    Type Testing and Pre-Qualification Testing

    of a 230 kV EHV Cable System

    Western Underground

    September 27, 2012

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    2/38

    TAT and PQT of 230 kV System(Re: IEC, AEIC and ICEA)

    Company Introduction and CapabilitiesPlans for 230 kV SystemCertification and Reports

    Range of Approval

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    3/38

    Introduction to XIGNUX

    LOW, MEDIUM & HIGH VOLTAGE CABLES

    LOW, MEDIUM & HIGH VOLTAGE CABLES

    CME WIRE & CABLE

    CMSA

    MAGNEKON

    ELETEC

    MULTIPAK

    CDN

    SAO MARCO

    TRANFORMERSTRANFORMERS

    PROLEC GE

    INDO TECHGE PROLEC

    PROCESSINGINDUSTRIESPROCESSINGINDUSTRIES

    CARNES FRIAS

    BOTANAS

    DESIGN CONSTRUCTION

    DESIGN CONSTRUCTION

    Infrastructures

    VOLTRAK

    PROSEL

    SCHRADER

    IOESA

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    4/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    5/38

    HV & EHV Technological Advances inViakables History1976. The first 69 kV high voltage cable with EPR insulation in Latin-American.

    1986. 115 kV XLPE HV cable.

    1998. 138 kV XLPE HV cable.

    2005. 138 kV XLPE HV cable IEC 60840 Qualification (CTL Lab).

    2011. 230 kV XLPE EHV system IEC 62067 (NEETRAC).

    2011-2012. 138 kV XLPE HV Smooth Aluminum Sheath Cable and Copper WiresShield and Aluminum Foil Laminated Cable, IEC 60840, AEIC CS9 & ICEA S-108-

    720 Qualification (CTL Lab).

    2011-2012. 230 kV XLPE EHV system AEIC/ICEA (NEETRAC).

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    6/38

    HV Cables ExperienceMV Extruded (XLPE / EPR) and PILC cablemanufacturer for more than 45 years.

    HV XLPE Extruded 69 kV manufacturer forover 30 years.

    HV XLPE Extruded115 /138 kV

    manufacturer for over 25 years.

    More than 1.1 million meters for HV & EHVProducts.

    Largest order: 190 km Cu 800 mm 2 115 kV.

    Average order: 10 km.

    69 -138 kV history highlights in recent years:

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    7/38

    HV & EHV Technical Capabilities

    Dry Cured Extrusion.

    True Triple Extrusion(Vertical state of the art process).

    For HV & EHV:69 kV 138 kV250 2000 mm 2

    230 kV380 2000 mm 2

    Eccentricity lower than 5%.

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    8/38

    Introduction to CME

    CABLESCABLES

    DISTRIBUTIONBUILDING WIRE

    ENERGYPOWER & CONTROL

    CABLESCABLES

    Distribution Division Construction wire Residential Commercial Industrial

    Energy Division Utility T & D Substations, Power Generation Industrial OEM & Specialty

    CABLESCABLES

    MAGNEKON MAGNET WIRE

    Magnet Wire Motor Repair Transformer Winding OEM

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    9/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    10/38

    Plans for 230 kV System

    Critical Elements

    Market Study To understand demand for cable systems & decide on construction .

    Accessories In house or work with a manufacture of accessories. Identify accessories for testing.

    Testing Understand requirements for system testingExternal Lab or In house ?

    Select Witnessing Engineer/sExecution Preparation, Testing, Reporting, etc.

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    11/38

    230 kV Cable Construction

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    12/38

    ABB Kabeldon Exterior Cable Terminations

    APECB 245 kV Outdoor Termination Ceramic Premolded EPDM Stress Cone for geometric stress control

    Filling with Polybutene oilWeight: 515 Kg Creepable distance: 8300 mm, Height: 2570 mm

    Maximum stress in the accessory: 3.7 kV/mm

    APECB 245 kV Outdoor Termination Silicone Premolded EPDM Stress Cone for geometric stress control

    Filling with Polybutene oilWeight: 290 Kg Creepable distance: 9360 mm, Height: 3030 mm

    Maximum stress in the accessory: 3.7 kV/mm

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    13/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    14/38

    Testing Requirements for HV & EHV Power CableSystems 46< kV 345 (Ref: AEIC CS9)

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    15/38

    Testing Requirements for HV & EHV Power CableSystems 150< kV 500 (Ref: IEC 62067)

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    16/38

    Testing Requirements for HV & EHV Power Cables46< kV 345 (Ref: ICEA S-108-720)

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    17/38

    Protocols for 230 kV System

    IEC 62067 (System)ICEA S-108-720 (Cable)Combined (IEC and ICEA) Test Program (Ref: NEETRAC)Sequential IEC, ICEA Test Program to Satisfy both IEC and

    AEIC Requirements

    Compliance with AEIC CS9 through Compliance with:

    IEC 62067 (System)+ICEA S-108-720 (System, not cable only)+IEC 62067 Annex D (Test for outer protection of buried joint)

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    18/38

    Testing Capabilities (EHV)

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    19/38

    Witnessing EngineersCFE Comisin Federal de Electrcidad

    Laboratory Equipment and Materials Testing (LAPEM) is an organization of the Federal Electricity Commission which aims to meet the needs of national and international power sector, providing specialized engineering studies, laboratory and field equipment and materials, and as quality management and supply systems

    in a reliable, timely and effective, based on a high degree of specialization of its staff, with a service oriented attitude.

    NEETRAC is a self supporting, membership based center within the School of Electrical and Computer Engineering at

    Georgia

    Tech.

    Our

    goal

    is

    to

    help the electric utility industry solve the every day problems associated with the complex task of transmitting

    and distributing electric energy reliability and efficiently.

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    20/38

    IEC 62067 Type Test set up for 230 kVSET UP LOOP IEC 62067 20 DAYS @ 254 kV

    20 HEATING CYCLES @ 95 C

    IMPULSE TEST 10 @ 1050 kVANNEX D

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    21/38

    IEC 62067 Type Test Results

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    22/38

    AEIC CS9 & ICEA S-180-720 Type Test set up for 230 kVSET UP LOOP 20 DAYS @ 266 kV

    20 HEATING CYCLES @ 105 C

    IMPULSE TEST 10 @ 1050 kV

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    23/38

    AEIC CS9 & ICEA S-108-720 Type Test Results

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    24/38

    IEC 62067 Pre-Qualification set up

    JOINT: STRAIGHTTERMINATION: Right Porcelain, Left Composite. Middle termination is the voltage feed (siphon) from the

    laboratory

    SF6 TERMINATIONS

    JOINT: CROSS

    BONDED

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    25/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    26/38

    IEC 62067 Pre-Qualification Results

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    27/38

    AEIC CS9 Pre-Qualification for 230 kVAdditional 90 HEATING CYCLES after IEC PQT @

    105 C and 226 kV

    IMPULSE TEST 10 @ 1050 kV

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    28/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    29/38

    Sequence of Load Cycles Applied to the 230kV XLPE Qualification Cable System

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    30/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    31/38

    Sequence of Load Cycles Applied to the 230kV XLPE Pre Qualification Cable System

    It is particularly noteworthy that the compliance with AEIC CS9-06 was achievedon a cable that had previously completed the requirements of IEC 62067 2006Section 13 cable system test (reported separately). Thus it had completed asequence of load cycles as shown in Table 1. Furthermore the 230 kV XLPE PreQualification Cable System has completed two sequences of impulse tests atelevated temperatures (10 positive / 10 negative).

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    32/38

    Test of Outer Protection for Buried Joint IEC 62067 ANNEX D

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    33/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    34/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    35/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    36/38

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf

    37/38

    1. Cable system voltages 230 kV2. Conductor sizes 2000 mm23. Cable systems with emergency operating temperatures 105 C.4. Cable systems with the same or similar construction as that tested:

    a) Cables manufactured at Conductores Monterrey Plant, using a Vertical Continuous Vulcanization (VCV) line and insulating and semi conducting materials Dow HFDA 0801 BK / Dow HFDB 4201 SC / Dow HFDK 0587 BK Sb) Terminations provided by ABB Kabeldon of Sweden (APECB 245 kV Outdoor Terminations (Composite & Porcelain) )c) Terminations provided by ABB Kabeldon of Sweden (APEGA 245 kV Outdoor Terminations (GIS))d) 245 kV JS A M Premolded One Piece EPDM Slip On Straight Joint type 14, provided by ABB Kabeldon of Swedene) 245 kV JX B M Premolded One Piece EPDM Slip On Cross Bonded Joint type 14, provided by ABB Kabeldon of

    Sweden

    5. Cable systems with the same or lower electrical stresses as that tested:a) Cables with voltage stresses on the cable at the conductor screen 7.58 kV/mm and at the insulation screen 4.37

    kV/mm.b) Terminations with composite and porcelain bodies for voltages 230 kV and maximum electrical stresses within the

    insulation 3.7 kV/mm (detailed documentation on file with Conductores Monterrey).c) GIS Terminations for voltages 230 kV and maximum electrical stresses within the insulation 3.7 kV/mm (detailed

    documentation on file with Conductores Monterrey).d) Premolded One Piece EPDM Slip On Straight Joint for voltages 230 kV and maximum electrical stresses within the

    joint insulation 5 kV/mm (detailed documentation on file with Conductores Monterrey).e) Premolded One Piece EPDM Slip On Cross Bonded Joint for voltages 230 kV and maximum electrical stresses

    within the joint insulation 5 kV/mm (detailed documentation on file with Conductores Monterrey).

    Range of Approval for 230 kV SystemAEIC CS9 06

  • 7/21/2019 western underground - sept 2012 - hv and ehv cables-cme 20120927.pdf