Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

29
Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar July 2008 http://www.its.dot.gov/icms/ Audio: 1-888-455-7125, passcode 1543826 Closed Captioning: http://www.fedrcc.us//Enter.aspx?EventID=1084740&Custom erID=321

description

Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar. Audio: 1-888-455-7125, passcode 1543826 Closed Captioning: http://www.fedrcc.us//Enter.aspx?EventID=1084740&CustomerID=321. July 2008 http://www.its.dot.gov/icms/. Webinar Overview. - PowerPoint PPT Presentation

Transcript of Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

Page 1: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

Welcome to the Integrated Corridor Management (ICM)Pioneer Sites Webinar

July 2008

http://www.its.dot.gov/icms/

Audio: 1-888-455-7125, passcode 1543826

Closed Captioning:

http://www.fedrcc.us//Enter.aspx?EventID=1084740&CustomerID=321

Page 2: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

2

Webinar Overview

• Webinar will last approximately 3 hours.• Webinar is being recorded – the recording will be posted online

and used as a resource to help with ICM implementation.• This webinar is designed to be interactive

– There will be an opportunity to ask questions following each presentation, and again at the end of the webinar.

– We will also solicit input from the audience to help us all understand the state of the practice across the country in this area.

• We may not be able to respond to all questions within the timeframe, but will get back to you following the webinar if your question was unanswered.

Page 3: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

3

Reminders

• All participants are in listen-only mode. The operator will provide instructions on how to ask a question over the phone.

• You may type questions into the chat area if you think of a question during the presentations.

• There will be several occasions where we will bring up multiple choice polls.– Poll responses are not anonymous – participants will not be able

to tell who responded but the webinar hosts will be able to determine who responded to each question.

• There will be several occasions where we ask open ended questions. Please type your responses into the chat area during these times. (These responses will not be anonymous).

Page 4: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

4

Agenda

1. USDOT ICM Program Overview

2. ICM Pioneer Sites’ Experiences• July 17 – Houston, Minneapolis, and San Diego• July 22 – Montgomery County and Oakland• July 24 – Dallas, San Antonio, and Seattle

3. Webinar Conclusion – ICM Q&A

Page 5: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

1. USDOT ICM Program Overview

July 17 – Dale Thompson, FHWA

July 22 – Brian Cronin, RITA

July 24 – Steve Mortensen, FTA

Page 6: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

6

1. USDOT ICM Program Overview

Contents• Purpose of the ICM Webinar• USDOT ICM Initiative Goals• Description of ICM• Eight USDOT ICM Pioneer Sites• ICM Pioneer Site Corridor Assets• ICM Program Plan• ICM Initiative—Applying Systems Engineering• ICM Analysis, Modeling, and Simulation• Next Steps• Major Milestones for 2008• ICM Knowledge and Technology Transfer• Questions

Page 7: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

7

Purpose of the ICM Pioneer Sites Webinar

The purpose of this ICM Pioneer Sites Webinar is to impart upon a broad range transportation professionals interested in ICM the concept of ICM and some of the

lessons learned in ICM initiative to date.

Page 8: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

8

USDOT ICM Initiative Aims to Deliver

• ICM systems and strategies with demonstrated value

• Analysis methodology that can be used by others

• Knowledge, resources, and proven approaches that facilitate adoption/ integration of ICM by other corridors across the country

Page 9: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

9

Corridor Networks Today

Arterial

Signal

Systems

Freeway

Systems

Bus

Systems

Rail

Systems

Page 10: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

10

Significant Congestion ICM Systems

Managing All Corridor Capacity

Tomorrow With ICM

Page 11: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

11

Seattle

OaklandSan Diego

Montgomery County

DallasSan AntonioHouston

Minneapolis

Eight USDOT ICM Pioneer Sites 3 Stages for the Pioneer Sites:

• Stage 1 – Concept of Operations, Sample Data, and System Requirements Specification

• Stage 2 – Analysis, Modeling, and Simulation• Stage 3 – Demonstration and Evaluation

Page 12: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

12

ICM Pioneer Site Corridor Assets

Page 13: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

13

Current High-Level ICM Program Plan

Phase 3: Stage 2 -Analysis, Modeling &

Simulation of Selected

Pioneer Sites

Phase 3: Stage 3 – Pioneer Demonstration

Projects

September 2005 March 2008 February 2009

De

ve

lop

me

nt

Fe

as

ibil

ity

Sit

e

Ap

pli

ca

tio

ns

Fe

as

ibil

ity

Phase 1:Foundational Research

FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 11FY 10

Sit

e

De

ve

lop

me

nt

Fe

as

ibil

ity

Phase 2: Corridor Tools, Strategies & Integration

Stakeholder Working Group

Phase 4: ICM Operations Concept Knowledge and Technology Transfer

Standards Completion and Deployment

Phase 3: Stage 1 –

ICM Pioneer Site

Concept of Operations and

System Requirements

Specification

Page 14: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

14

ICM Initiative—Applying Systems Engineering

• ICM Phase 1 (SE Phase 0): Foundational Research– Generic ICM Concept of

Operations

– ICM Implementation Guide

• ICM Phase 3 (SE Phases 1-2): Stage 1 – ICM Pioneer Site Development– Concept of Operations

– System Requirements Specification

Page 15: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

15

ICM AMS Focus: Integrated Performance Measures

Page 16: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

16

Multi-level Analysis Tools Provide Comprehensive Insight

Traffic control strategies such as ramp metering and arterial traffic signal control

Traveler information, HOT lanes, congestion pricing and regional diversion patterns

Regional patterns and mode shift; Transit analysis capability

Page 17: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

17

Next Steps

• Apply AMS tools/methods to the selected AMS Pioneer Sites to validate methods and results

• Analyze arterial data, decision support, and mode shift

• Upload Phase 2/Stage 1 Resources to Knowledgebase– Pioneer Site CONOPS and

Requirements documents and lessons-learned

– Technical Integration resources

– AMS Test Corridor documents and findings

Page 18: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

18

Major Milestones for 2008

JAN FEB MAR APR MAY JUN AUGJUL SEP OCT

Completed ICM Test Corridor Analysis

Complete

AMS Plans

for

Selected

Pioneer

Sites

Completed 8 Pioneer Site Concepts of Operations and Requirements Documents

Select up to 3 AMS Pioneer Sites

KTT Beginning (Knowledgebase Uploads, Newsletters, Email List, Webinars/Workshops, Presentations, Peer Exchanges, Publications, and more.)

Page 19: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

19

ICM Knowledge and Technology Transferhttp://www.its.dot.gov/icms/

• Resources Available Now in the ICM Knowledgebase:– Foundational Research

Documents

– Pioneer Site ConOps and Requirements Documents

– Technical Integration/Data Gap Technical Resources

– AMS Resources and Findings

– Fact Sheets

– ICM Newsletter

– Trade Journal Articles

Page 20: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

20

ICM Knowledge and Technology Transferhttp://www.its.dot.gov/icms/

• KTT Resources Coming Soon:– Pioneer Site Webinars– New Fact Sheets – Conferences and Peer-to-Peer

Exchanges– Lessons-Learned from ICM

Pioneer Sites– Updated Resource Guidance

Documents

Page 21: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

21

Contacts

• Brian Cronin, RITA [email protected]

• Steve Mortensen, [email protected]

• Dale Thompson, FHWA [email protected]

ICM Web Site:

http://www.its.dot.gov/icms/

Page 22: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

22

QUESTIONS?

Page 23: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

23

Audience Poll!

• Please use the poll and chat windows to answer these questions:– What corridors in your area might be feasible candidates for

implementing ICM? – For the corridor in your area that you are most familiar with, what

phase of ICM implementation are you currently in?– If you are not planning on implementing ICM, why not? – If you are implementing ICM, what types of corridor level

performance measures have you identified?

       

Page 24: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

2. ICM Pioneer Sites’ Experiences

July 17 – Houston, Minneapolis, and San Diego

July 22 – Montgomery County and Oakland

July 24 – Dallas, San Antonio, and Seattle

Page 25: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

25

2. ICM Pioneer Sites’ Experiences

Contents• Operational:

– Why our Site needs ICM– How ICM will help our Site

• Institutional: – Who are our ICM Stakeholders– How our Site defined Roles and achieved Buy-in among ICM

Stakeholders

• Technical: – What our proposed ICMS will look like– How our ICMS will facilitate ICM

• Lessons Learned

Page 26: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

3. Webinar Conclusion – ICM Q&A

General Discussion

Page 27: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

27

QUESTIONS?

• For the USDOT

• For the Pioneer Sites

Page 28: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

28

Audience Poll!

• Please use the poll and chat areas to respond:– Rank the level of usefulness of the ICM website and

Knowledgebase if you have used it.– What types of ICM knowledge and technology transfer materials

would be useful to you? – Would you like to be added to the ICM Newsletter email list?– Are you interested in supporting the DOT ICM Program as an

ICM Stakeholder Workgroup participant?  As a stakeholder workgroup participant, you will participate in general and technical ICM Program discussion topics that provide DOT with ICM Program guidance and resolution of technical issues. 

Page 29: Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar

29

Thank You

• Brian Cronin, RITA [email protected]

• Steve Mortensen, [email protected]

• Dale Thompson, FHWA [email protected]

ICM Web Site:

http://www.its.dot.gov/icms/