    Risk Assesment

    Who is at Risk? Severity

    1- Equipments/Material Medium

    IntrodThis report has been prepared to asses the risk involved in coil weighing pro

    coils are placed on a weighing scale from crane " # and weight is noted. $incident has happened two times in the past and it resulted in damage of

    repaired instantl%. Main reason for the droppa

    PotentialHazard

    Eisting!ontrol

    "easures

    !oil #ro$

    1- &cale 'amage(- &cale malfunction 1- &lowl% placecoil on scale

  • 7/23/2019 Weighing Scale Risk Assesment

    2/3

    f weighing scale

    %ikelihood Preventive "easures Res$onsi&ilities

    Medium

    ction ess. Coils are weighed before annealing after rewinding. or this operation!

    oblem in the process occurs when coil drops onto the weighing scale. Thiseighing scale and loss of operation time for three weeks as scale was not

    ge is the coil tong design and crane controls.

    1- Coil should be properl% rewinded(- ) double-rim-gripping-t%pe vertical coil

    tong should be purchased*- Crane remote should be repaired +

    crane should be operated from the ,oor

    1- ewinding operators

    (- Crane perator*- &hift ncharge0- & Management

  • 7/23/2019 Weighing Scale Risk Assesment