Well Completions - King · PDF fileWell Completions Thursday, 4 July 13. Well Completions...

75
Well Completions Thursday, 4 July 13

Transcript of Well Completions - King · PDF fileWell Completions Thursday, 4 July 13. Well Completions...

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

ComponentsandFunctionality

Thursday, 4 July 13

ComponentsandFunctionality

Thursday, 4 July 13

ComponentsandFunctionality

Thursday, 4 July 13

Xmas Tree &Wellhead

Thursday, 4 July 13

Open-Hole Completion

Thursday, 4 July 13

Open-Hole Completion

Thursday, 4 July 13

Slotted-Liner,Wire-Wrapped(WWS) Screen

Thursday, 4 July 13

Slotted-Liner,Wire-Wrapped(WWS) Screen

Thursday, 4 July 13

Cemented &PerforatedLiner/Casing

Thursday, 4 July 13

Cemented &PerforatedLiner/Casing

Thursday, 4 July 13

Different Production Methods

Thursday, 4 July 13

Tubing &Make-up

Thursday, 4 July 13

Tubing &Make-up Premium (gas-tight) connection

Thursday, 4 July 13

Tubing &Make-up Premium (gas-tight) connection

ONLY A BARRIER WITH CORRECT MAKE-UP!

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Safety Valves(Ball/Flapper)

Thursday, 4 July 13

Safety Valves(Ball/Flapper)

Thursday, 4 July 13

Safety Valves(Ball/Flapper)

Thursday, 4 July 13

Control Line

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Side PocketMandrel

Thursday, 4 July 13

Side PocketMandrel

Thursday, 4 July 13

Side PocketMandrel

Thursday, 4 July 13

Setting and Retrievinga valve in a SPM?

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Sliding Side-Door (SSD)

Thursday, 4 July 13

Sliding Side-Door (SSD)

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Why may a Seal Assembly be required?

Thursday, 4 July 13

Tubing Movement

Why may a Seal Assembly be required?

Thursday, 4 July 13

Having an Anchor, & incorrect set completion

Thursday, 4 July 13

Seal Assembly

Thursday, 4 July 13

PBR Seal Assembly

Thursday, 4 July 13

PBR Seal Assembly

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

ProductionPacker

Thursday, 4 July 13

Packer Setting

Thursday, 4 July 13

Packer Setting

To set Packer inner Mandrel moves up, driving the lower cone below ‘slips’, forcing them into

the casing wall.

Thursday, 4 July 13

Packer Setting

To set Packer inner Mandrel moves up, driving the lower cone below ‘slips’, forcing them into

the casing wall.

Sealing Element is compressedand ‘extruded’ into the casing.

Thursday, 4 July 13

Mill-OutExtension

Thursday, 4 July 13

Mill-OutExtension

If Packer run with a tailpipe, a Mill-Out Extension sleeve must be run

immediately below packer in which the catch sleeve will locate. Catch Sleeve collects

remains of packer when milling operation is complete and the tool retrieved

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Profile (‘Nipple’)

Thursday, 4 July 13

Profile (‘Nipple’)Installed at various points to allow:

(a) ‘Plugging’ tubing for:(i) Pressure testing(ii) Setting hydraulic packers(iii) Zonal isolation

(b) Installing flow control equipment:(i) Downhole chokes, regulators, SSVs,(ii) Locating pressure gauges

Thursday, 4 July 13

Profile (‘Nipple’)Installed at various points to allow:

(a) ‘Plugging’ tubing for:(i) Pressure testing(ii) Setting hydraulic packers(iii) Zonal isolation

(b) Installing flow control equipment:(i) Downhole chokes, regulators, SSVs,(ii) Locating pressure gauges

Classified into three basic designs:- Top No-go (No-go shoulder located above seal- bore.- Bottom No-go (No-go shoulder located below seal-bore- Selective Nipples (locking mechanism is selective, and has to be specifically actuated by wireline tool).

Thursday, 4 July 13

Halliburton XN(No-Go) LockingMandrel

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Perforated Joint/Flow-Tube

Thursday, 4 July 13

Perforated Joint/Flow-Tube

Allows flow to enter tubing even if no access to base of tubing

(pressure gauges, etc.)

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Well Completions

Thursday, 4 July 13

Tail-pipe

Tailpipe suspended beneath packer performs number of functions:(1) Provides entry flow path for produced fluids into tubing.(2) Provides nipple capability for ‘plugging’ beneath the packer.(3) Provides nipple capability for landing off pressure/temperature gauges.(4) Provides a Mill-Out Extension as latch area for packer retrieval operations.(5) Provides additional seal bore length.(6) Allows for easy re-entry of wireline tools back into the tubing.

Thursday, 4 July 13

Tail-pipe

Tailpipe suspended beneath packer performs number of functions:(1) Provides entry flow path for produced fluids into tubing.(2) Provides nipple capability for ‘plugging’ beneath the packer.(3) Provides nipple capability for landing off pressure/temperature gauges.(4) Provides a Mill-Out Extension as latch area for packer retrieval operations.(5) Provides additional seal bore length.(6) Allows for easy re-entry of wireline tools back into the tubing.

Thursday, 4 July 13

Single Zone Completion with no Provision for Tubing Movement

Thursday, 4 July 13

Single Zone Completion Utilising Locator Seal Assembly

Thursday, 4 July 13

Single High Flow-rate Zone Completion Utilising Extra-Long Tubing Seal Receptacle for Tubing Movement

Thursday, 4 July 13

Single Zone High Flow-rate Injection/Production Completion UtilisingPolished Bore Receptacle

Thursday, 4 July 13

Single Zone Completion Utilising a Gas Lift Facility

Thursday, 4 July 13

Single Zone Completion Utilising ESP

Thursday, 4 July 13

Dual Completion allowing Segregated Production

Thursday, 4 July 13

Selective Dual Zone Producer with optional Gas Lift Facility

Thursday, 4 July 13

Tubing-less Dual Completion

Thursday, 4 July 13

Subsea Completion Serviced by Through Flow-line Techniques (TFL)

Thursday, 4 July 13

Subsea Completion Serviced by Conventional Wireline Techniques from Workboat or Mobile Drilling Rig

Thursday, 4 July 13

Thank you for using us for your company training, please call on us again for anything else you need.

www.king'et*oleum.co.uk

Thursday, 4 July 13