WELCOME TO
TRAINING PROGRAMME
FOR
CONSULTANTS’ SERVICES FOR 3rd PARTY
QUALITY CONTROL AND QUALITY
ASSURANCE G. PRABHAKAR
![Page 2: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/2.jpg)
CHAPTER 1
![Page 3: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/3.jpg)
Quality Planning Quality Control Quality Assurance Quality Audit and Quality Improvement
Design
Drawings
Specifications
Staff
Training
Laboratories
Site Organization
Debris disposal
testing of Materials at source
Borrow areas
Mix designs
Quality Control Manual
Pre Construction Activities
During Construction Activities
After construction Activities and curing
Inspections
Sampling
Testing
Reporting
Control charts
Documentation soft & Hard copies
Photographs records
Video film records.
Scrutiny of Reports and tests data
Improvements required
QUALITY MANAGEMENT SYSTEM
![Page 4: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/4.jpg)
![Page 5: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/5.jpg)
![Page 6: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/6.jpg)
![Page 7: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/7.jpg)
![Page 8: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/8.jpg)
![Page 9: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/9.jpg)
![Page 10: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/10.jpg)
![Page 11: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/11.jpg)
![Page 12: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/12.jpg)
QUALITY ASSURED BYQUALITY ASSURED BY
![Page 13: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/13.jpg)
PARTIES INVOLVED IN THE WORK TO ENSURE QUALITY
PARTY – I: Project Engineers
PARTY – II: Construction Agency
PARTY – III: Quality Assurance Consultants
![Page 14: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/14.jpg)
CONTRACTOR AND PROJECT ENGINEERS
PROJECT ENGINEERS:
are primarily responsible for Quality Assurance of
the work being executed and to conduct all field
tests before allowing further work.
• Shall check and produce to inspecting officers the
following records and O.K. Cards maintained by
the Construction Agency.
![Page 15: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/15.jpg)
a) Registers:-
1. Site order.
2. Register of Bench Marks
3. Material O.K. Register.
4. Register of foundations.
5. Register of placement for concrete, Embankment,
Reinforcement and other test reports.
6. Register of test reports of compressive strength of
concrete specimens.
7. Cement day Book.
8. Register for embankment placement
9. Roller press control register
10. Moisture Control Register
11. Embankment test results register
12. Register for shot crete
13. Register for Aggregate testing
![Page 16: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/16.jpg)
b) O.K. Cards for Big Structures and Heavy
Embankments:
1. O.K. card for cast-in-situ concrete
lining.
2. O.K. card for Earthwork
Embankment
3. O.K. card for grouting
4.O.K. card for structural concrete work.
5.O.K. card for sub-grade preparation.
6.O.K. card for RR Masonry
7.O.K. card for shot creting
8.O.K. card for grouting
![Page 17: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/17.jpg)
AE/AEEs have to check pre levels and final levels.
For measurements recorded by Construction Agency,
D.E.Es to test check measurements spread over the
entire work. E.Es/S.Es to check measure as per Codal
provisions and rules in vogue.
The measurement records have to be maintained by
Construction Agency and finally handed over to the
Engineer-in-Charge.
![Page 18: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/18.jpg)
The observations made by Third Party Quality
Control, Department Quality Control Staff have to
be invariably complied with before the next bill
for payment is presented. To this effect certificate
has to be recorded by Construction Agency and
countersigned by the field engineers.
![Page 19: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/19.jpg)
It will be better if the Monthly review
meetings are conducted by the
concerned SE’s invariably involving
Quality Control and construction
agencies to discuss the Quality
Assurance aspects and record the
minutes of the said meetings.
![Page 20: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/20.jpg)
QUALITY CONTROL STAFF
Shall verify the records maintained at site by the
E.P.C. agency and the Third Party Quality Control
Consultants.
The TPQC Consultant shall witness and verify 10%
tests being carried out by contractor.
Shall associate with construction staff or conduct
independently 10% tests with required frequency
as per specifications.
![Page 21: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/21.jpg)
QUALITY CONSULTANTS
The Third Party Quality Assurance Consultants
should posses all the testing independent
testing to assure the Quality of work.
Quality requirements should be clear and
verifiable.
![Page 22: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/22.jpg)
DESCRIPTION OF TASKS
Review of Design, plans and specifications for
constructability and operability.
Important decisions regarding Quality of
works are made during design and planning
stages. Quality Assurance during construction
depends on conformance to the design and
specifications.
![Page 23: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/23.jpg)
consultant to participate in designs
review meeting with project
engineers and contractor’s
representatives and give suggestions,
if any………………..
![Page 24: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/24.jpg)
CONSULTANT TO PROVIDE
Services enabling the Government to ensure best
Quality of Construction in the Project by working closely
with the Field Engineers.
TASKS TO BE PERFORMED BY THIRD PARTY
Review of Designs and Drawings HPs, Designs of
Structures & Specifications and Review of QMP of EPC
Agency.
![Page 25: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/25.jpg)
Review Contractor’s Test Data & Conduct
tests in selected frequency.
Review of Mix Design
NDT Data on finished items
Non-Conformities – Corrective action
Calibration Report
Quality Certificate
Inter Lab Testing
![Page 26: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/26.jpg)
CALIBRATION OF TESTING CEMENT
QA consultant to verify calibration of all their
and Contractor’s testing and measuring
equipment – reports on calibration status,
frequency of recalibration etc. to be submitted
to the Engineer-in-Charge.
The qualifications, experience of the testing
personnel have to be assessed.
![Page 27: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/27.jpg)
QUALITY MANAGEMENT SYSTEM
Quality of the work is dependent upon the
participating constituents, some of which are
sustainable and effectively controlled while
others are not.
The process of managing the quality is
through QMP.
![Page 28: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/28.jpg)
QUALITY MEASURES
Periodic inspection, testing and verification.
Proper maintenance of records and
registers.
Undertaking quality audit and review of
QMP and QAP.
Provide training to all concerned.
![Page 29: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/29.jpg)
STAGES FOR INSPECTION, TESTING AND
VERIFICATION
Input Materials Inspection.
During Construction Inspection
Completed work inspection.
![Page 30: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/30.jpg)
Evaluate establish the contractor’s QMP (Quality
Management Plan) requirements to see whether the Q.C
organization possesses the following standards:
1) Evaluation of Testing and Inspection efficiency.
- Effectiveness of procedures
- Operation of Plant and Equipment
- Adequacy of personnel and
- Progress of records
![Page 31: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/31.jpg)
2) Evaluation of Internal assessment:
- Information that is adequate and accurate
- Effectiveness of communication and feed back of Quality Control decisions to the operation level.
- Control overall phases of operation.
3) Evaluation of overall performance of various Project Laboratories:
- Procedures being followed
-Performance of individual laboratories
-Inter-Laboratory testing
![Page 32: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/32.jpg)
COMPLIANCE
Procedures and controls are of no significance unless
meticulously followed. It shall be ascertained through.
-Inspection and visual observation (Ex. Concrete lining in
place, structural concrete in place etc and supplementing
it by appropriate tests).
-Examination of O.K. Card.
-Persual of control charts for cement and concrete
-Direct Enquiry.
![Page 33: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/33.jpg)
VERIFICATION
Consultant shall review the facilities and staff in
labs. to determine whether
-the personnel possess adequate knowledge of
testing procedures and
-the testing and inspections are adequate.
![Page 34: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/34.jpg)
MONITORING CONTRACTORS PROCEDURES FOR
TESTING DEFICIENCIES TO ASSURE CORRECTIVE
ACTION TAKEN – QUALITY AUDIT
Construction Deficiencies and non-conformaties.
Report to the engineer to ensure that new work is
not placed on unacceptable work.
![Page 35: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/35.jpg)
LABS – TEST RESULTS
Depend on
- Competency of the testing personnel
- Accuracy of the apparatus and equipment
- Maintaining special environment conditions
-Proper maintenance and periodical calibration of
testing machines.
-Lastly knowledge in interpretation of test results.
![Page 36: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/36.jpg)
PRE CONSTRUCITON CHECKS
INPUT MATERIALS
Trained personnel with necessary equipment to verify
for required specifications and the recommend for
acceptance.
Clear GUIDELINES to be drafted for inspection
requirements, sample plans and acceptable quality
levels. Test results and certificate of conformance to be
furnished to Engineer-in-charge.
![Page 37: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/37.jpg)
Corrective Action Notice to be issued by
Consultant when material fails to conform
to specifications.
To inform the Engineer-in-Charge whether
the material is passed or failed.
![Page 38: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/38.jpg)
QA CHECKS – ON GOING WORKS
To ensure the materials, construction works
are as per specifications of APSS and IS
codes.
Defect prevention is preferred to detection
after occurrence.
![Page 39: WELCOME TO TRAINING PROGRAMME FOR](https://reader035.fdocuments.in/reader035/viewer/2022062518/56814971550346895db6c0e6/html5/thumbnails/39.jpg)
CONDUCT TESTS AT THE WORK SITE
Consultants to maintain confidentiality as regards the
sample testing.
For reconciliation, the Engineer-in-Charge discusses with
consultants and contractors.
QA Consultant to organize inter-laboratory testing sample
with NCCB and APERL for establishing the competence of
project laboratories.
This should be done once in THREE Months.