WEL COME MUSAID SWITCH GEAR FACTORY COMPANY LTD. P.O. BOX : 565 RIYADH 11383 NEW INDUSTRIAL AREA AL...

35
WEL COME WEL COME MUSAID SWITCH GEAR FACTORY MUSAID SWITCH GEAR FACTORY COMPANY LTD. COMPANY LTD. P.O. BOX : 565 RIYADH 11383 P.O. BOX : 565 RIYADH 11383 NEW INDUSTRIAL AREA NEW INDUSTRIAL AREA AL KHARJ ROAD-RIYADH-K.S.A AL KHARJ ROAD-RIYADH-K.S.A TELEPHONE: 4984063/4981987 TELEPHONE: 4984063/4981987 TELE FAX : 4982491 TELE FAX : 4982491 E-MAIL [email protected] E-MAIL [email protected]

Transcript of WEL COME MUSAID SWITCH GEAR FACTORY COMPANY LTD. P.O. BOX : 565 RIYADH 11383 NEW INDUSTRIAL AREA AL...

WEL COMEWEL COME

MUSAID SWITCH GEAR FACTORY MUSAID SWITCH GEAR FACTORY

COMPANY LTDCOMPANY LTD

PO BOX 565 RIYADH 11383PO BOX 565 RIYADH 11383

NEW INDUSTRIAL AREA NEW INDUSTRIAL AREA

AL KHARJ ROAD-RIYADH-KSAAL KHARJ ROAD-RIYADH-KSA

TELEPHONE 49840634981987TELEPHONE 49840634981987

TELE FAX 4982491TELE FAX 4982491

E-MAIL MUSAIDFACTORYYAHOOCOME-MAIL MUSAIDFACTORYYAHOOCOM

INTRODUCTIONINTRODUCTION

I N T R O D U C T I O N

Dear Sir

It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully

for MUSAID SWITCH GEAR FACTORY

IHSAN SALEH AL KHATEEB (Managing Director)

ΪϴδϟΔϳΎϨϋ

ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ

ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ

ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ

)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (

ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ

ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ

ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ

ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ

Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ

έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ

ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ

ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ

)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (

ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ

ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ

ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ

ϡΎόϟήϳΪϤϟ

ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ

MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART

Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1

GENERAL MANAGER

ADMINISTRATION MANAGER

ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

SECRETARY ndashCUM- DISPATCH CLERK

QUALITY CONTROL INSPECTOR

AUTO CAD DESIGNER

MANAGEMENT REPRESENTATIVE (MR

MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)

FACTORY MANAGER

GENERAL MANAGER GENERAL MANAGER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

ELECTRICAL SUPERVISOR

FACTORY MANAGER HR amp ACCOUNTS

FOREMAN- CUM - MECHANICAL SUPERVISOR

QUALITY CONTROL INSPECTOR

ELECTRICAL SUPERVISOR

ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

ACCOUNTS CLERK

HR amp ACCOUNTS

HR amp ACCOUNTS

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

INTRODUCTIONINTRODUCTION

I N T R O D U C T I O N

Dear Sir

It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully

for MUSAID SWITCH GEAR FACTORY

IHSAN SALEH AL KHATEEB (Managing Director)

ΪϴδϟΔϳΎϨϋ

ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ

ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ

ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ

)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (

ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ

ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ

ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ

ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ

Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ

έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ

ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ

ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ

)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (

ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ

ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ

ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ

ϡΎόϟήϳΪϤϟ

ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ

MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART

Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1

GENERAL MANAGER

ADMINISTRATION MANAGER

ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

SECRETARY ndashCUM- DISPATCH CLERK

QUALITY CONTROL INSPECTOR

AUTO CAD DESIGNER

MANAGEMENT REPRESENTATIVE (MR

MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)

FACTORY MANAGER

GENERAL MANAGER GENERAL MANAGER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

ELECTRICAL SUPERVISOR

FACTORY MANAGER HR amp ACCOUNTS

FOREMAN- CUM - MECHANICAL SUPERVISOR

QUALITY CONTROL INSPECTOR

ELECTRICAL SUPERVISOR

ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

ACCOUNTS CLERK

HR amp ACCOUNTS

HR amp ACCOUNTS

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

I N T R O D U C T I O N

Dear Sir

It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully

for MUSAID SWITCH GEAR FACTORY

IHSAN SALEH AL KHATEEB (Managing Director)

ΪϴδϟΔϳΎϨϋ

ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ

ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ

ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ

)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (

ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ

ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ

ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ

ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ

Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ

έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ

ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ

ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ

)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (

ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ

ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ

ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ

ϡΎόϟήϳΪϤϟ

ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ

MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART

Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1

GENERAL MANAGER

ADMINISTRATION MANAGER

ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

SECRETARY ndashCUM- DISPATCH CLERK

QUALITY CONTROL INSPECTOR

AUTO CAD DESIGNER

MANAGEMENT REPRESENTATIVE (MR

MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)

FACTORY MANAGER

GENERAL MANAGER GENERAL MANAGER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

ELECTRICAL SUPERVISOR

FACTORY MANAGER HR amp ACCOUNTS

FOREMAN- CUM - MECHANICAL SUPERVISOR

QUALITY CONTROL INSPECTOR

ELECTRICAL SUPERVISOR

ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

ACCOUNTS CLERK

HR amp ACCOUNTS

HR amp ACCOUNTS

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

ΪϴδϟΔϳΎϨϋ

ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ

ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ

ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ

)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (

ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ

ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ

ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ

ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ

Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ

έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ

ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ

ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ

)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (

ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ

ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ

ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ

ϡΎόϟήϳΪϤϟ

ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ

MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART

Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1

GENERAL MANAGER

ADMINISTRATION MANAGER

ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

SECRETARY ndashCUM- DISPATCH CLERK

QUALITY CONTROL INSPECTOR

AUTO CAD DESIGNER

MANAGEMENT REPRESENTATIVE (MR

MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)

FACTORY MANAGER

GENERAL MANAGER GENERAL MANAGER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

ELECTRICAL SUPERVISOR

FACTORY MANAGER HR amp ACCOUNTS

FOREMAN- CUM - MECHANICAL SUPERVISOR

QUALITY CONTROL INSPECTOR

ELECTRICAL SUPERVISOR

ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

ACCOUNTS CLERK

HR amp ACCOUNTS

HR amp ACCOUNTS

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART

Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1

GENERAL MANAGER

ADMINISTRATION MANAGER

ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

SECRETARY ndashCUM- DISPATCH CLERK

QUALITY CONTROL INSPECTOR

AUTO CAD DESIGNER

MANAGEMENT REPRESENTATIVE (MR

MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)

FACTORY MANAGER

GENERAL MANAGER GENERAL MANAGER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

SALES DESIGN PURCHASE amp EXECUTION ENGINEER

ELECTRICAL SUPERVISOR

FACTORY MANAGER HR amp ACCOUNTS

FOREMAN- CUM - MECHANICAL SUPERVISOR

QUALITY CONTROL INSPECTOR

ELECTRICAL SUPERVISOR

ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR

ACCOUNTS CLERK

HR amp ACCOUNTS

HR amp ACCOUNTS

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

PLANTS AND MACHINERIESPLANTS AND MACHINERIES

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SURFACE TREATMENT PLANT

MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant

Stages of our Surface Treatment are summarized as below

1 Pretreatment Degreasing and Cleaning of Sheet Surface is

treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade

2 Powder Coating After degreasing the treated surface goes to

Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun

3 Furnace Baking Coated enclosures or sheet surfaces pass inside

Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period

4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

MAJOR MACHINES COMMISSIONED IN MUSAID

A SHEET METAL FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication

Machine 1 FINN Power-

Finland 2 CNC(Programmable) Hydraulic Sheet Bending

Machine (500 KN) 1 Darley-Italy

3 Hydraulic High Press Bending Machines (3 meter length)

3 OMAG Germany

4 Hydraulic High Press Shearing Machines (3 meter length)

2 OMAG Germany

5 Pneumatic Sheet Notching Machines 2 -----

6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany

7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany

8 CO2 Gas Welding Machines 2 ----

9 Electric Arc Welding Machines 15 ----

10 Portable Arc Electric Welding Machines (for site jobs)

3

KEMPPI Germany

11 Electric Spot Welding Machine 1 FIFES Italy

12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea

13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SNo MACHINE DESCRIPTION QTY MAKE

1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)

1 SUNRISE ndashKorea

2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea

3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)

1 EUROMACKorea

4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany

5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany

6 Vertical Drilling amp Milling Machine (Upto 40 mm)

2 China

7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly

B BUS BAR FABRICATION MACHINES

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)

1 Intech OverseasIndia

2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface

1 Intech OverseasIndia

3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)

1 Italy

4 Polyester Powder Thickness Tester 1 ----

C SURFACE TREATMENT amp POWDER PAINT COATING PLANT

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SNo MACHINE DESCRIPTION QTY MAKE

1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length

1 KURDONGKorea

2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan

3 Trolley Jacks 2 Tonnes 5 -----

D LOAD LIFTING FACILITIES

SNo TESTING EQUIPMENTS QTY MAKE

1 Load Bank for Direct Injection Test (Suitable Upto 600A)

1 CALTROLS Germany

2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----

E TESTING EQUIPMENTS

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SCECO PURCHASE ORDERSCECO PURCHASE ORDER

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR

1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

ABHA AIR PORTROYAL PAVILLIONEXTENSION

MINISTRY OFDEFENCE (MODA)

AL MABANIGENCONTCo

2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA

AL MABANIGENCONTCo

3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

YANBU AIR PORT MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

MADAEN SALEH AIR PORT (Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

NAJRAN AIR PORT(Under Construction)

MINISTRY OFDEFENCE (MODA)

AL MABANICONTCo

7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS

GEANT PLAZAAL HOKAIR MALL

FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCos

8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS

DAHRAN MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS

HAFOUF MALL FAWAZ AL HOKAIRGROUP

AL HOKAIRCONTCo

10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH

SETCOCONT Co

11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo

12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST

13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH

MINISTRY OFDEFENCE (MODA)

AL MABANIGEN CONT Co

14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER

PEACE SUN-9DAHRAN AIR PORT PROJECT

MODARSAF

BAUNST NEDAM

15 DISTRIBUTION PANEL BOARDamp ATS

RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH

TEST CONT Co

SOME LATEST COMPLETED PROJECTS DETAIL

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY

17 AIR INSULATED BUS DUCT-4000A90 METER LONG

ABB ABB ABB

18 DISTRIBUTION PANEL BOARDSamp ATS PANELS

CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co

19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL MEEDCOHYUNDAI Co

20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS

SCECO- CENTRAL COGILEX ALSTOM

21 ACDC PANEL BOARDS SUBSTATIONS8760

SCECO- CENTRAL SIEMENS

22 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL BABTAINCONT Co

23 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH AL KADICONT Co

24 132 KV SUBSTATION LIGHTING PANEL BOARDS

DIFFERENT SUBSTATIONS

SEC-CRB- RIYADH OSSAIS CONT Co

25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH

PRIVATE -----

26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO

27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co

28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE

LAMEECCONT Co

29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL

HILTON HOTEL HAIF CONT Co

31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co

32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

LECTURE HALL BUILDING

KING SAUD UNIVERSITY A JA CONT Co

33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK

PRINTING PRESSPROJECT

KING SAUD UNIVERSITY A JA CONT Co

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY

DIFFERENT CONTRACTORS

35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY

MINISTRY OF TRANSPORT

SHIBH AL JAZIRAH Co

37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET

AL FAYHACONTCo

38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)

MINISTRY OF EDUCATION DIFFERENTCONTRACTORS

40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)

MINISTRY OF EDUCATION ABA HUSSAINCONT Co

41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION

MINISTRY OFTRANSPORT

ABA HUSSAINCONT Co

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS

Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows

1 Mechaical operation test2 Electrical operation test

3 Optional accessories test

After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests

At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing

For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance

Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages

Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value

Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels

All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter

- NOTHING FOLLOWS-

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3

Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity

Accepted No flash over No puncture No flash over No puncture Accepted

Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY

Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature

Tests witnessed by Name 1 Signature Name 2 Signature

Date

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

WARRANTY LETTERSWARRANTY LETTERS

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

War r ant y Let t er DATE

CLIENT

CONTRACTOR

PROJECT

OUR REFERENCE

DRAWING REF No

EQUIPMENT

The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery

Tests certificates are being issued separately for all above equipments individually

The guarantee covers any manufacturing or workmanship defects only

Thanks amp Regards

IHSAN S AL KHATEEB (General Manager)

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

LOCATION MAPSLOCATION MAPS

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29

THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN

DESIGN BYAMJAD ALI KHAN DIRECTION BY

SYED TAUSIF SHAH

  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 27
  • Slide 28
  • Slide 29