West Coast Light Sources
Simon Clark
2004 COMPRES Annual MeetingGranlibakken Resort and
Conference Center, Lake Tahoe, California
June 19-22, 2004
West Coast Light Sources
• Advanced Light Source, Berkeley
• SPEAR3, SLAC
• SPPS, SLAC
• LCLS, SLAC
Who was who at the ALS
Who’s who at the ALS?
?
Three beam lines for high-pressure
• BL11.3 DAC powder and single crystal x-raydiffraction
• BL1.4 DAC infra-red spectroscopy
• BL12.2.2 DAC XAS and x-ray diffraction resistive and laser heating
Support facilities
• HP lab Gasket prep., cell loading, Raman
• Ruby line
• Software JCPDS, Fit2d …….
BL11.3
Understanding strength in materials: OsB2
Understanding strength in materials: OsB2
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
1.01
0 5 10 15 20 25 30 35
Pressure (GPa)
Fra
cti
on
al
Vo
lum
e C
om
pre
ss
ibil
ity
Run 1
Run 2
Bo = 395 GPa
BL1.4
BL1.4: Study of Talc and 10A phase
BL1.4: Study of Talc and 10A phase
BL12.2.2
Current end station configuration
First experiment
Compression of white phosphorous
0
1000
2000
3000
4000
5000
6000
7000
8000
0 5 10 15 20 25
Two theta (degrees)
Inte
nsi
ty (
a.u
.)0.14 GPa bcc
0.28 GPa bcc
0.75 GPa bcc
1.22 GPa bcc
1.57 GPa bcc
1.5 GPa bcc
1.79 GPa bcc
2.67 GPa bcc+o
3.76 GPa bcc+o
4.1 GPa o
7.3 GPa r
13.6 GPa sc
17.2 GPa sc
22.4 GPa sc
First experiment
Volume compression of white phosphorous
7
8
9
10
11
12
13
14
15
16
17
0 5 10 15 20 25 30
Pressure (GPa)
Mo
lar
volu
me
(cc)
bcc
orthorhombic
hexagonal
simple cubic
orthorhomic from K&I
hexagonal from K&I
simple cubic from K&I
hexagonal on depress.
ortho. on depress.
Laser heating system in lab.
Schematic of laser heating system
Laser heating goes live!
Heating fluids
Outline development plan for beam line 12.2.2
Beam line Construction Phase
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
200
2
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
200
3
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
200
4
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
200
5
ConceptualDesignReview
Beam lineDesignReview
Beam lineReady for
Commissioning
End StationReady for
Commissioning
BeginPRT
Operation
BeginUser
Operation
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
200
6
StartProject
OrderLong LeadTime Items
Beam line Design Phase
Beam line Construction Phase Commissioning Phase
Honeymoon Period: PRT Only Operation
PRT and General User Operation
OutlineProposal
Submitted
FullProposal
Submitted
Summary
• ALS• Beamlines 11.3 and 1.4 fully operational• Beamline 12.2.2 in commissioning with friendly users
• SPEAR3 • No plans as yet
• SPPS• First test experiments this year
• LCLS• Letter of intent submitted• Proposal for development program submitted