Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier...

29

Transcript of Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier...

Page 1: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from
Page 2: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Welcome to Teko MiningA word of the owner

Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from the beginning of 2014 my investments are focused on the real sector and on the production of basic construction materials.

I have decided to invest in Serbia again for many reasons. First of all, my presence and cooperation with the economy of this region lasts for a very long time. Over the years, experience has shown that the business environment, which consists primarily of people, is extremely open to successful cooperation and provides excellent conditions for achieving economic interests and goals.

Investing in Serbia has been beginning in 2014, where Teko Mining GmbH and I as its owner, have invested in the following quarries:

Ljubovija – quarry „Krš“

Batočina – quarry „Gradac“

Petrovac na Mlavi – quarry „Ladne vode“

Ćeramide – quarry „Ćeramide" at Rudnik

Vinča (asphalt basis) in Belgrade

Lapišnica – quarry at Republika Srpska

All these quarries, since the beginning of 2014, operate under the name Teko Mining. The total area of all these quarries is over 340 hectares, and total exploitation of stone reserves is in the amount of about 240 million tons.

Teko Mining is one of the largest private companies which producing various types of stone materials for needs of development and construction of infrastructure in Serbia. Our production capacity is about 3 million tons annually, and we are able to satisfy most of the market needs in terms of quality, quantity and delivery dynamics.

The total number of employees is 161 workers with salary above the average of the economy. All salaries are paid regularly and also are properly paid all legal obligations towards the state.

In order to improve production performance and quality of production, we gradually invest in replacing existing production equipment with a new, technically more modern.

Our business partners are private and public companies such as: Serbian Railways, Public utility road companies, Contractors on corridors X and XI and on the other roads in Serbia, as well as in other areas where the material, which we produce, are used.

We have a future vision of our development both in the territory of Serbia and in the region, and our commitment is to stay in Serbia for many years, to develop our business orientation and to adapt on the needs of the markets in Serbia and the region.

YoursHelena Aluta-Oltyan

Page 3: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Organizational structureTeko Mining

TEK

O M

ININ

G G

mb

H,

Gra

z

Ass

em

bly

He

len

a A

luta

-Oltya

n

He

len

a A

luta

-Oltya

nM

ojc

a R

iep

l

PR

OD

UC

TIO

NFI

NA

NC

E A

ND

SA

LES

Asf

altn

a b

aza

Vin

ča

Pe

tro

va

c

na

Mla

vi

ĆER

AM

IDE

Lju

bo

vija

Str

aže

vic

a,

Ba

toč

ina

TEK

O M

ININ

G

LAP

IŠN

ICA

d.o

.o.

Ma

na

ge

r o

f th

e w

ork

un

it

Željk

o D

rag

ov

ićR

ad

ojk

o S

tan

čić

Ra

diš

a G

rujić

De

jan

Pa

vlo

vić

N

iko

la H

rnje

z

Uro

š V

elji

ć,

dire

cto

rZo

ran

Mili

će

vić

, d

ire

cto

r

Sa

les

dire

cto

r

Mila

din

Ra

nko

vić

Fin

an

ce

an

d A

cc

ou

ntin

g

He

ad

of Fi

na

nc

ial

an

d A

cc

ou

ntin

g A

ffa

irs

Milk

a S

pa

sić

Dire

cto

rs

He

len

a A

luta

-Oltya

n

De

jan

Mu

rko

Pe

ter

Sim

on

čić

Su

pe

rvis

ory

Bo

ard

Uro

š V

elji

ć, G

en

era

l Ma

na

ge

rB

ora

n K

erim

, C

FOŽe

ljko

Dra

go

vić

, D

ire

cto

r

TEK

O M

ININ

G d

.o.o

. B

elg

rad

e

Ma

na

ge

r o

f th

e w

ork

un

itM

an

ag

er

of th

e w

ork

un

itM

an

ag

er

of th

e w

ork

un

itM

an

ag

er

of

the

wo

rk u

nit

Page 4: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Production capacitiesBy quarries

Bearing in mind the total area of quarries, exploitation and total reserves, as well as the capacities of

available equipment and machinery, our quarries are able to produce 3,000,000 tons of stone

annually.

The production is dimensioned depending on the market needs.

The quarries where the exploitation of stone of eruptive origin is done are:• Krš, Ljubovija• Ćeramide, Rudnik

Quarries where the exploitation of stone of limestone orgin is done are:• Gradac, Batočina• Ladne Vode, Petrovac na Mlavi• Lapišnica, Istočno Sarajevo

Locations of quarries

SERBIA

Quarries – eruptive stone:

Krš, Ljubovija▌

Ćeramide, Rudnik▌

Quarries – limestone stone:

Gradac, Batočina▌

Ladne Vode, Petrovac na Mlavi▌

Asphalt basis

AB Vinča▌

Stone gravel:

Kovin▌

BOSNIA AND HERZEGOVINA

Quarries – limestone stone:

Lapišnica▌

Kamenolomieruptivni kamen

Kamenolomikrečnjački kamen

Šljunkara

Asfaltna baza

Page 5: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Krš, Ljubovija

Quarry

Page 6: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

The surface mine Krš is located near Ljubovija and its site of a technical stone dacite, is eruptive origin. This quarry has been active since 1954, and by 1968, it produced only a cut cube for the roads at that time. Since 1968, it has begun to produce asphalt aggregates.

The quarry has privatized in 2002, and in 2004, a modern new Metso Minerals plant was installed, with a capacity of 500,000 tons annually for all fractions.

Since 2014, the owner of PK Krš is Teko Mining Belgrade.

The Teko Mining owns its own laboratory, which carries out internal stone tests, while ofcial quality reports are issued by accredited laboratories in Serbia. For all the fractions that are produced, we have the appropriate reports.

The largest use of aggregates of this stone, exceptional hardness and quality, have in the construction of roads as asphalt mixtures or bearing layers of roads structure, and also used for railway.

Annual production:over 250.000 t

Total reserve:13.000.000 t

▌ Stone aggregate 0-2 mm

Stone aggregate 2-4 mm▌

Stone aggregate 4-8 mm▌

Stone aggregate 8-11 mm▌

Stone aggregate 8-16 mm▌

Stone aggregate 11-16 mm▌

Stone aggregate 16-22 mm▌

Stone aggregate 16-31.5 mm▌

Ballast 31.5-63 mm▌

Stone aggregate 0-31.5 mm - tampon▌

Stone aggregate 0-63 mm - tampon▌

Crashed stone granite – not granulated ▌

Altered stone mixed with the ground ▌

BASIC PRODUCTS

Page 7: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Ćeramide, Rudnik

Quarry

Page 8: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

On the mountain Rudnik there is a quarry Ceramide of eruptive stone, dacite, most often used in the construction of supporting layers of roads and highways structures, as well as for civil engineering and building construction.

In addition to these purposes, the eruptive stone can also be used for the construction of coastal pipelines, regulation of watercourses, construction of hydraulic structures, gabions and for other purposes.

Fractions produced at Ćeramide quarry have attests from accredited laboratory. The quarry was opened in 2007.

At the Ćeramide quarry is installed a combined crushing plant of renowned world known manufacturers KRUPP and METSO MINERALS, capacity of over 300 t / h.

▌ Stone aggregate 0-31.5 mm - tampon

Stone aggregate 31-63 mm▌

Stone aggregate 0-63 mm - tampon▌

Stone aggregate 0-2 mm▌

Stone aggregate 0-4 mm▌

Stone aggregate 2-4 mm▌

Stone aggregate 4-8 mm▌

Stone aggregate 8-11 mm▌

Stone aggregate 11-16 mm▌

Stone aggregate 16-22 mm▌

Stone aggregate 0-220 mm▌

Stone aggregate 0-400 mm▌

Stone aggregate 0-80 mm▌

Stone aggregate 0-100 mm ▌

BASIC PRODUCTS

Annual production:approximately 400.000 t

Total reserve:stone 6.000.000 t

Page 9: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Gradac, Batočina

Quarry

Page 10: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Gradac is located near Batocina, nearby highway E-75. The quarry is used for the exploitation of stone dolomite marble, limestone origin, which has wide application in road economy, especially for the construction of roads and highways, lower bearing constructions of bituminous materials in warm process for all types of trafc loads, as well as for production of wearing layers on roads with medium light and very light trafc load. It can also be used for production of cement concrete, including concrete exposed to wear and erosion. Stone from quarry Gradac is also used in building construction, as well as for the construction of coastal pipelines, watercourse regulation, and the construction of hydraulic structures, gabions and other.The stone fraction 31.5 - 63 mm is used as category II, for the production of railway ballast.For all products, fractions, tampons, ballast and ler, which are produced on the quarry in Batočina, we have certicates from accredited laboratory.The quarry has been active since 1952. Since June 2018, a new METSO plant has been installed, whose capacities are 330 t / h of the primary part of the plant and 220 t / h of the secondary part of the plant.

▌ Filer - stone our in bulk

Stone aggregate 0-2 mm▌

Stone aggregate 0-4 mm▌

Stone aggregate 2-4 mm▌

Stone aggregate 4-8 mm▌

Stone aggregate 8-11 mm▌

Stone aggregate 11-16 mm▌

Stone aggregate 16-22 mm▌

Stone aggregate 16-31.5 mm▌

Aggregate 0-31.5 mm - tampon▌

Aggregate 0-8 mm▌

Aggregate 0-16 mm▌

Mechanical tampon 0-63 mm▌

Mechanical tampon 0-63 mm▌

Ballast 31.5-63 mm▌

Ballast 63-120 mm▌

Crashed stone - not granulated▌

Schist - not granulated ▌

BASIC PRODUCTS

Annual production:approximately 1.400.000 t

Total reserve:60.000.000 t

Page 11: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Ladne vode, Petrovac na Mlavi

Quarry

Page 12: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

The "Ledne vode" quarry is located on the regional road, on 15 km from Petrovac to Žagubica, at the entrance to canyon Gornjačka. The stone that is being exploited is a dolomitized limestone.The primary use of this type of stone is for production of asphalt and concrete fractions, road tampons, stone for construction (civil engineering, building construction) and for all types of hydraulic structures.Accredited laboratories issue certicates for materials produced on quarry, based on tests carried out periodically in accordance with applicable regulations in the Republic of Serbia.Quarry has been active since 1947.Basic mobile equipment on quarry are - Atlas Copco ROC L6 drill machine, CAT 336 DLN ME and CAT 330 DL hydraulic excavators and CAT 980H loader.

Plants for the preparation of mineral materials at quarry are: • Primary (clover) crusher METSO LOKOTRACK 110 (LT 110)• Secondary (impact rotary) crusher KLEEMANN SHB 12-90• Tertiary (cone) crusher METSO HP-100 (sieve METSO CVB 2060)

▌ Stone aggregate 0-4 mm

Stone aggregate 4-8 mm▌

Stone aggregate 8-11 mm▌

Stone aggregate 8-16 mm▌

Stone aggregate 16-22 mm▌

Stone aggregate 16-31.5 mm▌

Stone aggregate 0-31.5 mm▌

Stone aggregate 31.5-63 mm▌

Mechanical tampon 0-63 mm▌

Crashed stone - not granulated▌

Crashed stone - granulated▌

Mechanical tampon II class▌

Stone aggregate 0-120 mm▌

Stone aggregate 63-120 mm▌

BASIC PRODUCTS

Annual production:approximately 230.000 t

Total reserve:approximately 4.100.000 t

Page 13: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Asphalt base, VinčaAsphalt base

Page 14: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

The Vinča asphalt base is located in the municipality Grocka, 2 km from Smederevo road and 10 km from Belgrade, and nearby of the E 75 - Belgrade-Nis highway, which is part of the European Corridor 10.

The BENNINGHOVEN asphalt base with 12 hot bunkers, completely digitized and computerized, with a capacity of 240 t/h, which ranks it in the line of major asphalt bases, by capacities, in Serbia, as well as one of 3 in Europe that can simultaneously produce asphalt of eruptive and of limestone origin.

▌ Asphalt concrete: АВ 4 k, АВ 8 k, АВ 11 k, АВ 16 k

Bit bearing layer: BNS 22, BNS 32▌

Bit bearing wearing layer: BNHS 16▌

Eruptive asphalt concretes: АВ 8 s, АВ 11 s, АВ 16 s,▌

Eruptive asphalt concrete with polymers: АВ 11 s with РтВ▌

Asphalt in colour (red)▌

Drainage asphalt▌

SMA asphalt▌

BASIC PRODUCTS

Capacity of asphalt base is 240 t/h

Page 15: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Lapišnica, Eastern Sarajevo

Quarry

Page 16: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quarry Lapišnica is located in Bosnia and Herzegovina in Eastern Sarajevo.

The stone that is being exploited in Lapišnica is of limestone origin and is used mostly for infrastructure projects for production of asphalt, concrete production, and there is also a possibility of use in the chemical industry and pharmaceutical production.

Reports on the quality of stone, as well as in Serbia based on material testing, are issued by accredited laboratory. Quarry Lapišnica has certicates of factory production control, and that is for concrete aggregate, fractions 0/4, 4/8, 8/11, 11/16 mm in accordance with BAS-EN 12260 + A1: 2009, as well as certicate BAS EN-13340 for asphalt.

The quarry has started with work in 2006. The crushing plant of METSO MINERALS producer has a stone processing capacity of 500 t/h.

▌ Filer

Fraction 0-2 mm▌

Fraction 0-4 mm▌

Fraction 2-4 mm▌

Fraction 4-8 mm▌

Fraction 8-11 mm▌

Fraction 11-16 mm▌

Fraction 16-22 mm▌

Fraction 22-31.5 mm▌

Mixed fraction (0-16, 0-32, 0-60)▌

Fraction 8-16 mm▌

Fraction 16-32 mm▌

Fraction 32-63 mm▌

Separated tampon▌

Crashed stone▌

Fraction 50-300 mm•

Bulk material •

BASIC PRODUCTS

Annual production:approximately 800.000 t

Total reserves:117.348.898 t

Page 17: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

EquipmentTeko Mining

Page 18: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Mechanisation of Teko Mining consists of 64 mobile units which

are: excavators, loaders, dumpers, drilling machines, etc.

Special attention is paid to timely preventive maintenance.

Stone production and processing plants consist of primary,

secondary and tertiary crushers, as well as system for screening of

the manufacturer METSO MINERALS AND KRUPP.

In Batocina, we also have a mill for production of ler, which

works 24/7, and on which we receive a rst class ler.

Particular attention is being paid to crushing plants, in order to

ensure a consistently high quality of the output product. These

plants are capable to produce and to clean stone for all types of

works in the construction industry.

Teko Mining possess and two mobile crushing plants SANDVIK

and METSO MINERALS.

Vinča asphalt base is one of the newest in this region, capable to

deliver at the same time asphalts with eruptive and asphalts with

limestone fractions, because it has twelve hot bunkers which

makes it unique in Serbia. It owns a system for recycled asphalt in

colour. It is fully in capsule and has capacity of 240 t/h.

Page 19: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Quality system of productsTeko Mining

Page 20: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

All business activities are in line with current standards and

customer comments are very rare on the quality of nished

products.

Human resources management is done through continuous

monitoring of employees' work, through training and

development.

Teko Mining is committed to identify and full requirements of all

internal and external customers of our products and services.

Customer satisfaction is achieved through the continuous

improvement of the quality of the products that contribute to the

process and by the efforts of employees. All conditions necessary

in this process are provided: resources, work environment,

training and continuous alignment with the requirements of the

Integrated Management System.

The quality management system is effectively applied and

enhanced to imply continuous improvement of product quality

in Teko Mining, which improves cooperation with customers.

Integrated Management System

The qual i ty management sys tem, the

environmental management system and the

safety and health at work are in accordance

with the requirements of the standards: SRPS ISO

9001: 2015, SRPS ISO 14001: 2015, SRPS ISO 18001:

2008 for eld of production and sales of stone

aggregates and asphalt mixtures.

Page 21: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Safety and Health at WorkTeko Mining

Page 22: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

The quarries possess the appropriate technical documentation

and all the necessary approvals for the exploitation and

performance of mining works.

The validity of machines and equipment is regularly checked,

which is conrmed by the Professional Findings of machinery and

equipment for safe work, and all employees that are working at

an increased risk workplace are trained to perform their tasks

safely.

Protective equipment used for personal protection has

appropriate quality certicates. For the execution of mining

works on all quarries, the services of external companies are

used. The risk assessment act was made according to the valid

systematization for all workplaces in the company.

At Vinca asphalt base production is done by using preventive

measures for safe and health work, monitoring on environmental

impacts is carried out in order to reduce them.

Page 23: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Environmental ProtectionTeko Mining

Page 24: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Implementation of environmental measures in Teko Mining is a

high priority. The compliance of Teko Mining with the laws and

regulations in the eld of environmental protection has been

carried out.

Based on identied environmental aspects, analysis of potential

accident cases, analysis of types and quantities of generated

waste, analysis of monitoring reports and on the basis of

achieved goals in the previous year, the environmental goals for

the next period are proposed with the goal to:

• Reduce the amount of hazardous waste that is generated

• Reduce the resources spent in performing activities

• Monitor the inuences and thus complete control is

achieved

• Improve the employees' attitudes constantly and increase

of ecological awareness among all employees

Page 25: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Business resultsTeko Mining

Page 26: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

New owner of the company took measures in order to restructure

the organization of business, all with the goal of achieving

positive business results.

The company operates protable and nancing of current

production is largely ensured from its own working capital, with

minimal use of bank loans. From year to year investments in

equipment were growing, so in 2018 the total investment was 6

million euros.

Placement of products which are produced in quarries

operating within Teko Mining is carried out on the local market,

on the territory of the Republic of Serbia and Bosnia and

Herzegovina.

Teko Mining is a medium-sized company and annual nancial

statements have been conrmed by “the Moore Stephens”

audit company, and consolidated balance sheet at Teko Mining

GmbH by the BDO Group.

The main application the products have in the construction and

maintenance of roads and highways, as well as railways, water

management facilities, electric power industry and other

infrastructure areas.

In addition to major infrastructure projects, a signicant amount

of products is being distributed through local government

bodies, especially public companies involved in the

maintenance of local road infrastructure, so a large number of

our customers are public companies in the municipalities where

our quarries are located, as well as the municipalities and in their

surround.

Page 27: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

The largest customers

▌ RŽD International

Strabag▌

TE Nikola Tesla Obrenovac▌

Tehnogradnja doo Kruševac▌

PZP Kragujevac▌

Trace (PZP Niš i PZP Vranje)▌

JKP Beograd Put▌

Infrastruktura Železnice Srbije▌

Neimar put Salakovac▌

PZP Požarevac▌

Autotransport Kostolac▌

Vodoprivredno preduzeće Požarevac▌

PZP Beograd▌

Energoprojekt niskogradnja▌

MGBH d.o.o. Sarajevo▌

MIBRAL d.o.o. Sarajevo▌

EURO-ASFALT d.o.o. Sarajevo▌

Planum▌

Jugokop▌

Bauwesen▌

AR Gradnja▌

Srbijaautoput▌

JKP ŠUMADIJA Kragujevac▌

Ingrapomni▌

CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION▌

China rail▌

Arbag▌

Milmar put▌

Novi Pazar put▌

Put Invest▌

Amiga▌

Elita Cop▌

Izoteks▌

Teko Mining

Page 28: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

Locations and contacts

Austria

Teko Mining GmbHKarl Maria von Weber-Gasse 6A-8010 GrazAUSTRIAE-mail: [email protected]

Serbia

Teko Mining d.o.o Milentija Popovića 5v, 11070 Novi BeogradE-mail: [email protected] Telephone: +381 11 413 7000

Quarry BatočinaKneza Miloša Obrenovića 28, 34 227 BatočinaContact person: Zlatko IvanovićTelephone: +381 69 654 725

Quarry Krš, LjubovijaVojvode Mišića BB, 15 320 LjubovijaContact person: Radojko StančićTelephone: +381 69 654 881

Quarry Ladne vode,Petrovac na MlaviMlavska 18,12 300 PetrovacContact person: Dejan PavlovićTelephone: +381 69 654 799

Asphalt base VinčaBeogradska 246, Grocka11 351 VincaContact person: Radiša GrujićTelephone: +381 69 654 708

Quarry ĆeramideZagrađe BB32 314 ZagrađeContact person: Nikola HrnjezTelephone: +381 69 654 884

Bosnia and Herzegovina

Teko Mining Lapišnica d.o.o.Lapišnica bb,71 144 Istočni Stari Grad Eastern SarajevoE-mail: [email protected] Telephone: 00 387 33 23 79 02

Teko Mining

Page 29: Welcome to Teko MiningWelcome to Teko Mining A word of the owner Bearing in mind that I have earlier been present in the eld of investments and economic infrastructure, this time from

www.tekomining.com