INTEGRATION PLANWeir Gulch
August 30, 2016
Related Projects and Partners
1. Welcome & Meeting Purpose
2. Other Project Updates• Floodplain Study• Urban Waterways Study
3. Purpose of the Integration Plan
4. Integration Plan Ideas
5. Gather Feedback/Open House
Tonight’s Agenda
Fede
ral B
lvd
Study AreaWeir Gulch
For discussion purposes only
Fede
ral B
lvd
6th Ave
Alameda Ave
Sher
idan
Blv
d
Related ProjectsFloodplain Study
Related ProjectsDenver Urban Waterways Study
www.denvergov.org/DenverWaterways
Study Update:• Project team is evaluating the range of options• Recommend a preferred option based on selection criteria• Release report of proposed preferred plan and review
at public meeting – Late 2016 / Early 2017• Army Corps & City of Denver selection of plan – Mid 2017
Integration PlanWhat is the purpose?
• Build upon and complement the technical Army Corps
study by envisioning neighborhood place-making benefits
and connections
• Identify neighborhood enhancements that will better
connect and activate your community
Integration Plan
How will it be used?
• Used to inform potential enhancements to Army Corps work
• Used to prioritize future complementary City investments
within your neighborhood
• The neighborhood enhancements have the potential of
happening regardless of the timing of the Army Corps study
Why now?
• We want your input on the greater vision early in the process
Other Denver Projects in the Area
• Weir Gulch and Tributaries Floodplain Study
• Westwood Neighborhood Plan
• Decatur Federal Station Area Plan
• Sun Valley Master Plan
• Federal Boulevard Corridor Plan
• Barnum-Barnum West Neighborhood Plan
Weir Gulch
Public Input to Date
• Desire for quality outdoor spaces within the neighborhood that are safe and inviting
• Desire for better maintenance and water quality of the open channel
• Desire for safe and comfortable connections to Weir Gulch and other neighborhoods
• Concern about property impacts
From Urban Waterways Study
Weir GulchExisting Conditions
For discussion purposes only
Fede
ral B
lvd
6th Ave
Alameda Ave
Sher
idan
Blv
d
Goals of Integration Plan
• Establish clear connections from Gulch to neighborhood
• Establish clear visual and physical linkages between trail segments
• All trail/road crossings should have clear striping and should be signalized or grade separated
• Gulches should be amenity spaces
Weir Gulch
Integration Plan Terms
Bike/Ped: bicycle and pedestrianGrade-separated: pedestrian/bike underpass or bridgeEnhanced Crossings: comfortable street crossing for pedestrian/bikes that have striping and possibly a pedestrian signal Green Street: Street that is multi-modal and incorporates water quality into the streetscape design
Weir Gulch
Weir GulchOverall Plan
For discussion purposes only
Fede
ral B
lvd
6th Ave
Alameda Ave
Sher
idan
Blv
d
Weir Gulch - Reach 1& 2 Ideas
1. Study feasibility of creating grade-separated bike/ped connection through 8th & Federal intersection.
2. Provide comfortable bike/ped crossing at Gulch and Decatur St.3. Create enhanced bike/ped routes to Barnum Park.
For discussion purposes only
Fede
ral B
lvd
8th Ave
6th Ave
Knox
Ct
Hoo
ker S
t
Weir Gulch – Reach 3 Ideas
1. Extend closure of 2nd Ave to create a greenway from Stuart to Knox.2. Provide street crossings at Perry, Lowell, Knox and Hooker.3. Implement green street connection along Lowell to 1st Ave to connect to
commercial area. For discussion purposes only
3rd Ave
Knox
Ct
4th Ave
1st Ave
Julia
n St
Irvin
g St
Hoo
ker S
t
King
st
Low
ell B
lvd
Mea
de S
t
New
ton
St
Osc
eola
St
Perry
St
Qui
tman
St
Ral
eigh
St
Stua
rt St
Weir Gulch – Reach 4 & tributary Ideas
1. Create grade-separated bridge crossing at Alameda for bike/ped crossing2. Provide trail access on both sides of Gulch between 1st Ave and Bayaud3. Explore opportunities for new pocket parks.
For discussion purposes only
1st Ave
Stua
rt St
2nd Ave
Ellsworth Ave
Bayaud Ave
Alameda Ave
Xavi
er S
t
Sher
idan
Blv
d
Perry
St
1. Prioritize Nevada Pl and Wolff St for green connections to the Gulch2. Study opportunity to work with the City of Lakewood to create grade-separated
crossing at Sheridan and extend trail into Lakewood.3. Explore opportunities for new pocket parks.
Weir Gulch – Reach 5 Ideas
For discussion purposes only
Sher
idan
Blv
d
Alameda Ave
Nevada Pl
Alaska Pl
Custer Pl
Utic
a St
Wol
ff St
Lake
woo
d
We want to hear your likes, dislikes and top priorities.
Visit the stations tonight, write comments on the plans and place dots next to your
top priorities
Comment online at www.denvergov.org/denverwaterways
Feedback & Open House
Urban Waterways Study Public Meeting #3Winter 2016/2017
Propose preferred plan at public meeting
Next Steps & Schedule
Q & A
To contact the project team, please Call 311 and reference Denver Waterways
www.denvergov.org/DenverWaterways.com
Contact Information
Tiffany Vanosdall‐ Army Corps Study PMSelena Klosowski / Karen Good ‐ Denver Study PM
Jeremy Hamer – Denver Floodplain Manager