Welcome to the CME Project Meeting 2013
description
Transcript of Welcome to the CME Project Meeting 2013
![Page 1: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/1.jpg)
Welcome to the
CME Project Meeting 2013
Philip J. MaechlingInformation Technology Architect
Southern California Earthquake Center
![Page 2: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/2.jpg)
Computational Seismic Hazard Data Products
There are several existing seismological data products currently used by non-seismological groups.
1.Earthquake early warning ground motion alerts
– (Used by: Public in Japan, Mexico, Turkey)
2.Scenario earthquake peak ground motion estimates
– (Used by: Emergency response planners, building engineers, insurance companies in loss estimates)
3.Scenario broadband seismograms
– (Used by: Building engineers including energy production companies)
4.Probabilistic forecast of peak ground motions in decades to centuries
– (Used by: Building code developers, insurance companies in loss estimates)
Each of these computational data products represents an interface between seismological researcher and important external non-seismological users. The CME group integrates new SCEC computational science advances with scientific software and high performance computing to improve these broad impact data products.
2
![Page 3: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/3.jpg)
http://www.shakealert.org
![Page 4: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/4.jpg)
We will operate the CISN ShakeAlert Display system during meeting in room.
ShakeAlert User Display is configured with:
Location: Palm Springs Hilton (33.824,-116.543)Warning above Min Magnitude: 3.0Warning above Intensity Level: 1.0
ShakeAlert System In Room
![Page 5: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/5.jpg)
![Page 6: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/6.jpg)
Agenda for SCEC CME Meeting (v5.28.2013)
Session 1: Broadband Platform
09:30-10:00 Broadband Platform BBP Developments (F. Silva)
10:00-10:30 Future Broadband Use and Development (C. Goulet/R. Graves)
Session 2: High-F
10:30-11:00 Hercules (J. Bielak/R. Taborda)
11:00-11:30 Dynamic Ruptures (S. Day)
11:30-12:00 Nonlinear/plastic effects and s/s heterogeneities (K. Olsen)
12:00-12:30 AWP Code Developments (Y. Cui)
12:30-13:00 Lunch Break
Session 3: Ground Motion Simulation Validation and Utilization
13:00-13:30 GMSV and Utilization Simulations (N. Luco)
Session 4: CyberShake
13:30-13:50 CyberShake Study 13.4 (R. Graves/K. Olsen)
13:50-14:10 Averaging-based Factorization (F. Wang)
14:10-14:30 Future CyberShake (T. Jordan)
Session 5: Geoinformatics
14:30-15:00 CVM-S Inversions (E. Lee)
15:00-15:30 CVM-H Developments and Plans (J. Shaw)
15:30-16:00 Break
Session 6: CME Planning 2014
16:00-16:30 CME Project and Allocation Overview (P. Maechling)
16:30-17:30 Comp Research and Allocation Planning (T. Jordan)
17:30 Adjourn
![Page 7: Welcome to the CME Project Meeting 2013](https://reader036.fdocuments.in/reader036/viewer/2022062409/56814c58550346895db977a8/html5/thumbnails/7.jpg)
Agenda for SCEC CME Meeting (v5.28.2013)
Session 1: Broadband Platform
09:30-10:00 Broadband Platform BBP Developments (F. Silva)
10:00-10:30 Future Broadband Use and Development (C. Goulet/R. Graves)
Session 2: High-F
10:30-11:00 Hercules (J. Bielak/R. Taborda)
11:00-11:30 Dynamic Ruptures (S. Day)
11:30-12:00 Nonlinear/plastic effects and s/s heterogeneities (K. Olsen)
12:00-12:30 AWP Code Developments (Y. Cui)
12:30-13:00 Lunch Break
Session 3: Ground Motion Simulation Validation and Utilization
13:00-13:30 GMSV and Utilization Simulations (N. Luco)
Session 4: CyberShake
13:30-13:50 CyberShake Study 13.4 (R. Graves/K. Olsen)
13:50-14:10 Averaging-based Factorization (F. Wang)
14:10-14:30 Future CyberShake (T. Jordan)
Session 5: Geoinformatics
14:30-15:00 CVM-S Inversions (E. Lee)
15:00-15:30 CVM-H Developments and Plans (J. Shaw)
15:30-16:00 Break
Session 6: CME Planning 2014
16:00-16:30 CME Project and Allocation Overview (P. Maechling)
16:30-17:30 Comp Research and Allocation Planning (T. Jordan)
17:30 Adjourn