WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN HOUSE AND PRESENTATION PHASE 3 & 4 PROGRESS

Transcript of WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

Page 1: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES

OPEN HOUSE AND PRESENTATIONPHASE 3 & 4 PROGRESS

Page 2: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

AGENDA

WELCOME

SCHEDULE OVERVIEW

RECAP PROJECT TO DATE

LAND USE PLAN COMPARISONS

DRAFT PROPOSED LAND USE PLAN

NEXT STEPS

EASEL DISCUSSION

Page 3: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

WHERE HAVE WE BEEN?

WHERE ARE WE NOW?

WHERE ARE WE GOING?

SCHEDULE OVERVIEW

Page 4: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

SCHEDULE OVERVIEW

Page 5: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

COMPLETED TO DATE

PHASE ONE: PROJECT INITIATION

• DATA GATHERING

• MARKET STUDY AND PROJECTIONS

• PUBLIC OPEN HOUSE AND INPUT

• STAKEHOLDER INPUT

• CITY REVIEW AND INPUT

SCHEDULE OVERVIEW

Page 6: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

SCHEDULE OVERVIEW

COMPLETED TO DATE

PHASE TWO: MASTER PLANNING

• BUS TOUR

• DRAFT PROPOSED LAND USE PLAN

• DRAFT PROPOSED DETAILED MASTER

PLAN

Page 7: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

SCHEDULE OVERVIEW

COMPLETED TO DATE

PHASE THREE AND FOUR: DESIGN GUIDELINES AND STANDARDS

• INFRASTRUCTURE ANALYSIS/STORMWATER MANAGEMENT

EVALUATION – WATER, SANITARY, STORM

• DRAFT ARCHITECTURAL DESIGN GUIDELINES

• DRAFT DESIGN GUIDELINES

• DRAFT ZONING OVERLAY

Page 8: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

CURRENT LAND USE PLAN

HIGH DENSITY RESIDENTIAL – 16+ du/ac

MEDIUM DENSITY RESIDENTIAL – 6-16 du/ac

LOW DENSITY RESIDENTIAL – 0-6+ du/ac

NEIGHBORHOOD COMMERCIAL

CORRIDOR COMMERCIAL

REGIONAL COMMERCIAL

MIXED USE

RESEARCH PARK

CORPORATE CAMPUS / PROFESSIONAL OFFICE

INDUSTRIAL

PUBLIC/SEMI-PUBLIC

PARKS

OPEN SPACE

Page 9: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED LAND USE PLAN

Page 10: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

GENERAL LAND USE ACREAGE COMPARISON

Draft Proposed PlanCurrent Plan

DRAFT PROPOSED LAND USE PLAN

188

265

34

15

211

101

147

284

102

96

289

298

234

24

0

250

101

29

203

102

74

345

0 50 100 150 200 250 300 350 400

Low Density Residential

Medium Density Residential

High Density Residential

Neighborhood Commercial

Corridor Commercial

Regional Commercial

Mixed Use

Corporate Campus/Professional Office

Industrial (Existing)

Public/Semi-public

Open Space

Page 11: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

GENERAL LAND USE PERCENTAGE COMPARISON

DRAFT PROPOSED LAND USE PLAN

Page 12: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED MASTER PLAN

1 2

3 4

Page 13: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED MASTER PLAN 1 2

3 4

1

Page 14: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED MASTER PLAN 1 2

3 4

2

Page 15: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED MASTER PLAN 1 2

3 4

3

Page 16: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DRAFT PROPOSED MASTER PLAN 1 2

3 4

3

Page 17: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

DESIGN GUIDELINES

Page 18: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

• OVERLAY ZONING

• CIRCULATION GUIDELINES

• LANDSCAPE, OPEN SPACE BUFFERING, AND SCREENING GUIDELINES

• ARCHITECTURAL DESIGN GUIDELINES

• SUSTAINABLE DESIGN AND STORMWATER BEST MANAGEMENT

PRACTICES

• SIGNAGE DESIGN GUIDELINES

DESIGN GUIDELINES

Page 19: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

NEXT STEPS

• RECEIVE PUBLIC INPUT

• THIS EVENING

• ONLINE

• FINALIZE DETAILED MASTER PLAN

• FINALIZE DESIGN GUIDELINES

• FINALIZE STORMWATER AND UTILITY

Page 20: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...

EASEL DISCUSSION

• PLEASE JOIN US IN THE LOBBY

FOR DISCUSSION AND INPUT

Page 21: WEST LAND USE AREA MASTER PLAN AND DESIGN GUIDELINES OPEN ...