MINERA SAN CRISTOBAL S.A.
WEEKLY PLAN 2009 MINE
Del 13 al 19 de Diciembre de 2009
Mine Operations
![Page 2: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/2.jpg)
Mining OperationsWeekly Performance Report
. Current Week 50 12-Dec Month to dateMaterial Movement Budget Current Difference Variance Budget Current Difference Variance
Tonnes Tonnes Tonnes % Tonnes Tonnes Tonnes %Total Tonnes Mined Month budget 1,050,000 1,118,859 68,859 6.6 1,800,000 1,875,939 75,939 4.2Total Sulfide Ore Tonnes Mined 318,338 342,729 24,391 7.7 545,722 647,963 102,241 18.7Oxide Ore Tonnes Mined 35,157 127,152 91,995 261.7 60,269 155,304 95,035 157.7Waste Tonnes Mined 696,505 648,978 -47,527 -6.8 1,194,009 1,072,672 -121,337 -10.2
1,050,000 1,800,000Rehandle Material 47,401 64,068Sulfide Ore Tonnes to CrusherSulfide from toldos stock pile to Plant stock pileSulfide from Plant stock pile to Toldos Stock pile
Crusher feeding 318,150 353,366 35,216 11.1 545,400 587,211 41,811 7.7Nota: Primary crusher stopped 11:15 hours this week
S.R. 2.30 2.17 2.30 2.19
Equipment Target Current Difference Variance Target Current Difference Variance% %
Trucks CAT 789 Availability 85% 89% 4% 4.6 85% 88% 3% 4.0Trucks CAT 785 Availability 75% 82% 7% 9.1 75% 78% 3% 4.3Loaders Availability 76% 86% 10% 13.7 76% 84% 8% 10.6Shovels Availability 85% 90% 5% 5.6 85% 86% 1% 1.0Dozers Availability 85% 78% -7% -7.8 85% 80% -5% -5.4Water truck Availability 85% 45% -40% -46.7 85% 57% -28% -33.2Grader Availability 85% 49% -36% -42.0 85% 39% -46% -54.1Drills (m/hr.) Availability 85% 90% 5% 5.4 85% 84% -1% -1.3Trucks CAT 789 Utilization 85% 82% -3% -3.6 85% 83% -2% -1.8Trucks CAT 785 Utilization 83% 85% 2% 2.8 83% 86% 3% 3.6Loaders Utilization 86% 68% -18% -21.0 86% 71% -15% -18.0Shovels Utilization 86% 82% -4% -4.1 86% 84% -2% -2.9Dozers Utilization 85% 70% -15% -17.4 85% 77% -8% -8.9Water truck Utilization 85% 88% 3% 4.0 85% 88% 3% 3.3Grader Utilization 85% 88% 3% 3.4 85% 89% 4% 4.4Drills (m/hr.) Utilization 88% 79% -9% -10.5 88% 79% -9% -10.3Loaders Productivity TPH 1,500 1,490 -10 -0.7 1,500 1,543 43 2.9Shovels Productivity TPH 2,400 2,717 317 13.2 2,400 2,605 205 8.5Drills (m/hr.) Productivity (m/hr.) 40 34 -6 -15.0 40 32 -8 -20.0
![Page 3: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/3.jpg)
844915 900
815
963 9941,061
1,1191050 1050 1050 1050 1050 1050 1050 1050
209
336375
329 331366
326 353301 301 301 301 301 301 301 318
100
300
500
700
900
1100
100
300
500
700
900
1100
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
Thou
sand
s
(KTonnes)
Thou
sand
s
Date
Production Statistics
Total Mined Budget Crusher feeding Crusher Budget
Target = 1,050,000 Tonnes Crusher target = 301,000
1,5591,441
1,7781,616
1,473 1,4591,583
1,490
1887
2248 22382095 2073
22692422
2717
2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400
1500 1500 1500 1500 1500 1500 1500 1500
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
(Tonnes/ hr)
Date
Productivities
Loader Productivity Shovel Productivity Shovel Target Loader target
Loader Target = 1,500 T/hrShovel Target = 2,400 T/hr
844915 900
815
963 9941,061
1,1191050 1050 1050 1050 1050 1050 1050 1050
209
336375
329 331366
326 353301 301 301 301 301 301 301 318
100
300
500
700
900
1100
100
300
500
700
900
1100
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
Thou
sand
s
(KTonnes)
Thou
sand
s
Date
Production Statistics
Total Mined Budget Crusher feeding Crusher Budget
Target = 1,050,000 Tonnes Crusher target = 301,000
1,5591,441
1,7781,616
1,473 1,4591,583
1,490
1887
2248 22382095 2073
22692422
2717
2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400
1500 1500 1500 1500 1500 1500 1500 1500
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
(Tonnes/ hr)
Date
Productivities
Loader Productivity Shovel Productivity Shovel Target Loader target
Loader Target = 1,500 T/hrShovel Target = 2,400 T/hr
63%
72%
41%
65%
82%
71%
82%
90%
73%
62%
72%
55%
76% 76% 75%
86%85% 85% 85% 85% 85% 85% 85% 85%
76% 76% 76% 76% 76% 76% 76% 76%
40%
50%
60%
70%
80%
90%
100%
40%
50%
60%
70%
80%
90%
100%
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
(%)
Date
Shovels Komatsu PC 4000 and Loaders CAT 994 Availabilities
Shovel Availability % Loader Availability Shovel Target Loader Target
Shovel Target = 85 % Loader Target = 76 %
75%78%
74%
65% 66%
71%73%
82%
74%
88% 88%
83%85%
81%
88% 89%85% 85% 85% 85% 85% 85% 85% 85%
75% 75% 75% 75% 75% 75% 75% 75%
50%
55%
60%
65%
70%
75%
80%
85%
90%
95%
100%
50%
55%
60%
65%
70%
75%
80%
85%
90%
95%
100%
24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec
(%)
Date
Trucks CAT 789 and CAT 785 Availabilities
CAT 785 Availability % CAT 789 Availability % CAT 789 Target % CAT 785 Target %
CAT 789 Target = 85 % CAT 785 Target = 75 %
![Page 4: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/4.jpg)
Tesorera 4100
Jayula4080
Jayula4040
Tesorera 4010
Tesorera 4130
0%
80%
110%
105%
0%
Planificado
Ejecutado
% Cumplimiento
40%105%
6865
00 m
E7666500 mN
7667000 mN
7666000 mN
6860
00 m
E
Weekly 50
% Cumplimiento
MINERA SAN CRISTOBAL S.A.
0 50 100
metres
200
Author: MPT
Office: Wayville
Drawing: MPT
Date:13/12/2009
Scale: 1:6000 Projection: PSAD56 / UTM zone 19S
![Page 5: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/5.jpg)
![Page 6: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/6.jpg)
MATERIAL QUEBRADO DISPONIBLE AL 12 DE DICIEMBRE DE 2009
WASTE S.R TOTALTONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG TONNES TONNES
JY4080 5,020 66 52 1.04 3.42 2,557 7,577 1,999 28 22 0.41 1.52 5,196 7,195
- -
7,019 - - 7,753 14,772 JY4040 32,350 60 103 0.38 2.53 32,350
7,707 23 44 0.11 0.87 7,707 2,750 67 185 0.56 1.39 2,750 8,057 66 129 0.75 2.25 8,057
50,864 - - - 50,864 TS4130 23,018 36 150 195,728 218,746
34,019 40 165 0.98 0.18 2,102 14 62 0.49 0.28 85,202 23 96 121,323 - -
34,019 2,102 108,220 195,728 340,069 TS4100 -
29,223 43 1 0.55 2.96 6,229 9 5 0.16 0.56 187,500 222,952 11,642 33 2 0.32 2.35 15,344 26,986
20 827 20 827
CRUSHER ORE LG ORE OX ORE
20,827 20,827 -
40,865 6,229 - 223,671 270,765 TS4090 112,817 112,817
- - -
- - - 112,817 112,817 TS4010 48,977 50 92.85 0.53 1.98 48,977
483,872 38 42.11 0.43 2.00 107,769 9 9.71 0.13 0.49 22,508 614,149 - - - - -
532,849 107,769 - 22,508 663,126
665,616 41 54 0.47 1.98 116,100 9 10 0.14 0.49 108,220 562,477 1.2 1,452,413
![Page 7: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/7.jpg)
Jayula4070
Jayula4040
Jayula4060
Tesorera 4190
Tesorera 4130
Tesorera 4100
Tesorera 4010
SEMANA 1
SEMANA 2
6865
00 m
E7666500 mN
7667000 mN
7666000 mN
6860
00 m
E
Office: Wayville
Date:13/12/2009
Scale: 1:7000 Projection: PSAD56 / UTM zone 19S
300
MINERA SAN CRISTOBAL S.A.
WEEKLY PLAN(12Dic09-19Dic09)Author: mpt
0 75 150
metres
Drawing: mpt
![Page 8: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/8.jpg)
WEEKLY MINE PLAN 13/12/2009 - 19/12/2009 Semana 1
WASTE S.R TOTALTONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG TONNES TONNES
JY4070 - 19,262 39 47 0.57 1.86 252,579 271,841
- - - -
19,262 - - 252,579 271,841 JY4040 50,795 62 111 0.50 2.45 50,795
- - -
50,795 - - - 50,795 TS4130 31,678 39 160 0.91 0.21 7,920 25 102 185,499 225,097
1,980 38 165 1.31 0.04 7,456 18 78 0.56 0.15 77,072 21 94 86,508 15,658 42 172 15,658
- 33,658 7,456 100,650 185,499 327,263
TS4100 29,291 43 1 0.55 2.96 29,291 28,138 32 2 0.33 2.28 6,180 9 5 0.16 0.56 75,826 110,144
CRUSHER ORE LG ORE OX ORE
- - - - -
57,429 6,180 - 75,826 139,435 TS4010 14,491 61 81.94 0.80 2.96 14,491
180,000 33 29.69 0.38 1.97 84,778 9 9.71 0.14 0.50 9 264,787 - - - -
194,491 84,778 - 9 279,278
355,635 40 52 0.49 2.01 98,414 10 15 0.17 0.48 100,650 25 107 513,913 2.0 1,068,612 .
50,805.0 14,059.1 14,378.6 73,416.1 152,658.9
![Page 9: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/9.jpg)
WEEKLY MINE PLAN 20/12/2009 - 26/12/2009 Semana 2
WASTE S.R TOTALTONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG PBKRG ZNKRG TONNES NSR AGKRG TONNES TONNES
JY4070 - 80,139 68 97 1.41 2.52 7,492 24 54 0.29 0.67 56,219 143,850
- - - -
80,139 7,492 - 56,219 143,850 JY4040 -
- - -
- - - - - JY4060 7,490 23 32 0.20 1.09 7,490
76,669 66 68 0.82 3.30 210,491 0 6 0.16 0.76 30,000 317,160 13,546 19 26 0.19 0.92 13,546
- 97,705 210,491 - 30,000 338,196
TS4190 350732 350,732 -
CRUSHER ORE LG ORE OX ORE
- -
- - 350,732 350,732 TS4010 15,147 40 88.22 0.36 1.29 3,107 18,254
170,740 36 44.03 0.41 1.80 31,919 202,659 - - - -
185,887 - - 35,026 220,913
363,731 49 62 0.70 2.20 217,983 8 0.16 0.75 - 471,977 1.9 1,053,691 .
51,961.6 31,140.4 - 67,425.3 150,527.3
![Page 10: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/10.jpg)
![Page 11: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/11.jpg)
![Page 12: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/12.jpg)
![Page 13: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/13.jpg)
Perforación y Voladura
PLAN SEMANAL P&V Nº 51Semana del 13 de Diciembre al 19 de Diciembredel 2009
TALADROS PERFORACIÓN (metros)Prioridad Equipo Tipo
MallaMalla B S Total
BloqueSaldo Inicial
Por día Domingo Lunes Martes Miércoles Jueves Viernes Sábado Taladros Semana
Saldo Final
Metros
1 701 Jy 4080 35 0 15 15 15 15 45 -10 2702 701 sobretama;os 40 0 20 20 20 40 0 80
85 350
0 704 Jy 4070_23 6.06 7 206 206 60 0 0 01 704 Jy 4040_04 5.63 6.5 81 65 60 16 16 0 1762 704 Ts 4090_02 5.63 6.5 225 90 70 50 70 15 135 0 1,4853 704 Jy 4070_24 6.06 7 251 0 70 55 70 70 56 251 0 2,7614 704 Jy 4060_18 6.06 7 280 0 70 70 70 210 770
PM 5 hr. 472 5,192
0 705 Ts 4010_06 5.63 6.5 218 218 60 0 0 01 705 Ts 4010_08 5.63 6.5 190 160 60 30 30 0 3302 705 Ts 4010_09 5.63 6.5 145 0 70 35 70 40 145 0 1,5953 705 Ts 4010_10 5.63 6.5 160 0 70 30 70 60 160 0 1,7604 705 Ts 4010_11 5.63 6.5 175 0 70 10 70 55 135 40 1,485
PM 5 hr. 470 5,170
1 706 Jy 4130_04 4.33 5 80 20 40 40 20 60 0 6602 706 Ts 4100_09 5.63 6.5 80 0 70 40 40 80 0 8803 706 Ts 4090_02 5.63 6.5 225 135 60 30 30 30 90 0 9904 706 Ts 4190_01 6.06 7 280 0 70 30 70 70 70 240 40 2,6405 706 Ts 4090_03 5.63 6.5 220 0 60 0 220 06 706 Ts 4090_04 5.63 6.5 260 0 65 0 260 0
470 5,170Total taladros a perforar 1412Total metros a perforar 15,532
VOLADURAS (toneladas)Voladur
as Malla Diámetro PF B X S Total
TaladrosDomingo Lunes Martes Miércoles Jueves Viernes Sábado
(Pulg) (Kg/m3) (m x m)1 Jy 4070_23 10 5/8 0.55 6.06 7 206 192,3172 Ts 4010_06 10 5/8 0.64 5.63 6.5 218 175,4843 Jy 4040_04 11 5/8 0.64 5.63 6.5 81 65,2034 Ts 4010_08 10 5/8 0.64 5.63 6.5 190 166,8485 Jy 4130_04 10 5/8 1.09 4.33 5 80 38,1056 Ts 4010_09 10 5/8 0.64 5.63 6.5 145 116,7217 Ts 4100_09 10 5/8 0.64 5.63 6.5 80 70,2528 Ts 4090_02 11 5/8 0.64 5.63 6.5 225 197,5849 Ts 4010_10 11 5/8 0.64 5.63 6.5 160 140,504
10 Jy 4070_24 3 5/8 0.55 6.06 7 251 255,6300 240,686 204,954 186,973 197,584 140,504 255,630
52,887 77,020 74,159 59,831 63,227 44,961 70,298
PM _ hr Mantenimiento Programado de X horasCC _ hr Cambio de componentesNota .-
Observaciones
0ANFO Planificado (KG)
TONELAJE QUEBRADOTONELAJE PLAN C&T
442,383
1,226,330
P y V MSC
![Page 14: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/14.jpg)
Toldos, Noviembre 2009Planificacion Mina
Plataforma PROVE
450x180 m61,000 m2
![Page 15: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/15.jpg)
Toldos, Noviembre 17, 2009Minera San Cristobal S.A.
Plataforma ‐ PROVE
Distancia a Distancia a Plataforam PROVE
2,735 m, Gradiente +/‐ 6.5%
Distancia a Plataforam PROVE
2,735 m, Gradiente +/‐ 6.5%
Distancia a Plataforam PROVE
2,735 m, Gradiente +/‐ 6.5%
Distancia a Botadero 53,145 m,
Gradiente +/‐ 10%
Distancia a Plataforam PROVE
2,735 m, Gradiente +/‐ 6.5%
Distancia a Botadero 53,145 m,
Gradiente +/‐ 10%
Distancia a Plataforam PROVE
2,735 m, Gradiente +/‐ 6.5%
![Page 16: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/16.jpg)
Toldos, Diciembre 2009Planificacion Mina
TRABAJOS EN CHANCADOR ‐ LEVANTE 1.5 M
![Page 17: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/17.jpg)
Toldos, Diciembre 2009Planificacion Mina
Nuevo Diseno‐ TF3
4190179Kt4190179Kt
4180298Kt
4160861Kt
4170643Kt
41501.1Mt
4190179Kt
4180298Kt
4160861Kt
4170643Kt
41501.1Mt
41401.0 Mt
41301.5 Mt Wst6.0 Kt Ore
4190179Kt
4180298Kt
4160861Kt
4170643Kt
41501.1Mt
41401.0 Mt
New RampaYuki
4130
41301.5 Mt Wst6.0 Kt Ore
New RampaYuki
![Page 18: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/18.jpg)
Minera San Cristóbal S.A.
Programación de
Mantenimiento
Reporte de
Mantenimiento Mina Diciembre 2009 – Sem 49 y 50
![Page 19: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/19.jpg)
![Page 20: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/20.jpg)
![Page 21: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/21.jpg)
![Page 22: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/22.jpg)
1. Análisis de Indicadores de la Flota PC 4000
![Page 23: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/23.jpg)
2. Análisis de Indicadores de la Flota CAT 994
![Page 24: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/24.jpg)
3. Análisis de Indicadores de la Flota CAT 992
![Page 25: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/25.jpg)
4. Análisis de Indicadores de la Flota CAT 789
![Page 26: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/26.jpg)
5. Análisis de Indicadores de la Flota CAT 785
![Page 27: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/27.jpg)
6. Análisis de Indicadores de la Flota CAT D10R
![Page 28: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/28.jpg)
7. Análisis de Indicadores de la Flota CAT 16H
![Page 29: WeeklyPlan_091213](https://reader031.fdocuments.in/reader031/viewer/2022020417/563dbba8550346aa9aaf1f17/html5/thumbnails/29.jpg)
8. Análisis de Indicadores de la Flota PV-271