    Lecture 02 Types of well test

    *

  • 8/13/2019 well test interpretation 2.pptx

    2/19

    *In well testing, we provide input and observe

    the output.

    *Input is the parameter under our control

    whereas, output is dependent upon system and

    input

    *In well testing input is a change in flow rate

    and output is the pressure response

    *Input may be change in production rates or

    change in injection rates (if applicable)

  • 8/13/2019 well test interpretation 2.pptx

    3/19

    *Types of Well tests:

    Drawdown test

    Buildup test

    Injection test

    Fall off testDrill Stem Test

    Interference test

  • 8/13/2019 well test interpretation 2.pptx

    4/19

    *Drawdown Test

    In a drawdown test, we start flowing a wellthat is initially shut-in, static and stable.

    The flow rate is supposed to be constant.

  • 8/13/2019 well test interpretation 2.pptx

    5/19

    Drawdown Test

  • 8/13/2019 well test interpretation 2.pptx

    6/19

    Suitable for reservoirlimits.

    Traditional analysismethods aredeveloped fordrawdown tests.

    Difficult to flow a wellat a constant rate.

    Well conditions maynot be static or stable.

  • 8/13/2019 well test interpretation 2.pptx

    7/19

    *Buildup Test

    In a buildup test, a well that is flowing

    (ideally at a constant rate) is shut in and

    downhole pressure measured as the

    pressure builds up.

  • 8/13/2019 well test interpretation 2.pptx

    8/19

    Buildup Test

  • 8/13/2019 well test interpretation 2.pptx

    9/19

    Constant flow ratecondition is easilyachieved as the flowrate is zero.

    Only slightmodification ofanalysis techniquesused for drawdownanalysis is required

    Difficult to achieveconstant rateproduction prior toshut in.

    Production loss whilethe well is shut in.

  • 8/13/2019 well test interpretation 2.pptx

    10/19

    *Injection Test

    Similar to drawdown test except that the

    flow is into the well rather than out of it.

  • 8/13/2019 well test interpretation 2.pptx

    11/19

    *

  • 8/13/2019 well test interpretation 2.pptx

    12/19

    Injection rates

    are easier tocontrol thanthe productionrates.

    Complicated

    analysis ifmultiphaseeffects areobserved

  • 8/13/2019 well test interpretation 2.pptx

    13/19

    *Fall off test

    Similar to buildup test except that

    injection is stopped rather than

    production. In fall off test we observe

    pressure decline.

  • 8/13/2019 well test interpretation 2.pptx

    14/19

  • 8/13/2019 well test interpretation 2.pptx

    15/19

    Injection ratesare easier tocontrol.

    Production loss issmall ascompared to

    buildup test

    Multiphaseeffects makeanalysis difficult

  • 8/13/2019 well test interpretation 2.pptx

    16/19

    *Interference Test

    In an interference test, one well is

    produced (or shut in) and the pressure

    response is measured at another well (or

    wells). Interference tests helps to

    characterize the reservoir over a largerscale than the single well test.

    Interference test is possible with any

    type of pressure disturbance

    (drawdown, buildup, injection, fall off)

  • 8/13/2019 well test interpretation 2.pptx

    17/19

    *Drill Stem Test

    This test is carried over a newly drilled

    well. We temporarily complete the well

    and produce it for a small period of time.

    Then we shut in. Again we start producing

    but this second flow period is longer.Then we shut in the well again.

  • 8/13/2019 well test interpretation 2.pptx

    18/19

    *

    *Modern well test analysis a computer aided

    approachby Ronald N. Horne

  • 8/13/2019 well test interpretation 2.pptx

    19/19

    *

    *Continued discussion regarding fundamental

    concepts