Business Enterprise Architecture (BEA) Compliance Guidance ...
WELCOME to the Operational Tutorial for. The Principles The Principles Zoom Save As Gap Analysis Gap...
-
Upload
irene-harrington -
Category
Documents
-
view
213 -
download
1
Transcript of WELCOME to the Operational Tutorial for. The Principles The Principles Zoom Save As Gap Analysis Gap...
to theOperational
Tutorialfor
The Principles
Zoom
Save As
Gap Analysis
Compliance Guidance
Saving
Project Feasibility
Building Answers to the
Questions
Printing Feasibility
Print Level 2
Robot
Process Audit Innovator Demo
Contact Details
Innovator can be accessed from > .. Desktop Shortcut
or > .. C: Drive (default)
or > .. Start Up Menu
Accessing Process Feasibility Innovator
You can now OPEN your Process Feasibility Innovator
Innovator Software utilizes VB / VBA / Java as well as numerous Macros and Active X content for its analysis and reporting.
Some Macros and Active X content can be malicious and can contain viruses and other security hazards. To protect you, Microsoft by default, disables Macros & Active X and allows you the user to selectively enable this content if you trust the program source.
You can trust The House of Quality and enable this content.
Windows 2007 Windows 2010
This safety feature
may or may not be applicable dependent on your
Excel “macro settings”
Project Feasibility enables the 35 Requirements of Customer recognised criteria to establish if your
Organisations Management System provides adequate confidence to Customers to source specific Products.
The Process Feasibility Gap Analysis it will default to the Project Feasibility View.
A Gap Analysis paves the way for a Project Feasibility Audit.
An Internal Process Feasibility Gap Analysis (sometimes referred to as a Desk Top Audit)
is a Self Assessment to establish & document how a Management System
addresses Project Feasibility requirements.
A Gap Analysis provides Customers with confidence that the Potential exists to comply with Process Audit requirements.
More information about Project Feasibility is availableon a separate Project Feasibility Tutorial
The Process Feasibility Gap AnalysisIs customised in
Company / Audit Informationto a specific level of Process Audit
Some Housekeeping is required to
set up the information for the
Process Feasibility Gap Analysis
Information added here is displayed in various
Pages and Reports throughout
Process Feasibility Gap AnalysisThis section is Auto filled from the Audit Report
This Page duplicates as the Front Cover ofProject Feasibility innovator REPORT
Auto Filled based on your licence
Auto Filled based on your licence
Enter> The Product (or Process) Group the Audit is Applicable to.
Enter> The Reason for the Audit e.g.New contract Changed Process Process Problem
Enter> Applicable OEM Customer
Once entered, this data is utilized throughout the Process Feasibility Gap Analysis Reports.
Enter> As applicable
Enter> As applicable
Enter> As applicable
Enter> As applicable
Enter> As applicable
Auto Filled based on your licence
Auto Filled based on your licence
Note: Project Feasibility (Gap & Audit) evaluates only 1 Process Step
Note: Process Feasibility Gap Analysis: shows only the one option.
The Audit Type ..
The Audit Type ..is impregnated on each Process Feasibility gap Analysis page
Selecting the Audit Type ..
The Full Process Audit Innovator also has options for:-
Process Feasibility Audit Process Gap Analysis Process Audit
Options have customised views and reports depending on the application.
Once the Company / Audit Information has been entered push Complete to return to Innovator
All the work is done in Phases 2-3-4-5-6.1-6.2-6.3-6.4-6.5-6.5 -7.
The Rest are automated Analysis & Reports
<< 1st levelThese are the Process Audit Questionsof Phase 2
2nd level Each Question has a set of
Requirements >>
Questions for each Requirement are displayed using the Expand Bar with a Drop Down Selection Box
Select Phase 2 ..
Zoom to A specific percentage
IMPORTANTUsing the slide zoom in Windows 2010 may distort the text!
Zoom to a certain value by entering the percentage in the Zoom Box. A number from 70 to 400
a)To understand the Requirement - i.e. 2.1 Organisational Management.
b)To Briefly describe how the Organisation complies with that Requirement.
c)To Rate on a Robot G – Y – R - NR
The Principles of Process Audit Innovator are The Objective is to concisely state HOW “Organisational Management” is addressed in the QMS.
Note: on b)The Brief Description (under Evidence) can only be entered once the Requirements related to the Questions are understood and the Auditor is aware of how those Requirements are met by the Organisations Management System.
Not Rated: Maximum number of questions not assessed is limited to 3
The Requirement in the question is not achieved
The Requirement in the Question is achieved only to a certain extent
The requirements in the question is achieved
Each Question has a comment box describing typical activities that could demonstrate compliance.
The FREE HoQuality /Forum has extensive additional support providing further explanations of the Requirements.
Each Question has a number of related Requirements.
Each Question indicates A)The original German textB)The official translationC)A modified translation based on TS16949 terminology
A) .B) .C) .
The FREE Hoquality /Forum has extensive additional support providing further explanations of the Questions
FREE HoQuality /Forum
Reference
Reference
Reference
Reference
Reference
The Gap Analysis comes with editable – pre-defined answers taken from “an ideal” QMS.
Once the Questions related to each Requirement are understood
the Auditor should (under - Evidence) Document how the organisations Management Systems addresses each Question.
Where applicable a X –Ref can be indicated to any applicable Documentation.(Note: Hyperlinks can be inserted here if applicable)
Effective Organisational Managementhas a number of Requirements.
How the QMS addresses each Requirement will effect how the overall Question of Organisational Management is assessed.
How
Once how the Organisations Management System addresses the Questions are recorded The Auditor must ..
a) Assess the overall impact of the Questions on the Requirement b) Summarise that impact in the Evidence columnc) Rate the perceived level of Compliance R Y G
How
How
How
How
How
- Customer Requirements- International Network (licence
agreements)- Job Descriptions for Project Manager- Project Organisational Chart- Specialist technology resources
Gui
danc
e
VDA Requirement
FREE VDA 6.3 Requirements, Translation & Interpretation
Guidance
Select Project Feasibility..
The Scoring System
Project Feasibility Total & Individual Score
Innovator indicates the Red Yellow Green & NA status of
each Project Feasibility Phase
and of the
full Project Feasibility Gap Analysis
The Status of the 35 Project Feasibility Questions are identified individually.
The Project Feasibility Status is automatically displayed against the established criteria.
Results of the Project Feasibility Scoring will automatically be carried forward to the Project Feasibility Report
Corrective Actions are required against all Yellow & Red Ratings
Corrective Actions are identified against each applicable Requirement.
A brief description of intended Corrective Action can be entered against each applicable Requirement.
We suggest that you Print the Report to PDF and then Copy / Send or Print from the PDF..
ImportantPatience Please:Allow time for the Innovator to PrintConducting other actions whilst the Process Feasibility Innovator is printing may cause instability.
Ensure you have saved (with backup) prior to printing.
The PDF will by default be saved in the Internal Project Feasibility Gap Analysis Folder that the Gap Analysis resides in.
Printing
Not available for Project Feasibility
Print to PDFa COVER for the Report
To avoid naming conflicts Rename the File to indicate Cover
Printing
Not available for Project Feasibility
Print button is enabled. Select Print
Hard Copies
of the Audit Questions; Requirements; & Open Audit Questions;
can be
Printedor e-mailed
and issued to Individual Auditors
Saving
Process Feasibility Gap Analysis is FILE driven. This enables the User/s to Copy / Save / Rename unlimited copies of the Feasibility.
Note: The Folder Structure under which the FILES are saved is completely under the control of the User.
Using the Save functionwill over write your Fileand no backups will be generated.The content of these saved Files are identical.
They can be distributed, renamed, archived or deleted dependent on your specific Documentation Control requirements.If you don't require Date/Time Backups –(not a good idea)- the Innovator CAN BE SAVED USING THE NORMAL Save Function.
The File we opened was
Using the functionSave with Backup
over writes the original File and generates two additional FilesOne : with date addedTwo : with date & time added.
Select the Drop Down Menu
IMPORTANTHave patience for the Save to Activate!
The File we opened was
Using the functionSave AS
In the File Name box, enter a new name for the file.Click Save
Select the Drop Down Menu
Save As is used to rename a file or change the location of where file is located
To View our Online VDA 6.3 PROCESS AUDIT INNOVATOR DEMO
South African Contact Numbers:Tel: 0861 101 708Fax: 0861 100 288
International Contact Numbers:Tel: +(27) 748 1925Fax: +(27) 748 6656
Website: www.hoquality.comForum: www.hoquality.com/forumEmail: [email protected]