Tubing &Make-up Premium (gas-tight) connection
ONLY A BARRIER WITH CORRECT MAKE-UP!
Thursday, 4 July 13
Packer Setting
To set Packer inner Mandrel moves up, driving the lower cone below ‘slips’, forcing them into
the casing wall.
Thursday, 4 July 13
Packer Setting
To set Packer inner Mandrel moves up, driving the lower cone below ‘slips’, forcing them into
the casing wall.
Sealing Element is compressedand ‘extruded’ into the casing.
Thursday, 4 July 13
Mill-OutExtension
If Packer run with a tailpipe, a Mill-Out Extension sleeve must be run
immediately below packer in which the catch sleeve will locate. Catch Sleeve collects
remains of packer when milling operation is complete and the tool retrieved
Thursday, 4 July 13
Profile (‘Nipple’)Installed at various points to allow:
(a) ‘Plugging’ tubing for:(i) Pressure testing(ii) Setting hydraulic packers(iii) Zonal isolation
(b) Installing flow control equipment:(i) Downhole chokes, regulators, SSVs,(ii) Locating pressure gauges
Thursday, 4 July 13
Profile (‘Nipple’)Installed at various points to allow:
(a) ‘Plugging’ tubing for:(i) Pressure testing(ii) Setting hydraulic packers(iii) Zonal isolation
(b) Installing flow control equipment:(i) Downhole chokes, regulators, SSVs,(ii) Locating pressure gauges
Classified into three basic designs:- Top No-go (No-go shoulder located above seal- bore.- Bottom No-go (No-go shoulder located below seal-bore- Selective Nipples (locking mechanism is selective, and has to be specifically actuated by wireline tool).
Thursday, 4 July 13
Perforated Joint/Flow-Tube
Allows flow to enter tubing even if no access to base of tubing
(pressure gauges, etc.)
Thursday, 4 July 13
Tail-pipe
Tailpipe suspended beneath packer performs number of functions:(1) Provides entry flow path for produced fluids into tubing.(2) Provides nipple capability for ‘plugging’ beneath the packer.(3) Provides nipple capability for landing off pressure/temperature gauges.(4) Provides a Mill-Out Extension as latch area for packer retrieval operations.(5) Provides additional seal bore length.(6) Allows for easy re-entry of wireline tools back into the tubing.
Thursday, 4 July 13
Tail-pipe
Tailpipe suspended beneath packer performs number of functions:(1) Provides entry flow path for produced fluids into tubing.(2) Provides nipple capability for ‘plugging’ beneath the packer.(3) Provides nipple capability for landing off pressure/temperature gauges.(4) Provides a Mill-Out Extension as latch area for packer retrieval operations.(5) Provides additional seal bore length.(6) Allows for easy re-entry of wireline tools back into the tubing.
Thursday, 4 July 13
Single High Flow-rate Zone Completion Utilising Extra-Long Tubing Seal Receptacle for Tubing Movement
Thursday, 4 July 13
Single Zone High Flow-rate Injection/Production Completion UtilisingPolished Bore Receptacle
Thursday, 4 July 13
Subsea Completion Serviced by Conventional Wireline Techniques from Workboat or Mobile Drilling Rig
Thursday, 4 July 13
Thank you for using us for your company training, please call on us again for anything else you need.
www.king'et*oleum.co.uk
Thursday, 4 July 13