Health and Safety File[Project name]
[Project description]Date
Prepared for:
This document is for illustrative purposes only. The user is entirely responsible for developing this document to meet their specific requirements.
Please remove the APS logo and replace with your own business details before issuing.
[Project name]Health and Safety File 2
Revision Ref Issue Date Purpose of issue / description of revision Client Sign-off
(Initials & Date)
A dd/mm/yyyy Preliminary Issue
Document Validation
Revision History
Quality Assurance
Purpose of issue / description of revision / version “Reason for Issue”
Prepared by Checked by Approved by
Name A Person B Person C Person
This file has been prepared by Name of Business with all reasonable skill, care and diligence, within the terms of the Contract with the Client. The report is confidential to the Client and Name of Business accepts no responsibility of whatever nature to third parties to whom this report may be made known.
No part of this document may be reproduced without the prior written approval of Name of Business
[Project name]Health and Safety File 3
ContentsDocument Validation
Section 1 – Description of Project
1.1 – General Description of the Project
1.2 – Site Specific Rules
Section 2 – Contacts
2.1 – Design Team
2.2 – Principal Contractor/Sub-Contractors/Suppliers
Section 3 – Design Criteria, Significant Design, Construction and Maintenance Hazards
3.1 – Architect
3.2 – Structural Engineer
3.3 – Civil Engineer
3.4 – M & E Services Engineer
3.5 – Principal Contractor
Section 4 – As Built Information
4.1 – Architect
4.2 – Structural Engineer
4.3 – Civil Engineer
4.4 – M & E Services Engineer
Section 5 – Operational and Maintenance Manuals – supplier by Contractor
[Project name]Health and Safety File 4
Section 1 - Introduction1.1 Details of project
Details of project
ADDRESS
Address
1.2 Site Specific RulesProvided from Client – rules, PTW, access arrangements, etc
[Project name]Health and Safety File 5
Section 2 - Contacts2.1 Design Team
Discipline Organisation Address Contact/details
Client
DesignerPrincipal Designer
2.2 Principal Contractor/Sub-Contractors/SuppliersList or refer to O & M Manuals if this is applicable
Discipline Organisation Address Contact/detailsPrincipal ContractorContractor
Contractor
Supplier
Supplier
[Project name]Health and Safety File 6
Section 3 – Design Criteria, Significant Design, Construction and Maintenance Hazards
3.1 ArchitectIssue pro-forma to architect for completion and insert:- orInsert information supplied by architect
3.2 Structural EngineerIssue pro-forma to structural engineer for completion and insert:-orInsert information supplied by structural engineer
3.3 Civil EngineerIssue pro-forma to civil engineer for completion and insert:-orInsert information supplied by civil engineer t
3.4 M & E EngineerIssue pro-forma to M & E engineer for completion and insert:-orInsert information supplied by M & E engineer
3.5 Principal ContractorIssue pro-forma to Principal Contractor for completion and insert:-orInsert information supplied by Principal Contractor
[Project name]Health and Safety File 7
3.6 Other parties as appropriate
[Project name]Health and Safety File 8
Section 4 – As Built Information4.1 Architect
Insert Drawings and Register
4.2 Structural Engineer Insert Drawings and Register
4.3 Civil EngineerInsert Drawings and Register
4.4 M & E Engineer Insert Drawings and Register
[Project name]Health and Safety File 9
Section 5 – Operation and Maintenance Manuals
Supplied by Principal Contractor