-8"
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
1" = 1'-0"7
ROMAN DIAMOND PATTERN
GRADE96' - 6"
7
A-410
WOOD LOUVER
A-411
4
A-411
4
A-411
4
ROOF DECK116' - 3"
EPDM ROOF 8
METAL HOOD
ANTENNA
REPOINT +/- 25 SF EXISTING BRICK MASONRY
LEAD SHEET CAPPED CHIMNEY
SLATE ROOF 5
WOOD LOUVER
SLATE ROOF 6:PROVIDE 2O SLATE REPLACEMENTS
4
11
SLATE ROOF 21
SLATE ROOF 31
SLATE ROOF 41
11 PAINT
13CLAY CAMELBACK COPING
11
DS DS
14 COPPER GUTTER
COPPER GUTTER
COPPER FLASHING
1
11
PAINT
PAINT
11 PAINT
PAINT
REPOINT FACE BRICK FOR ENTIRE LENGTH OF PARAPET FROM COPING TO 2'-0" BELOW DECK
REPOINT FACE BRICK FOR ENTIRE LENGTH OF PARAPET FROM COPING TO 2'-0" BELOW DECK
5
L6L7L8
W4
11 PAINT
11 PAINTPROTECT ALL WINDOWS
15
EPDM ROOF 12
COPPER GUTTER14
COPPER FLASHING ROOF 1214
15 3COPPER RIDGE CAP
3COPPER RIDGE CAP
3COPPER RIDGE CAPCOPPER
FLASHING1
COPPER FLASHING
1
A-411
11
A-411
8
REMOVE EXISTING & PROVIDE NEW SCUPPER & DS
PROTECT ALL WINDOWS
COPPER FLASHING EPDM ROOF 10
1
132' - 6"
103' - 5"
PROTECT ALL WINDOWS
DS
EPDM ROOF 11
SEXTON HOUSE, NIC
PROTECT ENTRY AT ALL TIMES FOR FREE INGRESS & EGRESS
4
A-102.1
A-300
3
A-300
3L9 L10
GRADE96' - 6"
SANCTUARY EAVE138' - 6"
SPIRE194' - 8"
3
A-410
18
1' -
6"
60
' -
1"
38
' -
1"
83
' -
4"
TOP OF SPIRE278' - 0"
LEVEL 01100' - 0"
LANTERN150' - 1"
BELFRY168' - 1"
ROOF DECK116' - 3"
4
A-411
7
A-410
2
A-400
2
A-400
3
A-400
3
A-400
2
A-410
COPPER FLASHING1
2 PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
COPPER GUTTER
DS
DS
DS
DS
COPPER FLASHING
1
5 COPPER GUTTER
REBUILD MASONRY & STONE SPIRE FROM 2' BELOW ROOF EAVE TO TOP, REPLACE COPPER ROOF FLASHING
PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
SLATE ROOF 5: COPPER FLASHING1
SLATE ROOF 2:4
SLA
TE
RO
OF
34
SLATE ROOF 44
SLATE ROOF 5:
SC8
12EMBATTLED PARAPET
13 CAMELBACK COPING
11 PAINT
11 PAINT
14 COPPER GUTTER
EXISTING SNOW FENCE
11
A-410
9
A-410
EPDM ROOF 12:REMOVE EXISTING & PROVIDE NEW 16 OZ COPPER FLASHIN; REMOVE SLATE SHINGLE FOR WATER TIGHT CONSTRUCTION
4
A-411
2
A-411
8
A-411
11
L1L2 L8
W1
PROVIDE NEW STONE FINIAL WHERE MISSING TO MATCH ORIGINAL
3 COPPER RIDGE CAP
3 COPPER RIDGE CAP
3 COPPER RIDGE CAP
11 PAINT
11 PAINT11 PAINT
11 PAINT
PROTECT ALL EXISTING STAINED GLASS WINDOWS
DS
DS
DS
3
A-411
ENLARGED LOUVER ELEVATION
ENLARGED OCULUS ELEVATION
ENLARGED LANTERN PLAN
ENLARGED BELFRY PLAN
AD
D A
LT
NE
RN
AT
E #
1
EPDM ROOF 8
1
EPDM ROOF 10
PROTECT
PROTECT
EXISTING SNOW FENCE
EPDM ROOF 9 EPDM ROOF 11
PROTECT ALL EXISTING STAINED GLASS WINDOWS
PROTECT ENTRY AT ALL TIMES FOR FREE INGRESS & EGRESS
SEXTON HOUSE, NIC
11 COPPER GUTTER
2' -
0"
2' -
0"
ADD ALTERNATE #1
4
A-102.1
3' - 0"
5 1
/2"
4' -
0"
6"
4"
4 /A-300
PAINT & REGLAZE WINDOW SASH. REPLACE TWO MISSING 1/8" THICK GLASS LITES
PROVIDE INSECT SCREEN
1/8" = 1'-0"1
WEST ELEVATION
1/8" = 1'-0"2
NORTH ELEVATION
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�300
NORTH & WEST EXTERIOR ELEVATIONSWestminster Presbyterian Church
1845
KEYED PLAN NOTES
# Description
1 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLASHING ANDSTEPPED COUNTERFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT ANDSEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTER STEP FLASHING.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE COUNTERFLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENTAND SLIP SHEETING.
2 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLAT SEAM ROOFING,FLASHING AND STEPPED COUNTERFLASHING OVER MODIFIED BITUMENUNDERLAYMENT AND SEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTERSTEP FLASHING. REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR AMINIMUM OF 2'-0" BEYOND THE FLAT LOCK AND OVER MODIFIED BITUMENUNDERLAYMENT AND SLIP SHEETING.
3 REMOVE EXISTING COMPLETELY AND PROVIDE NEW 16 OZ COPPER RIDGE CAP.MATCH ORIGINAL PROFILE.
4 PROVIDE THE NUMBER OF SLATE REPLACEMENTS INDICATED IN AS MANYLOCATIONS. SLATE REPLACEMENT INCLUDES LOCATIONS WHERE SLATE ISBROKEN, MISSING OR DAMAGED. PROVIDE NEW SLATE TO MATCH ORIGINAL INCOLOR, SIZE, THICKNESS, EXPOSURE AND COURSING. ARCHITECT WILL WORKWITH THE CONTRACTOR DURING THE CONSTRUCTION PERIOD TO IDENTIFY THEEXACT LOCATIONS FOR SLATE REPLACEMENT.
5 EXISTING COPPER GUTTERS ARE TO REMAIN. REPLACE ALL THROUGH BOLTS ATCOPPER TOP HANGERS AND UNDER BRACKETS WITH NEW STAINLESS STEEL 3/16”DIA ROUND HEAD BOLTS AND NUTS. VIF EXACT SIZE IN FIELD.
6 RD = ROOF DRAIN. REMOVE EXISTING AND PROVIDE NEW MARATHON ROOFING“PROLINER” RETROFIT DRAIN AND STRAINER FOR EPDM. VERIFY OUTLET SIZE INFIELD.
7 RD (E): EXISTING ROOF DRAIN. REMOVE AND REINSTALL.
8 SC = SCUPPER. REMOVE EXISTING LEAD COATED COPPER SCUPPER AND PROVIDENEW 16 OZ SHEET COPPER CONSTRUCTED SCUPPER.
9 FOR A MINIMUM OF TWO COURSES, REMOVE AND REINSTALL EXISTING SLATE TOENABLE ROOFING REPLACEMENT WORK. REINSTALL SLATE OVER MODIFIEDBITUMEN UNDERLAYMENT AND SLIP SHEETING. TIE-IN NEW ROOFING TOUNDERLAYMENT IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS.
10 REMOVE EXISTING COPPER VALLEY FLASHING AND PROVIDE NEW COPPER VALLEYFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT AND SEPARATION SHEET.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE FLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENT AND SLIPSHEETING.
11 PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY.
12 REBUILD EMBATTLED STONE CAPPED AND BRICK MASONRY CONSTRUCTEDPARAPET. SALVAGE ALL FACE BRICK AND RE-INSTALL. PROVIDE NEW COMMONBRICK BACKUP WHERE REQUIRED.
13 REMOVE AND REINSTALL CLAY CAMELBACK COPING ONTO THROUGHWALLFLASHING- SEE DETAILS.
14 REPLACE EXISTING COPPER GUTTER AND STRAPS, PROVIDE NEW TO MATCHORIGINAL IN EVERYWAY INCLUDING BUT NOT LIMITED TO SIZE, SHAPE ANDMATERIAL THICKNESSES.
15 EXISTING WOOD LOUVER: REPLACE WOODEN SLATS WITH NEW PRESSURETREATED WOOD SLATS AND PAINT ENTIRE LOUVER. PROVIDE NEW INSECTSCREEN ON THE INTERIOR SIDE. REPLACE ALL PERIMETER SEALANT.
16 REMOVE AND REINSTALL STONE COPING ONTO THROUGHWALL FLASHING- SEEDETAILS.
#
1" = 1'-0"3
WEST LOUVER ELEVATION1" = 1'-0"
4WEST LOUVER SECTION DETAIL
REPLACE (4) WOOD SLATS WHERE DAMAGED; RESEAL FRAME PERIMETER; PAINT ALL SIDES OF LOUVER
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
RESEAL ENTIRE PERIMETER
GRADE96' - 6"
SPIRE194' - 8"
SPIRE194' - 8"
2
A-411
1
A-410
4
A-410
LEVEL 01100' - 0"
LANTERN150' - 1"
BELFRY168' - 1"
REPOINT PARAPET MASONRY FROM 2' BELOW ROOF DECK+/- 147 SQ.FT
REBUILD MASONRY IN THIS AREA
ANTENNA
2
A-400
2
A-400
3
A-400
3
A-400
11 PAINT
SLATE ROOF 64
LEAD SHEET CAPPED CHIMNEY
REMOVE AND REINSTALL SLATE FOR AT LEAST 2 COURSES ON THE OPPOSING SLOPE, TYP. 3 SIDES
9
DS
DSDS
DS DS
DS
5COPPER GUTTER
SLATE ROOF 34
PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
2
2 PROVIDE NEW 16 OZ COPPER FLAT SEAM ROOFING
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
11 PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY
11 PAINT
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
11 PAINT
PROVIDE NEW 16 OZ COPPER FLASHING AND STEPPED COUNTERFLASHING.
1
L4L5L6
W3
11 PAINT
REPOINT +/- 7 SF EXISTING BRICK MASONRY
14COPPER GUTTER, TYP. 3 SIDES
REPAIR METAL & WOOD CORNICE
3COPPER RIDGE CAP
16STONE COPING
REMOVE EXISTING & PROVIDE NEW WOOD FASCIA TO MATCH ORIGINAL; PAINT
PROTECT ALL WINDOWS, TYP.
134' - 3"
8 SCUPPER
EPDM ROOF 13
SLATE ROOF 34
COPPER FLASHING
1
116' - 3"EPDM ROOF 13
108' - 1"EPDM ROOF 15
16 STONE COPING
COPPER RIDGE CAP
3
A-301
3
ADD ALTERNATE #1
COPPER RIDGE CAP
3
COPPER FLASHING
1
SLATE ROOF 24
EXISTING SNOW FENCE
130' - 0" EPDM ROOF 17
4
A-102.1
GRADE96' - 6"
1
A-400
SPIRE194' - 8"
TOP OF SPIRE278' - 0"
LEVEL 01100' - 0"
LANTERN150' - 1"
BELFRY168' - 1"
REPOINT FACE BRICK FOR ENTIRE LENGTH OF PARAPET FROM DECK LEVEL TO 2'-0" BELOW +/- 68 SQ.FT
ROOF 14 DECK133' - 10"
2
A-400
2
A-400
3
A-400
3
A-400
10
A-410
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
SLATE ROOF 7
SLATE ROOF 64
SLATE ROOF 24
REPOINT BRICK & STONE MASONRY SPIRE FROM 2' BELOW ROOF EAVE TO TOP
11 PAINT
DS
DS
DSDS
COPPER GUTTER
7' -
3"
9' - 4"
REMOVE AND REINSTALL SLATE FOR AT LEAST 2 COURSES ON THE OPPOSING SLOPE
9
L2L3L4
W2
ADD ALTERNATE #1
A-411
11
11 PAINT
PROTECT ENTRY AT ALL TIMES FOR FREE INGRESS & EGRESS
PROTECT ALL WINDOWS
PROVIDE NEW STONE FINIAL WHERE MISSING TO MATCH ORIGINAL
11 PAINT
PROTECT ENTRY AT ALL TIMES FOR FREE INGRESS & EGRESS
REPOINT 3 COURSES BELOW STONE CAP
4
A-410
4
A-102.1
DS
COPPER GUTTER
11 PAINT
2
COPPER FLASHING1
REBUILD BRICK & STONE MASONRY IN THIS AREA
1
1
EPDM ROOF 16
SLA
TE
RO
OF
2
PAINT11
COPPER GUTTER14
2' -
0"
SLA
TE
RO
OF
3
PAINT11
REPOINT FACE BRICK FOR ENTIRE SPIRE TO 2'-0" BELOW DECK LEVEL
REBUILD BRICK & STONE MASONRY IN THIS AREA
REPOINT
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�301
SOUTH & EAST EXTERIOR ELEVATIONSWestminster Presbyterian Church
1845
1/8" = 1'-0"2
SOUTH ELEVATION
1/8" = 1'-0"1
EAST ELEVATION
KEYED PLAN NOTES
# Description
1 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLASHING ANDSTEPPED COUNTERFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT ANDSEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTER STEP FLASHING.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE COUNTERFLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENTAND SLIP SHEETING.
2 REMOVE EXISTING COMPLETELY AND PROVIDE NEW COPPER FLAT SEAM ROOFING,FLASHING AND STEPPED COUNTERFLASHING OVER MODIFIED BITUMENUNDERLAYMENT AND SEPARATION SHEET. MATCH EXTENT OF ORIGINAL COUNTERSTEP FLASHING. REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR AMINIMUM OF 2'-0" BEYOND THE FLAT LOCK AND OVER MODIFIED BITUMENUNDERLAYMENT AND SLIP SHEETING.
3 REMOVE EXISTING COMPLETELY AND PROVIDE NEW 16 OZ COPPER RIDGE CAP.MATCH ORIGINAL PROFILE.
4 PROVIDE THE NUMBER OF SLATE REPLACEMENTS INDICATED IN AS MANYLOCATIONS. SLATE REPLACEMENT INCLUDES LOCATIONS WHERE SLATE ISBROKEN, MISSING OR DAMAGED. PROVIDE NEW SLATE TO MATCH ORIGINAL INCOLOR, SIZE, THICKNESS, EXPOSURE AND COURSING. ARCHITECT WILL WORKWITH THE CONTRACTOR DURING THE CONSTRUCTION PERIOD TO IDENTIFY THEEXACT LOCATIONS FOR SLATE REPLACEMENT.
5 EXISTING COPPER GUTTERS ARE TO REMAIN. REPLACE ALL THROUGH BOLTS ATCOPPER TOP HANGERS AND UNDER BRACKETS WITH NEW STAINLESS STEEL 3/16”DIA ROUND HEAD BOLTS AND NUTS. VIF EXACT SIZE IN FIELD.
6 RD = ROOF DRAIN. REMOVE EXISTING AND PROVIDE NEW MARATHON ROOFING“PROLINER” RETROFIT DRAIN AND STRAINER FOR EPDM. VERIFY OUTLET SIZE INFIELD.
7 RD (E): EXISTING ROOF DRAIN. REMOVE AND REINSTALL.
8 SC = SCUPPER. REMOVE EXISTING LEAD COATED COPPER SCUPPER AND PROVIDENEW 16 OZ SHEET COPPER CONSTRUCTED SCUPPER.
9 FOR A MINIMUM OF TWO COURSES, REMOVE AND REINSTALL EXISTING SLATE TOENABLE ROOFING REPLACEMENT WORK. REINSTALL SLATE OVER MODIFIEDBITUMEN UNDERLAYMENT AND SLIP SHEETING. TIE-IN NEW ROOFING TOUNDERLAYMENT IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS.
10 REMOVE EXISTING COPPER VALLEY FLASHING AND PROVIDE NEW COPPER VALLEYFLASHING OVER MODIFIED BITUMEN UNDERLAYMENT AND SEPARATION SHEET.REMOVE AND REINSTALL EXISTING SLATE AS REQUIRED FOR A MINIMUM OF 2'-0"BEYOND THE FLASHING AND OVER MODIFIED BITUMEN UNDERLAYMENT AND SLIPSHEETING.
11 PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY.
12 REBUILD EMBATTLED STONE CAPPED AND BRICK MASONRY CONSTRUCTEDPARAPET. SALVAGE ALL FACE BRICK AND RE-INSTALL. PROVIDE NEW COMMONBRICK BACKUP WHERE REQUIRED.
13 REMOVE AND REINSTALL CLAY CAMELBACK COPING ONTO THROUGHWALLFLASHING- SEE DETAILS.
14 REPLACE EXISTING COPPER GUTTER AND STRAPS, PROVIDE NEW TO MATCHORIGINAL IN EVERYWAY INCLUDING BUT NOT LIMITED TO SIZE, SHAPE ANDMATERIAL THICKNESSES.
15 EXISTING WOOD LOUVER: REPLACE WOODEN SLATS WITH NEW PRESSURETREATED WOOD SLATS AND PAINT ENTIRE LOUVER. PROVIDE NEW INSECTSCREEN ON THE INTERIOR SIDE. REPLACE ALL PERIMETER SEALANT.
16 REMOVE AND REINSTALL STONE COPING ONTO THROUGHWALL FLASHING- SEEDETAILS.
#
1/4" = 1'-0"3
ROOF 10 NORTH ELEVATION
PROTECT ALL EXISTING STAINED GLASS WINDOWS
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
COPPER FLASHING
FLASHING
11PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY
5 COPPER GUTTER
EXISTING WINDOW OPENING
EXISTING MASONRY WALL
8
A-410
8
A-410
11PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY
REMOVE EXISTING METAL REGLETS
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
EXISTING WINDOW OPENING, TYP.
EXISTING MASONRY WALLDS
SHEET METAL HOOD
11
A-410
PROVIDE NEW METAL REGLETS, 8" MIN. ABOVE FINISHED ROOF
11PAINT EXISTING WOOD AND/OR METAL FACIA AND CORNICE IN IT’S ENTIRETY
REMOVE EXISTING METAL REGLETS, TYP.
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
EXISTING WINDOW OPENING
EXISTING MASONRY WALL
SHEET METAL HOOD
A-410
11
PROVIDE NEW METAL REGLETS, 8" MIN. ABOVE FINISHED ROOF
REPAIR DAMAGED / MISSING CORNICE & DENTILS BEHIND DS
DS
A-410
3
8
A-410
REMOVE EXISTING METAL REGLETS, TYP.
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
EXISTING SCUPPER OPENING
EXISTING EMBATTLED MASONRY PARAPET
EXISTING STONE EMBATTLED PARAPET CAP
METAL THROUGH WALL FLASHING WITH CONTINUOUS INTERLOCK WITH METAL COUNTER FLASHING
PROVIDE NEW DRAIN INSERT
REMOVE EXISTING ASPHALTIC COATING (REPRESENTED BY DIAGONAL HATCH)
9
A-410
3
A-410
A-410
8A-410
8
7
A-410
REMOVE AND REINSTALL CLAY CAMEL BACK COPING OF PARAPET, PROVIDE THROUGH WALL FALSHING THAT IS INTERLOCKED TO ROOF METAL COUNTER FLASHING. SET CAP IN CONTINUOUS BED OF MORTAR
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
A-410
8
A-410
3
REMOVE AND REINSTALL EMBATTLED STONE CAP OF PARAPET, PROVIDE THROUGH WALL FLASHING THAT IS INTERLOCKED TO ROOF METAL COUNTER FLASHING. SET STONE IN 3/8" MORTAR JOINT. MORTAR ALL TRANSVERSE JOINTS
REBUILD BRICK MASONRY WITH EMBATTLED STONE CAP PARAPET IN ITS ENTIRETY DOWN TO THE ROOF DECK. REMOVE, SALVAGE AND REINSTALL ALL FACE BRICK. PROVIDE NEW CLAY COMMON BRICK WITHIN THE BACK UP AS NECESSARY
SCUPPER OPENING
PROVIDE NEW DRAIN INSERT
REMOVE EXISTING ASPHALTIC COATING (REPRESENTED BY DIAGONAL HATCH)
A-410
7
A-410
8
9
A-410
EXISTING SHEET METAL HOOD
REMOVE AND REINSTALL EMBATTLED STONE CAP OF PARAPET, PROVIDE THROUGH WALL FLASHING THAT IS INTERLOCKED TO ROOF METAL COUNTER FLASHING. SET STONE IN 3/8" MORTAR JOINT. MORTAR ALL TRANSVERSE JOINTS
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
EXISTING ASPHALTIC COATING (REPRESENTED BY DIAGONAL HATCH)
11 PAINT
A-410
3
8
A-410
A-410
11
8
A-410
EXISTING ASPHALTIC COATING (REPRESENTED BY DIAGONAL HATCH)
EXISTING WINDOW OPENING, TYP.
DS
5 COPPER GUTTER
11 PAINT
EXISTING SHEET METAL HOOD
11
A-410
A-410
8
A-410
7
REMOVE AND REINSTALL CLAY CAMEL BACK COPING OF PARAPET, PROVIDE THROUGH WALL FALSHING THAT IS INTERLOCKED TO ROOF METAL COUNTER FLASHING. SET CAP IN CONTINUOUS BED OF MORTAR
PROVIDE NEW DRAIN INSERT
SCUPPER OPENING
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
9
A-410
A-410
8
A-410
7SIM
REMOVE AND REINSTALL CLAY CAMEL BACK COPING OF PARAPET, PROVIDE THROUGH WALL FALSHING THAT IS INTERLOCKED TO ROOF METAL COUNTER FLASHING. SET CAP IN CONTINUOUS BED OF MORTAR
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
A-410
7
A-410
8
7
A-410
EXISTING WINDOW OPENING
EXISTING STUCCO INFILL
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
11 PAINT
A-410
7 11
A-410
8
A-410
A-410
8
EXISTING WINDOW OPENING
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
11 PAINT
A-410
7
8
A-410
A-410
8
REMOVE AND REPLACE SLATE SHINGLES
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
METAL REGLET
A-410
10
A-410
10
10
A-410
PROVIDE NEW 16 OZ COPPER FLASHING AND COUNTERFLASHING.
1
METAL REGLET
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
8
A-410
A-410
10
A-410
10
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�310
ROOF ELEVATIONSWestminster Presbyterian Church
1845
1/4" = 1'-0"1
ROOF 13 WEST ELEVATION
1/4" = 1'-0"2
ROOF 13 NORTH ELEVATION
1/4" = 1'-0"3
ROOF 13 EAST ELEVATION
1/4" = 1'-0"4
ROOF 13 SOUTH ELEVATION
1/4" = 1'-0"5
ROOF 9 WEST ELEVATION
1/4" = 1'-0"6
ROOF 9 NORTH ELEVATION
1/4" = 1'-0"7
ROOF 9 EAST ELEVATION
1/4" = 1'-0"8
ROOF 9 SOUTH ELEVATION
1/4" = 1'-0"9
ROOF 11 WEST ELEVATION
1/4" = 1'-0"10
ROOF 11 NORTH ELEVATION
1/4" = 1'-0"11
ROOF 11 EAST ELEVATION
1/4" = 1'-0"12
ROOF 11 SOUTH ELEVATION
1/4" = 1'-0"13
ROOF 15 SOUTH ELEVATION1/4" = 1'-0"
14ROOF 15 WEST ELEVATION
OPP
OPP
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
SP
IRE
194' -
8"
SP
IRE
194' -
8"
TO
P O
F S
PIR
E278' -
0"
LA
NT
ER
N150' -
1"
LA
NT
ER
N150' -
1"
BE
LF
RY
168' -
1"
BE
LF
RY
168' -
1"
SA
NT
UA
RY
AT
TIC
144' -
6"
SA
NT
UA
RY
AT
TIC
144' -
6"
26' - 7" 18' - 0" 5' - 7"
2
A-4
00
2
A-4
00
3
A-4
00
3
A-4
00
AD
D A
LT
ER
NA
TE
#1
EX
IST
ING
1/2
HE
IGH
T
MA
N A
CC
ES
S D
OO
R
EX
IST
ING
WD
LA
DD
ER
TO
LA
NT
ER
N L
EV
EL
FINISHED SPACE BELOW, PROTECT
EX
IST
ING
9X
12 T
IMB
ER
P
OS
T, T
YP
.
EX
IST
ING
4X
6 T
IMB
ER
X
-BR
AC
ING
, T
YP
.
W2
W1
W4
TY
PIC
AL F
OR
ALL W
D
OC
ULU
S P
AN
ELS
: P
RO
VID
E
NE
W F
IBE
R C
EM
EN
T P
AN
EL
W/ C
OP
PE
R C
LA
D W
D T
RIM
. R
EF
ER
EN
CE
12/A
-421
L1
L2
L3
L7
L8
PR
OT
EC
T E
XIS
TIN
G B
ELL
& A
SS
OC
IAT
ED
H
AR
DW
AR
E; T
HE
SE
WIL
L
RE
MA
IN IN
PLA
CE
DU
RIN
G
CO
NS
TR
UC
TIO
N
EX
IST
ING
CO
PP
ER
-CO
VE
RE
D
WD
PA
NE
L B
ELL H
AT
CH
& W
D
DE
CK
. A
PP
LY
NE
W F
LU
ID
AP
PLIE
D R
OO
F C
OA
TIN
G F
OR
W
AT
ER
-TIG
HT
SE
AL
PR
OV
IDE
FLU
ID-A
PP
LIE
D
CO
AT
ING
FLA
SH
ING
TO
ALL
WA
LLS
, P
OS
TS
, E
TC
. T
O
EF
FE
CT
IVE
LY
TE
RM
INA
TE
F
LU
ID A
PP
LIE
D R
OO
FIN
G
CO
AT
ING
REPOINT INTERIOR, INCLUDING ALL MASONRY OPENINGS REPOINT INTERIOR, INCLUDING ALL MASONRY OPENINGS
BR
ICK
MA
SO
NR
Y P
OR
TIO
N
OF
ST
EE
PLE
, T
YP
.
TY
PIC
AL F
OR
ALL W
OO
D
LO
UV
ER
S P
RO
VID
E N
EW
C
OP
PE
R C
LA
DD
ING
& IN
SE
CT
S
CR
EE
N. S
EE
8, 9 &
10 / A
-421
RE
MO
VE
EX
IST
ING
&
PR
OV
IDE
NE
W 1
6 O
Z
CO
PP
ER
SC
UP
PE
R
RE
MO
VE
EX
IST
ING
&
PR
OV
IDE
NE
W 1
6
OZ
CO
PP
ER
DS
RE
BU
ILD
BR
ICK
SIL
L
A-1
02.1
64
A-1
02.1
1
A-400
1
A-400
W1
W1
W3
W4
2' -
8"
EXISTING MASONRY WALL
EXISTING TIMBER STUCTURE
EXISTING OCULUS, WOOD FRAMED PANEL & TRIM. REMOVE EXISTING & PROVIDE NEW, TYP. FOR FOUR LOCATIONS: W1-W4
PROTECT EXISTING LEADED & GLASS WINDOW
PROTECT EXISTING LEADED & GLASS WINDOW
PROTECT EXISTING LEADED & GLASS WINDOW
EXISTING 1/2 MAN ACCESS DOOR
PROTECT EXISTING LEADED & GLASS WINDOW
A-421
11
FULLY REPOINT INTERIOR BRICK WALLS & MASONRY OPENINGS
FULLY REPOINT EXTERIOR MASONRY OPENINGS
EXISTING PLANK & TIMBER FRAMED FLOOR
EXISTING 9X12 TIMBER POST, TYP.
EXISTING 4X6 TIMBER X-BRACING, TYP.
EXISTING BELL ACCESS HATCH & WOOD RAILING TO REMAIN
R 9' - 4"
UP
STAIRS TO BELFRY
UTILIZE LOCATION W3 OPENING TO REMOVE EXISTING AND PROVIDE NEW WORK. VERY LIMITED ACCESS IS AVAILABLE TO THE STEEPLE AND SPIRE AREAS VIA INTERNAL CIRCULATION
1
A-400
1
A-400
L1
L2
L3
L4
L5
L6
L7
L8
EXISTING WD LOUVERS
A-421
11
EXISTING WD LOUVERS
DN
EXISTING STAIR ACCESS HATCH TO LANTERN BELOW. APPLY NEW FLUID APPLIED ROOF COATING FOR WATER-TIGHT SEAL
EXISTING COPPER-COVERED WD PANEL BELL HATCH & WD DECK. APPLY NEW FLUID APPLIED ROOF COATING FOR WATER-TIGHT SEAL
FULLY REPOINT EXTERIOR MASONRY OPENINGS
EXISTING 9X12 TIMBER POST, TYP.
EXISTING 4X6 TIMBER X-BRACING, TYP.
REBUILD MASONRY IN CROSSHATCHED AREA FROM LANTERN DECK (ELEVATION +/-150' - 1") TO SPIRE (+/- 194' - 8")
R 8' - 8"
REBUILD BRICK SILL @ L7
REMOVE EXISTING & PROVIDE NEW 16 OZ COPPER SCUPPER & DS
REMOVE & REINSTALL LEADERS AS REQUIRED
UP
STAIRS TO SPIRE
REPOINT ALL MASONRY FROM LANTERN DECK (ELEVATION +/- 150' - 1") TO SPIRE (+/- 194' - 8")
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�400
BUILDING SECTION THROUGH STEEPLE &
ENLARGED PLANSWestminster Presbyterian Church
1845
1/4
" =
1'-0"
1W
AL
L S
EC
TIO
N -
SP
IRE
1/4" = 1'-0"2
ENLARGED PLAN - LANTERNNORTH
1/4" = 1'-0"3
ENLARGED PLAN - BELFRYNORTH
GENERAL NOTES
1. REMOVE EXISTING FIRE SUPPRESSION GLASS & LIQUID-FILLED GLOBES IN MASONRY STEEPLE & WOOD-FRAMED SPIRE PRIOR TO RESTORATIVE WORK. ALL BULBS SHOULD BE CONSIDERED AS FRAGILE & DANGEROUS. AS SUCH, HANDLE W/ EXTREME CAUTION & CARE. REINSTALL ONLY AFTER COMPLETION OF ALL CONSTRUCTION ACTIVITY.
2. FULLY VACUUM & CLEAN ENTIRY LANTERN & BELFRY PLATFORMS & STAIRS. REMOVE MISCELLANEOUS DEBRIS.
ELEVATION 168' - 1"ELEVATION 150' - 1"
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
REPLACE EXISTING COPPER GUTTER AND STRAPS, PROVIDE NEW TO MATCH ORIGINAL IN EVERYWAY INCLUDING BUT NOT LIMITED TO SIZE, SHAPE AND MATERIAL THICKNESSES.
PAINT EXISTING WOOD TRIM & DENTIL MOULDINGS @ 18" O.C.; REPAIR & PAINT OR REPLACE & PAINT AS NECESSARY
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
COMPRESSIBLE NEOPRENE TAPE
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
PAINT EXISTING WOOD AND/OR METAL FASCIA AND CORNICE IN ITS ENTIRETY
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
5
A-420
EPDM COUNTER FLASHING2' - 0"
4-1/2" RIGID INSULATION
REMOVE STONE CAP, SALVAGE FOR RE-INSTALLATION
CONTINUOUS THROUGH WALL METAL FLASHING
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
REPOINT EXISTING MASONRY WALL IN ITS ENTIRETY
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
3/8" MORTAR JOINT WITH 1/8" WEEPS @ 2'-0" O.C.
5' -
4"
±
CONT. BEAD SEALANT AROUND DOWEL PENETRATIONS
PROVIDE 3/16" X 2" LONG STAINLESS STEEL DOWELS, (3) PER STONE
MIN
.
1' -
6"
INSERT REGLET INTO EXISTING MORTAR JOINT
WEDGE AND SEALANT
TERMINATION BAR
COPPER REGLET
1' - 0" ±
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
1/2" HEMMED EDGE, TYP.
4-1/2" RIGID INSULATION
RE
PO
INT
FA
CE
BR
ICK
FO
R E
NT
IRE
LE
NG
TH
O
F P
AR
AP
ET
FR
OM
DE
CK
LE
VE
L T
O 2
'-0"
BE
LO
W (
RO
OF
9 O
NLY
)
2' -
0"
5' -
0 1
/2"
1' - 0"
REMOVE AND REINSTALL CLAY CAMEL BACK COPING OF PARAPET, PROVIDE THROUGH WALL FALSHING THAT IS INTERLOCKED TO ROOF COPPER COUNTER FLASHING. SET CAP IN CONTINUOUS BED OF MORTAR
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
REPOINT EXISTING MASONRY WALL IN ITS ENTIRETY
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
VA
RIE
S
VA
RIE
S
RE
PO
INT
FA
CE
BR
ICK
FO
R E
NT
IRE
LE
NG
TH
OF
PA
RA
PE
T F
RO
M C
OP
ING
T
O
2'-0"
BE
LO
W D
EC
K
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
4-1/2" RIGID INSULATION
5 1
/4"
10
3/4
"
2" 1' - 0" ± 2 1/4"
REMOVE AND REINSTALL EMBATTLED STONE CAP OF PARAPET, PROVIDE THROUGH WALL FLASHING THAT IS INTERLOCKED TO ROOF COPPER COUNTER FLASHING. SET STONE IN 3/8" MORTAR JOINT. MORTAR ALL TRANSVERSE JOINTS
COPPER THROUGH WALL FLASHING WITH CONTINUOUS INTERLOCK WITH COPPER COUNTER FLASHING
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
EXISTING MASONRY WALL
2' -
1 1
/2"
2' -
0"
1' - 4 1/4"
REMOVE EXISTING ±2" BALLASTED/MODIFIED BITUMEN/VB OVER BUILT-UP ROOFING OVER SLOPING WOOD DECK AND ALL RELATED FLASHINGS AND SEALANTS
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
RO
OF
9 O
NLY
: R
EB
UIL
D B
RIC
K M
AS
ON
RY
W
ITH
EM
BA
TT
LE
D S
TO
NE
CA
P P
AR
AP
ET
IN
IT
S E
NT
IRE
TY
DO
WN
TO
TH
E R
OO
F D
EC
K.
RE
MO
VE
, S
ALV
AG
E A
ND
RE
INS
TA
LL A
LL
FA
CE
BR
ICK
. P
RO
VID
E N
EW
CLA
Y
CO
MM
ON
BR
ICK
WIT
HIN
TH
E B
AC
K U
P A
S
NE
CE
SS
AR
Y
RO
OF
9 O
NLY
: R
EP
OIN
T F
AC
E B
RIC
K F
OR
E
NT
IRE
LE
NG
TH
OF
PA
RA
PE
T F
RO
M D
EC
K
LE
VE
L T
O 2
'-0"
BE
LO
W
4-1/2" RIGID INSULATION
COPPER REGLET
WEDGE AND SEALANT
INSERT REGLET INTO EXISTING MORTAR JOINT
REPOINT EXISTING MASONRY WALL IN ITS ENTIRETY
COPPER TERMINATION BAR
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
3"
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
4-1/2" RIGID INSULATION
REMOVE AND REINSTALL GUTTER HANGERS
SEALANT
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
COMPRESSIBLE NEOPRENE TAPE
4-1/2" RIGID INSULATION
COUNTER FLASHING
MIN
.
1' -
0"
EDGE OF EXISTING FASCIA AND COUNTER FLASHING
EXISTING GUTTERREMOVE AND REINSTALL TOP GUTTER HANGERS, TYP.
LINE OF GUTTER HANGER BELOW COUNTER FLASHING
SEALANT AROUND PERIMETER OF GUTTER HANGER
6
A-410
1
A-410
REPLACE EXISTING COPPER GUTTER AND STRAPS, PROVIDE NEW TO MATCH ORIGINAL IN EVERYWAY INCLUDING BUT NOT LIMITED TO SIZE, SHAPE AND MATERIAL THICKNESSES.
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
COMPRESSIBLE NEOPRENE TAPE
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
PAINT EXISTING WOOD FASCIA, TRIM AND CORNICE IN ITS ENTIRETY
COMPLETELY REMOVE EXISTING ROOFING SYSTEM & FLASHING FROM ALL STONE & MASONRY SURFACES
5
A-420
EPDM COUNTER FLASHING
4-1/2" RIGID INSULATION
2' - 0"
2' -
0" ± 2' - 0"
REM
OVE
AND R
EPLA
CE S
LATE
SHIN
GLE
SREM
OVE
AND R
EPLA
CE TW
O
CO
URSES O
F SLATE S
HIN
GLES
, WRAP
EPDM
OVE
R R
IDG
E
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
WEDGE AND SEALANT
EXISTING WINDOW
BRICK BEYOND
CONTINUOUS 20 OZ. COPPER CLEAT
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
4-1/2" RIGID INSULATION
16 OZ. COPPER FLASHING
4' - 6"MASTIC / SEALANT
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
EXISTING WOOD DECKING
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
COPPER FLASHING
COPPER FLASHING
SOLDER OR SEAL ALL SCUPPER JOINTS, TYP.
BREAK METAL, TYP.
WEDGE & SEALANT
4-1/2" RIGID INSULATION
BONDING ADHESIVE
4-1/2" RIGID INSULATION
16 OZ. HEMMED COPPER FLASHING
PROVIDE FULLY ADHERED EPDM ROOFING SYSTEM OVER MECHANICALLY FASTENED COVER BOARD TO EXISTING WOOD DECK
1/2" SEALANT JOINT
EXISTING LEADED WINDOW
BRICK BEYOND
TERMINATION BAR
EXISTING MASONRY WALL
EXISTING ROOF STRUCTURE
BACKER ROD AND SEALANT
MASTIC / SEALANT
1/2" TYPE 'X' GYPSUM THERMAL BARRIER
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�410
ROOF DETAILSWestminster Presbyterian Church
1845
1 1/2" = 1'-0"1
EAVE DETAIL
1 1/2" = 1'-0"4
PARAPET DETAIL
1 1/2" = 1'-0"7
PARAPET DETAIL
1 1/2" = 1'-0"3
EMBATTLED PARAPET DETAIL
1 1/2" = 1'-0"8
BASE TIE-IN DETAIL3" = 1'-0"
6SECTION DETAIL
1 1/2" = 1'-0"5
PLAN DETAIL
1 1/2" = 1'-0"2
EAVE DETAIL
1 1/2" = 1'-0"10
SECTION DETAIL
1 1/2" = 1'-0"9
SCUPPER & ROOF DRAIN DETAIL
3" = 1'-0"11
EPDM FLASHING @ WINDOW SILL
REVISIONS AFTER ISSUANCE
NO. DATE DESCRIPTION
REMOVE EXISTING AND PROVIDENEW 16OZ COPPER CAP TO MATCH ORIGINAL PROFILE
PROVIDE MODIFIED BITUMEN UNDERLAYMENT WITHSLIP SHEETING BETWEEN COPPER
CONTINUOUS LOCK SEAM OVER BLIND NAILING OF COUNTERFLASHING
16OZ COPPER COUNTERFLASHING
CONTINUOUS 20 OZ COPPER LOCK STRIP
6"
± 4"
±4
"
EXISTING SLATE SHINGLES
EXISTING WALL & ROOF CONSTRUCTION
EXISTING COPPER GUTTERS ARE TO REMAIN. REPLACE ALL THROUGH BOLTS AT COPPER TOP HANGERS AND UNDER BRACKETS WITH NEW STAINLESS STEEL 3/16" DIA. ROUND HEAD BOLTS AND NUTS, VIF EXACT SIZE IN FIELD
PAINT EXISTING WOOD AND/OR METAL FASCIA AND CORNICE IN ITS ENTIRETY
PAINT EXISTING WOOD TRIM
NON FERROUS WEDGE AND SEAL
COUNTERFLASHING, 16 OZ. COPPER SHEET
MODIFIED BITUMENUNDERLAYMENT
EXIST. WOOD ROOFDECK BOARDS (±7/8")
20 OZ COPPER CLEAT @ 24" O.C.
16 oz. FLAT SEAM COPPER ROOF
EXISTING BRICK
EXISTING BRICK
SEPARATION SHEET
SLOPE
MIN
. 8"
MO
DIF
IED
BIT
UM
EN
U
ND
ER
LA
YM
EN
T
MIN
. 4"
OV
ER
LA
P
± 1
2"
EXIST. WOOD ROOF DECK BOARDS
EXIST. WOOD RAFTER
PROVIDE NEW MODIFIED BITUMENUNDERLAYMENT @ WHOLE AREA
ROSIN PAPER BETWEEN FLASHING ANDUNDERLAYMENT
REMOVE & REPLACE SLATE ROOFING, FASTEN SLATE WITH LARGE FLAT HEAD COPPER WIRE NAILS
16OZ. COPPER FLASHING
20 OZ COPPER CLEAT
REMOVE EXISTING & PROVIDE NEW FLAT SEAM COPPER ROOFING
INVERTED V
MIN
. 6"
MIN
. 8"
ALL SEAMS ARE TO BE MALLETED AND SOLDERED WITH 1/2" MINIMUM LOCK SEAMS. PROVIDEMODIFIED BITUMEN UNDERLAYMENT AND SEPARATION SHEETING, TYP.
20 OZ COPPER CLEATS, MIN. 2" WIDE, TYP.
2'-4" MAX.
1'-8"
MA
X.
EXISTING BRICK
NON FERROUS WEDGE AND SEAL
COUNTERFLASHING, 16 OZ.COPPER SHEET
MODIFIED BITUMENUNDERLAYMENT
EXIST. WOOD ROOF DECK BOARDS (±7/8")
20 OZ. COPPER CLEAT 24" O.C.
20 OZ. COPPER BASE FLASHING
EXIST. BRICK
SEPARATION SHEET
MIN. 10" BASE FLASHING
MIN
. 8"
MO
DIF
IED
BIT
UM
EN
UN
DE
RLA
YM
EN
T
MIN
. 4"
OV
ER
LA
P
± 1
2"
VIF
MA
TC
H O
RIG
INA
L F
LA
SH
ING
CO
VE
RA
GE
3/4"
5 1/2"
3/4"
5 3
/4"
7 1
/4"
1" 3/8"
EXISTING SLATE SHINGLES
EXISTING ROOF STRUCTURE
EXISTING MASONRY WALL
1' -
1"
RE
MO
VE
EX
IST
ING
A
ND
PR
OV
IDE
NE
W
WO
OD
FA
SC
IA/
CO
RN
ICE
TO
MA
TC
H
OR
IGIN
AL. V
ER
IFY
ALL
TR
IM P
RO
FIL
ES
AN
D
MA
TC
H. P
AIN
T A
LL
10 /A-411
9 /A-411
3' - 4"
15
' -
4"
1' -
2 1
/2"
1' -
2 1
/2"
2' -
0"
REMOVE ALL HORIZONTAL WOOD SLATS. PROVIDE NEW 16 OZ. COPPER SHEET METAL CLADDING OVER ALL NEW PRESSURE TREATED WOOD SLATS AND EXISTING FRAME (PAINT WOOD PRIOR TO CLADDING IN COPPER). MATCH ORIGINAL WOOD SHAPES AND PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS TO INCLUDE PLANS, ELEVATIONS, SECTIONS AND DETAILS FOR APPROVAL BY THE ARCHITECT.
PROVIDE NEW 16 OZ. COPPER BASE COUNTERFLASHING APRON OVER EXISTING SAND STONE TO REMAIN. MATCH ORIGINAL SHAPES & PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS FOR APPROVAL FROM ARCHITECT
EXISTING BRICK BEYOND
EXISTING WOOD TRIM BEYOND
WOOD JAMB EXTENDS INTO MASONRY WALL
1' -
5"
3"
2"
MIN
.
1' - 0 1/2"
PROVIDE NEW BLACK INSECT SCREEN IN FRAME, FASTENED TO LOUVER FRAMES ON INTERIOR OF ALL BELFRY LOUVER OPENINGS
EXISTING MASONRY WALL
PROVIDE NEW 16 OZ. COPPER BASE COUNTERFLASHING APRON OVER EXISTING STONE TO REMAIN. MATCH ORIGINAL SHAPES & PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS FOR APPROVAL FROM ARCHITECT
PROVIDE COPPER CLEATS, MIN 18" O.C. FOLDED INTO CONTINUOULD LOCK STRIP (TYP.)
WRAP COPPER FLASHING OVER EXISTING SILL. MATCH ORIGINAL SHAPES & PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS FOR APPROVAL FROM ARCHITECT
REMOVE ALL HORIZONTAL WOOD SLATS. PROVIDE NEW 16 OZ. COPPER SHEET METAL CLADDING (WITH SLIP SHEETING) OVER ALL NEW PRESSURE TREATED WOOD SLATS AND EXISTING FRAME (PAINT WOOD PRIOR TO CLADDING IN COPPER) MATCH ORIGINAL WOOD SHAPES AND PROFILES EXACTLY. ALL CONSTRUCTION IS TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS TO INCLUDE PLANS, ELEVATIONS, SECTIONS AND DETAILS FOR APPROVAL BY THE ARCHITECT
WEDGE AND SEALANT
NOTE:SEAM & SOLDER ALL COPPER WATER TIGHT
WEDGE ROD & SEALANT
EXISTING WOOD TRIM
EXISTING MASONRY WALL
PROVIDE NEW 16 OZ. COPPER BASE COUNTERFLASHING APRON OVER EXISTING STONE TO REMAIN. MATCH ORIGINAL SHAPES & PROFILES EXACTLY. PROVIDE SHOP DRAWINGS FOR APPROVAL FROM ARCHITECT
WRAP COPPER FLASHING OVER EXISTING SILL. MATCH ORIGINAL SHAPES & PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS FOR APPROVAL FROM ARCHITECT
PROVIDE NEW 16 OZ. COPPER SHEET METAL CLADDING (WITH SLIP SHEETING) OVER EXISTING FRAME (PAINT WOOD PRIOR TO CLADDING IN COPPER) MATCH ORIGINAL COPPER SHAPES AND PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS TO INCLUDE PLANS, ELEVATIONS, SECTIONS AND DETAILS FOR APPROVAL BY THE ARCHITECT
12 /A-411
4' - 2 1/2"
5' - 0"
PROVIDE NEW 16 OZ. COPPER SHEET METAL CLADDING (WITH SLIP SHEETING) OVER NEW WOOD FRAME (PAINT WOOD PRIOR TO CLADDING IN COPPER) MATCH PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS TO INCLUDE PLANS, ELEVATIONS, SECTIONS AND DETAILS FOR APPROVAL BY THE ARCHITECT
REPOINT MASONRY RING
FIBER CEMENT PANEL FULLY ADHEARED TO PLYWOOD BACKING
1/4"
1 1/2"
1/4"3/4"
1/2
"1
"1
"1
/2"
1"
1"
1/2
"
5 1
/2"
2 X 6 WOOD BLOCKING
1/4" SHIM
BACKER ROD AND SEALANT (TYP.)
WEDGE AND SEALANT (TYP.)
FIBER CEMENT PANEL FULLY ADHEARED TO PLYWOOD BACKING
WOOD STOP
WOOD STOP
PROVIDE NEW 16 OZ. COPPER SHEET METAL CLADDING (WITH SLIP SHEETING) OVER NEW WOOD FRAME (PAINT WOOD PRIOR TO CLADDING IN COPPER) MATCH PROFILES EXACTLY. ALL CONSTRUCTION TO BE WATER TIGHT. PROVIDE SHOP DRAWINGS TO INCLUDE PLANS, ELEVATIONS, SECTIONS AND DETAILS FOR APPROVAL BY THE ARCHITECT
1/2" PRESSURE TREATED PLYWOOD
REPOINT
DATE:
DRAWING NUMBER
SEALDRAWING TITLEARCHITECT OF RECORD
DRAWING SUBMISSION STATUS: [ ] NOT FOR CONSTRUCTION [ ] SCHEMATIC DESIGN [ ] DESIGN DEVELOPMENT [ X ] CONSTRUCTION DOCUMENTS [ X ] ISSUED FOR CONSTRUCTION
ROOFING: REPAIR AND REROOFING
724 DELAWARE AVEBUFFALO, NY, 14209
PROJECT NUMBER:
4/15/2019
A�411
ROOF, LOUVER & OCULUS DETAILSWestminster Presbyterian Church
1845
3" = 1'-0"1
SLATE RIDGE CAP FLASHING
1 1/2" = 1'-0"4
EAVE DETAIL
1 1/2" = 1'-0"6
COPPER BASE TIE-IN DETAIL
1 1/2" = 1'-0"5
DETAIL IMPORT 5
1 1/2" = 1'-0"7
FLAT SEAM ROOFING DETAIL
3" = 1'-0"3
SLATE STEP FLASHING DETAIL1 1/2" = 1'-0"
2EAVE DETAIL
1/2" = 1'-0"8
LOUVER ELEVATION
3" = 1'-0"9
LOUVER SILL DETAIL3" = 1'-0"
10LOUVER JAMB DETAIL
1" = 1'-0"11
OCULUS OPENING3" = 1'-0"
12OCULUS JAMB DETAIL
REVISIONS AFTER ISSUANCE