Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier...
Transcript of Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier...
![Page 1: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/1.jpg)
![Page 2: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/2.jpg)
Welcome to Teko MiningA word of the owner
Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from the beginning of 2014 my investments are focused on the real sector and on the production of basic construction materials.
I have decided to invest in Serbia again for many reasons. First of all, my presence and cooperation with the economy of this region lasts for a very long time. Over the years, experience has shown that the business environment, which consists primarily of people, is extremely open to successful cooperation and provides excellent conditions for achieving economic interests and goals.
Investing in Serbia has been beginning in 2014, where Teko Mining GmbH and I as its owner, have invested in the following quarries:
Ljubovija – quarry „Krš“
Batočina – quarry „Gradac“
Petrovac na Mlavi – quarry „Ladne vode“
Ćeramide – quarry „Ćeramide" at Rudnik
Vinča (asphalt basis) in Belgrade
Lapišnica – quarry at Republika Srpska
All these quarries, since the beginning of 2014, operate under the name Teko Mining. The total area of all these quarries is over 340 hectares, and total exploitation of stone reserves is in the amount of about 240 million tons.
Teko Mining is one of the largest private companies which producing various types of stone materials for needs of development and construction of infrastructure in Serbia. Our production capacity is about 3 million tons annually, and we are able to satisfy most of the market needs in terms of quality, quantity and delivery dynamics.
The total number of employees is 161 workers with salary above the average of the economy. All salaries are paid regularly and also are properly paid all legal obligations towards the state.
In order to improve production performance and quality of production, we gradually invest in replacing existing production equipment with a new, technically more modern.
Our business partners are private and public companies such as: Serbian Railways, Public utility road companies, Contractors on corridors X and XI and on the other roads in Serbia, as well as in other areas where the material, which we produce, are used.
We have a future vision of our development both in the territory of Serbia and in the region, and our commitment is to stay in Serbia for many years, to develop our business orientation and to adapt on the needs of the markets in Serbia and the region.
YoursHelena Aluta-Oltyan
![Page 3: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/3.jpg)
Organizational structureTeko Mining
TEK
O M
ININ
G G
mb
H,
Gra
z
Ass
em
bly
He
len
a A
luta
-Oltya
n
He
len
a A
luta
-Oltya
nM
ojc
a R
iep
l
PR
OD
UC
TIO
NFI
NA
NC
E A
ND
SA
LES
Asf
altn
a b
aza
Vin
ča
Pe
tro
va
c
na
Mla
vi
ĆER
AM
IDE
Lju
bo
vija
Str
aže
vic
a,
Ba
toč
ina
TEK
O M
ININ
G
LAP
IŠN
ICA
d.o
.o.
Ma
na
ge
r o
f th
e w
ork
un
it
Željk
o D
rag
ov
ićR
ad
ojk
o S
tan
čić
Ra
diš
a G
rujić
De
jan
Pa
vlo
vić
N
iko
la H
rnje
z
Uro
š V
elji
ć,
dire
cto
rZo
ran
Mili
će
vić
, d
ire
cto
r
Sa
les
dire
cto
r
Mila
din
Ra
nko
vić
Fin
an
ce
an
d A
cc
ou
ntin
g
He
ad
of Fi
na
nc
ial
an
d A
cc
ou
ntin
g A
ffa
irs
Milk
a S
pa
sić
Dire
cto
rs
He
len
a A
luta
-Oltya
n
De
jan
Mu
rko
Pe
ter
Sim
on
čić
Su
pe
rvis
ory
Bo
ard
Uro
š V
elji
ć, G
en
era
l Ma
na
ge
rB
ora
n K
erim
, C
FOŽe
ljko
Dra
go
vić
, D
ire
cto
r
TEK
O M
ININ
G d
.o.o
. B
elg
rad
e
Ma
na
ge
r o
f th
e w
ork
un
itM
an
ag
er
of th
e w
ork
un
itM
an
ag
er
of th
e w
ork
un
itM
an
ag
er
of
the
wo
rk u
nit
![Page 4: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/4.jpg)
Production capacitiesBy quarries
Bearing in mind the total area of quarries, exploitation and total reserves, as well as the capacities of
available equipment and machinery, our quarries are able to produce 3,000,000 tons of stone
annually.
The production is dimensioned depending on the market needs.
The quarries where the exploitation of stone of eruptive origin is done are:• Krš, Ljubovija• Ćeramide, Rudnik
Quarries where the exploitation of stone of limestone orgin is done are:• Gradac, Batočina• Ladne Vode, Petrovac na Mlavi• Lapišnica, Istočno Sarajevo
Locations of quarries
SERBIA
Quarries – eruptive stone:
Krš, Ljubovija▌
Ćeramide, Rudnik▌
Quarries – limestone stone:
Gradac, Batočina▌
Ladne Vode, Petrovac na Mlavi▌
Asphalt basis
AB Vinča▌
Stone gravel:
Kovin▌
BOSNIA AND HERZEGOVINA
Quarries – limestone stone:
Lapišnica▌
Kamenolomieruptivni kamen
Kamenolomikrečnjački kamen
Šljunkara
Asfaltna baza
![Page 5: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/5.jpg)
Quarry Krš, Ljubovija
Quarry
![Page 6: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/6.jpg)
The surface mine Krš is located near Ljubovija and its site of a technical stone dacite, is eruptive origin. This quarry has been active since 1954, and by 1968, it produced only a cut cube for the roads at that time. Since 1968, it has begun to produce asphalt aggregates.
The quarry has privatized in 2002, and in 2004, a modern new Metso Minerals plant was installed, with a capacity of 500,000 tons annually for all fractions.
Since 2014, the owner of PK Krš is Teko Mining Belgrade.
The Teko Mining owns its own laboratory, which carries out internal stone tests, while ofcial quality reports are issued by accredited laboratories in Serbia. For all the fractions that are produced, we have the appropriate reports.
The largest use of aggregates of this stone, exceptional hardness and quality, have in the construction of roads as asphalt mixtures or bearing layers of roads structure, and also used for railway.
Annual production:over 250.000 t
Total reserve:13.000.000 t
▌ Stone aggregate 0-2 mm
Stone aggregate 2-4 mm▌
Stone aggregate 4-8 mm▌
Stone aggregate 8-11 mm▌
Stone aggregate 8-16 mm▌
Stone aggregate 11-16 mm▌
Stone aggregate 16-22 mm▌
Stone aggregate 16-31.5 mm▌
Ballast 31.5-63 mm▌
Stone aggregate 0-31.5 mm - tampon▌
Stone aggregate 0-63 mm - tampon▌
Crashed stone granite – not granulated ▌
Altered stone mixed with the ground ▌
BASIC PRODUCTS
![Page 7: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/7.jpg)
Quarry Ćeramide, Rudnik
Quarry
![Page 8: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/8.jpg)
On the mountain Rudnik there is a quarry Ceramide of eruptive stone, dacite, most often used in the construction of supporting layers of roads and highways structures, as well as for civil engineering and building construction.
In addition to these purposes, the eruptive stone can also be used for the construction of coastal pipelines, regulation of watercourses, construction of hydraulic structures, gabions and for other purposes.
Fractions produced at Ćeramide quarry have attests from accredited laboratory. The quarry was opened in 2007.
At the Ćeramide quarry is installed a combined crushing plant of renowned world known manufacturers KRUPP and METSO MINERALS, capacity of over 300 t / h.
▌ Stone aggregate 0-31.5 mm - tampon
Stone aggregate 31-63 mm▌
Stone aggregate 0-63 mm - tampon▌
Stone aggregate 0-2 mm▌
Stone aggregate 0-4 mm▌
Stone aggregate 2-4 mm▌
Stone aggregate 4-8 mm▌
Stone aggregate 8-11 mm▌
Stone aggregate 11-16 mm▌
Stone aggregate 16-22 mm▌
Stone aggregate 0-220 mm▌
Stone aggregate 0-400 mm▌
Stone aggregate 0-80 mm▌
Stone aggregate 0-100 mm ▌
BASIC PRODUCTS
Annual production:approximately 400.000 t
Total reserve:stone 6.000.000 t
![Page 9: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/9.jpg)
Quarry Gradac, Batočina
Quarry
![Page 10: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/10.jpg)
Quarry Gradac is located near Batocina, nearby highway E-75. The quarry is used for the exploitation of stone dolomite marble, limestone origin, which has wide application in road economy, especially for the construction of roads and highways, lower bearing constructions of bituminous materials in warm process for all types of trafc loads, as well as for production of wearing layers on roads with medium light and very light trafc load. It can also be used for production of cement concrete, including concrete exposed to wear and erosion. Stone from quarry Gradac is also used in building construction, as well as for the construction of coastal pipelines, watercourse regulation, and the construction of hydraulic structures, gabions and other.The stone fraction 31.5 - 63 mm is used as category II, for the production of railway ballast.For all products, fractions, tampons, ballast and ler, which are produced on the quarry in Batočina, we have certicates from accredited laboratory.The quarry has been active since 1952. Since June 2018, a new METSO plant has been installed, whose capacities are 330 t / h of the primary part of the plant and 220 t / h of the secondary part of the plant.
▌ Filer - stone our in bulk
Stone aggregate 0-2 mm▌
Stone aggregate 0-4 mm▌
Stone aggregate 2-4 mm▌
Stone aggregate 4-8 mm▌
Stone aggregate 8-11 mm▌
Stone aggregate 11-16 mm▌
Stone aggregate 16-22 mm▌
Stone aggregate 16-31.5 mm▌
Aggregate 0-31.5 mm - tampon▌
Aggregate 0-8 mm▌
Aggregate 0-16 mm▌
Mechanical tampon 0-63 mm▌
Mechanical tampon 0-63 mm▌
Ballast 31.5-63 mm▌
Ballast 63-120 mm▌
Crashed stone - not granulated▌
Schist - not granulated ▌
BASIC PRODUCTS
Annual production:approximately 1.400.000 t
Total reserve:60.000.000 t
![Page 11: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/11.jpg)
Quarry Ladne vode, Petrovac na Mlavi
Quarry
![Page 12: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/12.jpg)
The "Ledne vode" quarry is located on the regional road, on 15 km from Petrovac to Žagubica, at the entrance to canyon Gornjačka. The stone that is being exploited is a dolomitized limestone.The primary use of this type of stone is for production of asphalt and concrete fractions, road tampons, stone for construction (civil engineering, building construction) and for all types of hydraulic structures.Accredited laboratories issue certicates for materials produced on quarry, based on tests carried out periodically in accordance with applicable regulations in the Republic of Serbia.Quarry has been active since 1947.Basic mobile equipment on quarry are - Atlas Copco ROC L6 drill machine, CAT 336 DLN ME and CAT 330 DL hydraulic excavators and CAT 980H loader.
Plants for the preparation of mineral materials at quarry are: • Primary (clover) crusher METSO LOKOTRACK 110 (LT 110)• Secondary (impact rotary) crusher KLEEMANN SHB 12-90• Tertiary (cone) crusher METSO HP-100 (sieve METSO CVB 2060)
▌ Stone aggregate 0-4 mm
Stone aggregate 4-8 mm▌
Stone aggregate 8-11 mm▌
Stone aggregate 8-16 mm▌
Stone aggregate 16-22 mm▌
Stone aggregate 16-31.5 mm▌
Stone aggregate 0-31.5 mm▌
Stone aggregate 31.5-63 mm▌
Mechanical tampon 0-63 mm▌
Crashed stone - not granulated▌
Crashed stone - granulated▌
Mechanical tampon II class▌
Stone aggregate 0-120 mm▌
Stone aggregate 63-120 mm▌
BASIC PRODUCTS
Annual production:approximately 230.000 t
Total reserve:approximately 4.100.000 t
![Page 13: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/13.jpg)
Asphalt base, VinčaAsphalt base
![Page 14: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/14.jpg)
The Vinča asphalt base is located in the municipality Grocka, 2 km from Smederevo road and 10 km from Belgrade, and nearby of the E 75 - Belgrade-Nis highway, which is part of the European Corridor 10.
The BENNINGHOVEN asphalt base with 12 hot bunkers, completely digitized and computerized, with a capacity of 240 t/h, which ranks it in the line of major asphalt bases, by capacities, in Serbia, as well as one of 3 in Europe that can simultaneously produce asphalt of eruptive and of limestone origin.
▌ Asphalt concrete: АВ 4 k, АВ 8 k, АВ 11 k, АВ 16 k
Bit bearing layer: BNS 22, BNS 32▌
Bit bearing wearing layer: BNHS 16▌
Eruptive asphalt concretes: АВ 8 s, АВ 11 s, АВ 16 s,▌
Eruptive asphalt concrete with polymers: АВ 11 s with РтВ▌
Asphalt in colour (red)▌
Drainage asphalt▌
SMA asphalt▌
BASIC PRODUCTS
Capacity of asphalt base is 240 t/h
![Page 15: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/15.jpg)
Quarry Lapišnica, Eastern Sarajevo
Quarry
![Page 16: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/16.jpg)
Quarry Lapišnica is located in Bosnia and Herzegovina in Eastern Sarajevo.
The stone that is being exploited in Lapišnica is of limestone origin and is used mostly for infrastructure projects for production of asphalt, concrete production, and there is also a possibility of use in the chemical industry and pharmaceutical production.
Reports on the quality of stone, as well as in Serbia based on material testing, are issued by accredited laboratory. Quarry Lapišnica has certicates of factory production control, and that is for concrete aggregate, fractions 0/4, 4/8, 8/11, 11/16 mm in accordance with BAS-EN 12260 + A1: 2009, as well as certicate BAS EN-13340 for asphalt.
The quarry has started with work in 2006. The crushing plant of METSO MINERALS producer has a stone processing capacity of 500 t/h.
▌ Filer
Fraction 0-2 mm▌
Fraction 0-4 mm▌
Fraction 2-4 mm▌
Fraction 4-8 mm▌
Fraction 8-11 mm▌
Fraction 11-16 mm▌
Fraction 16-22 mm▌
Fraction 22-31.5 mm▌
Mixed fraction (0-16, 0-32, 0-60)▌
Fraction 8-16 mm▌
Fraction 16-32 mm▌
Fraction 32-63 mm▌
Separated tampon▌
Crashed stone▌
Fraction 50-300 mm•
Bulk material •
BASIC PRODUCTS
Annual production:approximately 800.000 t
Total reserves:117.348.898 t
![Page 17: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/17.jpg)
EquipmentTeko Mining
![Page 18: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/18.jpg)
Mechanisation of Teko Mining consists of 64 mobile units which
are: excavators, loaders, dumpers, drilling machines, etc.
Special attention is paid to timely preventive maintenance.
Stone production and processing plants consist of primary,
secondary and tertiary crushers, as well as system for screening of
the manufacturer METSO MINERALS AND KRUPP.
In Batocina, we also have a mill for production of ler, which
works 24/7, and on which we receive a rst class ler.
Particular attention is being paid to crushing plants, in order to
ensure a consistently high quality of the output product. These
plants are capable to produce and to clean stone for all types of
works in the construction industry.
Teko Mining possess and two mobile crushing plants SANDVIK
and METSO MINERALS.
Vinča asphalt base is one of the newest in this region, capable to
deliver at the same time asphalts with eruptive and asphalts with
limestone fractions, because it has twelve hot bunkers which
makes it unique in Serbia. It owns a system for recycled asphalt in
colour. It is fully in capsule and has capacity of 240 t/h.
![Page 19: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/19.jpg)
Quality system of productsTeko Mining
![Page 20: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/20.jpg)
All business activities are in line with current standards and
customer comments are very rare on the quality of nished
products.
Human resources management is done through continuous
monitoring of employees' work, through training and
development.
Teko Mining is committed to identify and full requirements of all
internal and external customers of our products and services.
Customer satisfaction is achieved through the continuous
improvement of the quality of the products that contribute to the
process and by the efforts of employees. All conditions necessary
in this process are provided: resources, work environment,
training and continuous alignment with the requirements of the
Integrated Management System.
The quality management system is effectively applied and
enhanced to imply continuous improvement of product quality
in Teko Mining, which improves cooperation with customers.
Integrated Management System
The qual i ty management sys tem, the
environmental management system and the
safety and health at work are in accordance
with the requirements of the standards: SRPS ISO
9001: 2015, SRPS ISO 14001: 2015, SRPS ISO 18001:
2008 for eld of production and sales of stone
aggregates and asphalt mixtures.
![Page 21: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/21.jpg)
Safety and Health at WorkTeko Mining
![Page 22: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/22.jpg)
The quarries possess the appropriate technical documentation
and all the necessary approvals for the exploitation and
performance of mining works.
The validity of machines and equipment is regularly checked,
which is conrmed by the Professional Findings of machinery and
equipment for safe work, and all employees that are working at
an increased risk workplace are trained to perform their tasks
safely.
Protective equipment used for personal protection has
appropriate quality certicates. For the execution of mining
works on all quarries, the services of external companies are
used. The risk assessment act was made according to the valid
systematization for all workplaces in the company.
At Vinca asphalt base production is done by using preventive
measures for safe and health work, monitoring on environmental
impacts is carried out in order to reduce them.
![Page 23: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/23.jpg)
Environmental ProtectionTeko Mining
![Page 24: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/24.jpg)
Implementation of environmental measures in Teko Mining is a
high priority. The compliance of Teko Mining with the laws and
regulations in the eld of environmental protection has been
carried out.
Based on identied environmental aspects, analysis of potential
accident cases, analysis of types and quantities of generated
waste, analysis of monitoring reports and on the basis of
achieved goals in the previous year, the environmental goals for
the next period are proposed with the goal to:
• Reduce the amount of hazardous waste that is generated
• Reduce the resources spent in performing activities
• Monitor the inuences and thus complete control is
achieved
• Improve the employees' attitudes constantly and increase
of ecological awareness among all employees
![Page 25: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/25.jpg)
Business resultsTeko Mining
![Page 26: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/26.jpg)
New owner of the company took measures in order to restructure
the organization of business, all with the goal of achieving
positive business results.
The company operates protable and nancing of current
production is largely ensured from its own working capital, with
minimal use of bank loans. From year to year investments in
equipment were growing, so in 2018 the total investment was 6
million euros.
Placement of products which are produced in quarries
operating within Teko Mining is carried out on the local market,
on the territory of the Republic of Serbia and Bosnia and
Herzegovina.
Teko Mining is a medium-sized company and annual nancial
statements have been conrmed by “the Moore Stephens”
audit company, and consolidated balance sheet at Teko Mining
GmbH by the BDO Group.
The main application the products have in the construction and
maintenance of roads and highways, as well as railways, water
management facilities, electric power industry and other
infrastructure areas.
In addition to major infrastructure projects, a signicant amount
of products is being distributed through local government
bodies, especially public companies involved in the
maintenance of local road infrastructure, so a large number of
our customers are public companies in the municipalities where
our quarries are located, as well as the municipalities and in their
surround.
![Page 27: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/27.jpg)
The largest customers
▌ RŽD International
Strabag▌
TE Nikola Tesla Obrenovac▌
Tehnogradnja doo Kruševac▌
PZP Kragujevac▌
Trace (PZP Niš i PZP Vranje)▌
JKP Beograd Put▌
Infrastruktura Železnice Srbije▌
Neimar put Salakovac▌
PZP Požarevac▌
Autotransport Kostolac▌
Vodoprivredno preduzeće Požarevac▌
PZP Beograd▌
Energoprojekt niskogradnja▌
MGBH d.o.o. Sarajevo▌
MIBRAL d.o.o. Sarajevo▌
EURO-ASFALT d.o.o. Sarajevo▌
Planum▌
Jugokop▌
Bauwesen▌
AR Gradnja▌
Srbijaautoput▌
JKP ŠUMADIJA Kragujevac▌
Ingrapomni▌
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION▌
China rail▌
Arbag▌
Milmar put▌
Novi Pazar put▌
Put Invest▌
Amiga▌
Elita Cop▌
Izoteks▌
Teko Mining
![Page 28: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/28.jpg)
Locations and contacts
Austria
Teko Mining GmbHKarl Maria von Weber-Gasse 6A-8010 GrazAUSTRIAE-mail: [email protected]
Serbia
Teko Mining d.o.o Milentija Popovića 5v, 11070 Novi BeogradE-mail: [email protected] Telephone: +381 11 413 7000
Quarry BatočinaKneza Miloša Obrenovića 28, 34 227 BatočinaContact person: Zlatko IvanovićTelephone: +381 69 654 725
Quarry Krš, LjubovijaVojvode Mišića BB, 15 320 LjubovijaContact person: Radojko StančićTelephone: +381 69 654 881
Quarry Ladne vode,Petrovac na MlaviMlavska 18,12 300 PetrovacContact person: Dejan PavlovićTelephone: +381 69 654 799
Asphalt base VinčaBeogradska 246, Grocka11 351 VincaContact person: Radiša GrujićTelephone: +381 69 654 708
Quarry ĆeramideZagrađe BB32 314 ZagrađeContact person: Nikola HrnjezTelephone: +381 69 654 884
Bosnia and Herzegovina
Teko Mining Lapišnica d.o.o.Lapišnica bb,71 144 Istočni Stari Grad Eastern SarajevoE-mail: [email protected] Telephone: 00 387 33 23 79 02
Teko Mining
![Page 29: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from](https://reader033.fdocuments.in/reader033/viewer/2022041911/5e677f299605a70e1a4aac9c/html5/thumbnails/29.jpg)
www.tekomining.com