Weekly Notice of Operations (WNoO) Rampion Offshore Wind Farm Limited Construction Operations Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations Page 1 of 14 “Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge” Contents 1) Notice to Mariners (NtM) (Active) ......................................................................................................... 2 2) Hazards/Mitigation for Project Vessels and PAX ............................................................................... 3 3) WTG Installation Vessel ............................................................................................................................. 4 4) Array cable burial Vessel ........................................................................................................................... 4 5) Hotel vessel ............................................................................................................................................... 4 6) Substation works ....................................................................................................................................... 5 7) Export Cable Vessel ................................................................................................................................... 5 8) Survey Vessel ............................................................................................................................................. 5 9) Installation Vessels Fibre Optic Cable ........................................................................................................ 6 10) Guard Vessels ............................................................................................................................................ 7 11) Crew Transfer Vessels................................................................................................................................ 7 12) Upcoming Operations (following 7 days) ............................................................................................ 9 13) Summary of Operations (previous 7 days) ....................................................................................... 10 14) Looking further ahead (beyond 7 days) (new activities starting) ................................................... 10 15) Project Met mast details....................................................................................................................... 11 16) Project Wave Rider ............................................................................................................................... 11 17) As Laid Cardinal Buoy Positions ........................................................................................................ 11 18) Contact details....................................................................................................................................... 11 19) Export Cable Coordinates ................................................................................................................... 12 20) Flotel Anchorage Position ........................................................................................................................ 13 21) Site Chart ............................................................................................................................................... 13 22) WTG Coordinates in LAT and LON.................................................................................................... 14

Transcript of Weekly Notice of Operations (WNoO) - The south coast's ...

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 1 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

Contents

1) Notice to Mariners (NtM) (Active) ......................................................................................................... 2

2) Hazards/Mitigation for Project Vessels and PAX ............................................................................... 3

3) WTG Installation Vessel ............................................................................................................................. 4

4) Array cable burial Vessel ........................................................................................................................... 4

5) Hotel vessel ............................................................................................................................................... 4

6) Substation works ....................................................................................................................................... 5

7) Export Cable Vessel ................................................................................................................................... 5

8) Survey Vessel ............................................................................................................................................. 5

9) Installation Vessels Fibre Optic Cable ........................................................................................................ 6

10) Guard Vessels ............................................................................................................................................ 7

11) Crew Transfer Vessels ................................................................................................................................ 7

12) Upcoming Operations (following 7 days) ............................................................................................ 9

13) Summary of Operations (previous 7 days) ....................................................................................... 10

14) Looking further ahead (beyond 7 days) (new activities starting) ................................................... 10

15) Project Met mast details....................................................................................................................... 11

16) Project Wave Rider ............................................................................................................................... 11

17) As Laid Cardinal Buoy Positions ........................................................................................................ 11

18) Contact details ....................................................................................................................................... 11

19) Export Cable Coordinates ................................................................................................................... 12

20) Flotel Anchorage Position ........................................................................................................................ 13

21) Site Chart ............................................................................................................................................... 13

22) WTG Coordinates in LAT and LON .................................................................................................... 14

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 2 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

WNoO application:

- Issued weekly by the ROW Project Marine Co-ordination Team - Notice to Mariners (NtM) will be issued for any unplanned/unmarked navigational hazards

introduced by the project within our area of operation

1) Notice to Mariners (NtM) (Active)

Secretary of State has approved our application for statutory Safety Zones (08/03/16) during the construction of the Rampion Wind Farm. These Safety Zones are defined as:

• 500m around all structures (where construction vessels are present) • 50m around all structures (whilst personnel are working on them) including the offshore substation.

All project vessel masters and 3rd party sea users are requested to remain a minimum safe distance of 500m around each vessel. Project vessels are to keep a sharp lookout (Radar/AIS and visual) for non-project vessels entering these zones and report to Duty MC via VHF P1 ASAP.

Notice to Mariners Ref.

Date of Issue Activity (Vessel in brackets) Status of

Works Expected close out

ROWF NTM001

15/12/2015 ROWF Cardinal as Laid Positions Ongoing June 2018

ROWF NTM009

10/03/2016 Approval of Safety Zones Ongoing June 2018

ROWF NTM016

27/05/2016 Installation Rock Pads Ongoing June 2018

ROWF NTM017

24/06/2016 Installation Rock Pads Round 2 Ongoing June 2018

ROWF NTM032 28/09/2016 Revised Project Wave Rider

Positions Ongoing June 2018

ROWF NTM049

09/02/2017 Safe distances of all structures within Rampion Offshore Wind

Ongoing Until further notice

ROWF NTM056

28/03/2017 Revised Export Cable Hazards Ongoing Until further notice

ROWF NTM057

28/03/2017 Inter Array cables shallow buried/exposed cable hazards

Ongoing Until further notice

ROWF NTM 064

09/05/2017 Export cable ROV Surveys Ongoing 20/06/17

ROWF NTM 065

17/05/2017 Main Array Hazard Area Ongoing August 2017

ROWF NTM 068

20/06/2017 Installation of Fibre Optic cables Planned 30/07/17

ROWF NTM 069

07/07/2017 Offshore Export cable jointing Planned 30/08/2017

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 3 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

2) Hazards/Mitigation for Project Vessels and PAX

• GSK pipeline o 30m Safety Zone either side of the GSK pipeline situated to the East of the export cable

corridor. No project vessels will be permitted to enter this safety zone without prior permission by the Duty MC

• Redundant sewage outfall pipeline o 30m Safety Zone either side of the redundant sewage outfall pipeline to the west of the

cable route • Fishing gear

o All Vessels to keep a sharp lookout and report any fishing gear to duty MC who will in turn distribute information to all other project vessels.

o All vessels to operate appropriately where the hazard of fishing gear exists • Fishing vessels

o Standing order for all project vessels to pass at a safe distance. • Dive Vessels/Divers

o Standing order for all project vessels to pass at a safe distance o Specifically, if any vessel is present over a known dive site, project vessels are to pass a

minimum of 1NM uptide. • Scour protection and exposed cables on sea bed around foundations

o Guard vessel in operation o Co-ordinates disseminated to FLOs

• Subsea cables (buried, shallow buried and surface laid). o All project vessels to keep a sharp lookout for third party sea users venturing near subsea

cables laid on sea bed. Report any such instances to Traffic ASAP. Special consideration of the exposed cable at the jointing location (50 42.97’N, 000 17.88’W) and to the east of the Offshore Substation.

• Drift Netting o Project vessels to operate accordingly during transits in darkness with regard to the

commencement of the drift net season

Refer to Documents RAM-ERA-SMG-SAF-0001_00 (Guidelines for CTV operators on specific hazards) • Ensure all project vessels have latest Office Site Chart (Check with Duty MC for latest Rev)

W

eekly Notice of O

perations (WN

oO)

Ram

pion Offshore W

ind Farm Lim

ited Construction O

perations Issue D

ate: 20/07/2017 RA

M-E

RA

-LOG

-NO

T-0001_79 - Weekly N

otice of Operations

Page 4 of 14

“Ram

pion Offshore W

ind is owned by E. O

N, U

K G

reen Investment B

ank and Enbridge”

Nam

e Flag

Call Sign/MM

SI Contact

Info L (m

) B (m

) D (m

) GT (t)

Contractor Status (Start)

Picture

3) W

TG Installation Vessel

MPI Discovery

NL

PCFF/246741000 VHF

CH16/P1 138

40 5.9

19533 Eon

WTG Installation Start

01/03/2017

MPI Adventure

NL

PCKV/245924000 VHF

CH16/P1 136.4

40 5.4

19533 Eon

WTG Installation Start

08/06/2017

4) Array cable burial Vessel

Fugro Saltire BS

LOD/258401000

VHF CH16/P1

111 24

6.1 9603

Fugro Array Cable Burial start 2

nd phase 22/05/2017

5) Hotel vessel

Wind Solution

UK

2AR07/235062382 VHF

CH16/P1 122

19 5.1

8893 Eon

Flotel Start 25/04/2017

W

eekly Notice of O

perations (WN

oO)

Ram

pion Offshore W

ind Farm Lim

ited Construction O

perations Issue D

ate: 20/07/2017 RA

M-E

RA

-LOG

-NO

T-0001_79 - Weekly N

otice of Operations

Page 5 of 14

“Ram

pion Offshore W

ind is owned by E. O

N, U

K G

reen Investment B

ank and Enbridge”

Nam

e Flag

Call Sign/MM

SI Contact

Info L (m

) B (m

) D (m

) GT (t)

Contractor Status (Start)

Picture

6) Substation w

orks

Pacific Osprey

CY 5BU

F3/210286000 VHF

CH16/P1 161.3

49.03 5.1

24586 Eon

Substation jack up start 15/05/17 till O

ctober 17

7) Export Cable Vessel

NP289

(NL)

PCBG/244750587 VHF

CH16/P1 80

28 2.3

4102 VBM

S Jointing of Export Cable

Start 10/07/17

Bever (N

L) PDAA/244536000

VHF CH16/P1

35.6 11.6

4.3 607

VBMS

Support Tug for NP289

Sir Jeske B (N

L) PDCJ/244870247

VHF CH16/P1

239 24

8 78

VBMS

Support Tug for NP289

8) Survey Vessel

RRV Audrey (U

K) 2CTN

7/235075634 VHF

CH16/P1 13

6 1.1

13.5 Turbine Transfers

Survey’s. Working out of

Brighton Start 01/11/2016

W

eekly Notice of O

perations (WN

oO)

Ram

pion Offshore W

ind Farm Lim

ited Construction O

perations Issue D

ate: 20/07/2017 RA

M-E

RA

-LOG

-NO

T-0001_79 - Weekly N

otice of Operations

Page 6 of 14

“Ram

pion Offshore W

ind is owned by E. O

N, U

K G

reen Investment B

ank and Enbridge”

Nam

e Flag

Call Sign/MM

SI Contact

Info L (m

) B (m

) D (m

) GT (t)

Contractor Status (Start)

Picture

9) Installation Vessels Fibre O

ptic Cable

Husky

(UK)

2EQ17/235087309

VHF CH16/P1

21.59 6,51

2.6 72

GMSL

Excavation works

Start 29-06-2017

Beluga (N

L) N

A VHF

CH16/P1 45.11

17.07 2.9

700 GM

SL Excavation w

orks Start 29-06-2017

MPTI Trifaldi

(UK)

2HFK6/235103214 VHF

CH16/P1 19

8 1.3

46 GM

SL Guard Vessel for Beluga

START 18-07-2017

CRC Argosy (U

K) 2IHL8/235109792

VHF CH16/P1

9 3.1

0.8 3.8

GMSL

Crew change Vessel for

Beluga

C-Fenna (U

K) M

BAH3/232008023 VHF

CH16/P1 24.68

11 2.7

255 GM

SL Dive Support

Start 08-07-2017

Phoenix (U

K) 2IU

R3/235112943 VHF

CH16/P1 14

5 0.8

36 GM

SL Crew

Change vessel for C-Fenna

Start 16-07-2017

CS Recorder (U

K) M

ATL3/232007052 VHF

CH16/P1 105.5

20 6.2

6292 GM

SL N

earshore cable lay Start 12-07-2017

Jif Challenger (FR)

FIYA/228074700 VHF

CH16/P1 34

14 3.1

499 GM

SL N

earshore cable lay Start 10-07-2017

W

eekly Notice of O

perations (WN

oO)

Ram

pion Offshore W

ind Farm Lim

ited Construction O

perations Issue D

ate: 20/07/2017 RA

M-E

RA

-LOG

-NO

T-0001_79 - Weekly N

otice of Operations

Page 7 of 14

“Ram

pion Offshore W

ind is owned by E. O

N, U

K G

reen Investment B

ank and Enbridge”

Nam

e Flag

Call Sign/MM

SI Contact

Info L (m

) B (m

) D (m

) GT (t)

Contractor Status (Start)

Picture

10) Guard Vessels

Choice (U

K) M

YYW2 /235078077

VHF CH16/P1

24. 6.0

3.5 122

Choice Marine

Guard Boat Duties 24/7

Comm

odore P (U

K) 2GIR2/235097729

VHF CH16/P1

18 6

0.9 27

Offshore Turbine

Services Fast Response Guard

Vessel Start 24/04/2017

11) Crew

Transfer Vessels

Rix Tiger (U

K) 2GGY4/235097309

VHF CH16/P1

19 9

1.8 42

Rix Sea Shuttle CTV and Ad-hoc Inspections W

orking out of New

haven Start 01/08/2016

Rix Panther (U

K) 2FRT9/235093688

VHF CH16/P1

19 8

1.5 42

Rix Sea Shuttle CTV and Ad-hoc Inspections W

orking out of New

haven Start 15/03/2016

Windcat 6

(UK)

MXFD/235057789

VHF CH 16/P1

16 6

2 40

Windcat

Site CTV W

orking out of New

haven

W

indcat 10 (U

K) 2BAN

2/235064453 VHF

CH16/P1 22

6 2

36 W

indcat Bolt Tensioning CTV

Working out of N

ewhaven

Start 29/07/2016

Windcat 17

(UK)

2BYDS/235070402 VHF

CH16/P1 18

6 2.5

35 W

indcat M

VOW

WTG Com

missioning

Start 19/09/2016

Windcat 19

(UK)

2CUS9/235075935

VHF CH16/P1

22 6.5

1.9 40

Windcat

MVO

W W

TG Comm

issioning Start 06/03/2017

W

eekly Notice of O

perations (WN

oO)

Ram

pion Offshore W

ind Farm Lim

ited Construction O

perations Issue D

ate: 20/07/2017 RA

M-E

RA

-LOG

-NO

T-0001_79 - Weekly N

otice of Operations

Page 8 of 14

“Ram

pion Offshore W

ind is owned by E. O

N, U

K G

reen Investment B

ank and Enbridge”

Nam

e Flag

Call Sign/MM

SI Contact

Info L (m

) B (m

) D (m

) GT (t)

Contractor Status (Start)

Picture

Porth Eilian (U

K) 2GN

X8/235099056 VHF CH 16/P1

18 8

1.9 55

Turbine Transfers W

TG M&

E completion Start

11/03/2017

Windcat 22

(UK)

2CUS9/235075935

VHF CH16/P1

22 6.5

2.1 40

Windcat

Bolt Tensioning CTV W

orking out of New

haven Start 11/01/2016

Njord Snipe

(UK)

2HGH2/235103431 VHF

CH16/P1 20

8 1.8

65 N

jord Offshore

Terminations Package

Working out of N

ewhaven

Start 26/09/2016

Sure Pride

(U

K)

2FUM

/235094357

VHF CH 16/P1

20

8

2

67

Surew

ind

W

TG Comm

issioning Start 15/05/2017

Gaillion (U

K) 2EO

N7/235086878

VHF CH 16/P1

19 8

1.8 60

Gardline O

SP CTV W

orking out of New

haven Start 16/07/2017

Porth Nefyn

(UK)

2IRQ8/235112231

VHF CH16/P1

19 8

1.6 48.1

Turbine Transfers W

TG M&

E completion

Start 07/04/2017

Sure Pilgrim

(UK)

2GEJ9/235096669 VHF

CH 16/P1 20

8 2

67 Surew

ind W

TG Comm

issioning Start 06/03/2017

Dalby Swale

(UK)

2HNA5 /235104985

VHF CH 16/P1

23 7

1.2 67

VBMS

Assisting Export cable Vessels

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 9 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

12) Upcoming Operations (following 7 days)

Operation Location Vessel Operational Notes

WTG Installation

Load out 9:

B08,A09,A10,C10,D10,C11,D11,I15 MPI Discovery

Installing

Load Out 9

WTG Installation

Load out 10: D12,E12,F12,D13,E13,F13,D09,E10 MPI Adventure In Esbjerg Load out

10

Array Cable Terminations F11,E09,O09,G05,F04,F05,

Rix Panther Njord Snipe

Operations are due to be completed by September 2017

Array Cable Burial

OSP-E08,D13-E13,F13-OSP,F13-F12,D13-E14,G15-H15,E13-F13,G15-OSP

Fugro Saltire

Operations due to commence 22/05/17

till end of August

Export cable joint KP11 Export cable joint

NP289 Tug Bever

Dalby Swale Operations On Going

WTG M&E completion/

commissioning

I07,L08,J08,I08,L07,I05,M10,N09,N10,F06,N06O07,M09,F15

Windcat 19, Windcat 17, Sure Pilgrim, Sure Pride, Porth Nefyn

Ongoing

Servicing / Snagging /

Crew Change All Locations Windcat 10

Rix Tiger

Inspection Snagging Painting cleaning

Foundation Bolt tensioning D13,G10,B10,B09,C09,B07,K06 Windcat 22 Ongoing due to

complete end July 17

Project Guard vessels Site 24hr Guard Vessels

Choice, Commodore P,

Guarding Windfarm and Export cable

route

OSS works Offshore sub station Gaillion ongoing

OSS Flotel Accommodation jack up vessel Pacific Osprey East of OSP

Survey Multibeam Surveys Audrey

Ongoing operations until end of construction Start Sept 16

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 10 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

Flotel Anchored outside field Anchorage No 5 Wind Solution Start 26/04/2017

Fibre Optic cable

installation Export cable route CS recorder

Jiff Challenger Start10/07/17

Dive works OSP FO cable

installation OSP

Fenna C CRC

Island Phoenix

Installation of J tubes and cable clamps

Start 06/07/17

Nearshore excavations

FO cable Beach to KP 4.5

MPI Trifaldi Beluga Husky

CRC Argosy

Ongoing due to complete by end of

July 17

All Mariners Operating in the Vicinity of Rampion Offshore Wind Farm are advised to familiarise themselves with MGN 372

https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/440734/MGN_372.pdf

13) Summary of Operations (previous 7 days)

• Guard vessel offshore 24/7 • Completed Array Cable installation • WTG installation • MVOW mechanical completions. • Ongoing surveys • Terminations • Bolting • Palfinger works • OSP Commissioning • Pacific Osprey OSP commissioning

14) Looking further ahead (beyond 7 days) (new activities starting)

• Installation of Fibre optic cable

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 11 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

15) Project Met mast details

• The current lattice structure has failed and will be replaced in due course. • Currently on the sea bed at coordinates below:

ID Latitude Longitude

Met mast 50°41.287'N 0°20.594'W

16) Project Wave Rider

17) As Laid Cardinal Buoy Positions

Cardinal Name Light Signature Deployed Latitude Deployed Longitude

North 1(AIS) Q 50° 41.377’N 0° 21.898’W

North 2 V Q 50° 42.072’N 0° 17.098’W

North 3 (AIS) Q 50° 42.771’N 0° 12.286’W

East 1 Q (3) 10s 50° 41.050’N 0° 11.311’W

South 1(AIS) Q (6) + L Fl 15s 50° 39.172'N 0° 11.363'W

South 2 V Q (6)+L Fl 10s 50° 38.398’N 0° 16. 147’W

South 3 (AIS) Q (6) + L Fl 15s 50° 37.631’N 0° 20.931’W

West 1 Q (9) + 15s 50° 39.439’N 0° 21.930’W

18) Contact details Marcus Moore Offshore Site Manager Tel: +44 (0) 7447 013684 Email: [email protected] Gordon Bain Lead Marine Coordinator Tel: +44 (0) 7816 648082 Email: [email protected]. Duty Marine Coordinator Tel: +44 (0) 7557 942945 Email: [email protected]

ID Latitude Longitude Status Wave Rider No1 50o 41.675’ N 000o 16.299’ W As Laid

Wave Rider No2 50o 40.219’ N 000o 12.949’ W As Laid

Wave Rider No3 50o 39.037’ N 000o 19.644’ W As Laid

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 12 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

19) Export Cable Coordinates

East Export Cable Route West Export Cable Route

LATITUD LONGITUD KP LATITUD LONGITUD KP50° 49.0411453' N 0° 20.1491986' W 0 50° 49.0392569' N 0° 20.1559728' W 050° 49.0383954' N 0° 20.1471673' W 0.006 50° 49.0365229' N 0° 20.1541776' W 0.00550° 48.8450241' N 0° 20.0043473' W 0.401 50° 48.8321138' N 0° 20.0213010' W 0.41550° 48.5435783' N 0° 19.7817419' W 1.019 50° 48.5312412' N 0° 19.8257254' W 1.01950° 47.5754360' N 0° 19.0671645' W 3 50° 47.5283632' N 0° 19.1741222' W 3.0350° 47.0619271' N 0° 18.8052062' W 4.001 50° 46.9242174' N 0° 18.9365803' W 4.18450° 46.7959655' N 0° 18.7318572' W 4.502 50° 46.8710244' N 0° 18.9223825' W 4.28450° 46.6611182' N 0° 18.7172942' W 4.752 50° 46.5838764' N 0° 18.8887138' W 4.81850° 46.1228324' N 0° 18.7778840' W 5.753 50° 46.0611405' N 0° 18.9565559' W 5.79150° 45.4028104' N 0° 18.9771812' W 7.108 50° 45.4302627' N 0° 19.1313961' W 6.97850° 45.3447367' N 0° 18.9859594' W 7.216 50° 45.3274051' N 0° 19.1548573' W 7.17150° 45.2907955' N 0° 18.9871717' W 7.316 50° 45.1830551' N 0° 19.1582731' W 7.43950° 45.2264755' N 0° 18.9803895' W 7.436 50° 45.0807508' N 0° 19.1340815' W 7.63150° 43.8545862' N 0° 18.5755551' W 10.024 50° 44.4092272' N 0° 18.9209074' W 8.90150° 43.5353821' N 0° 18.4567545' W 10.632 50° 44.2370203' N 0° 18.8760834' W 9.22550° 43.4067649' N 0° 18.3879768' W 10.884 50° 43.7399867' N 0° 18.7176892' W 10.16550° 43.3218335' N 0° 18.3272998' W 11.057 50° 43.4531794' N 0° 18.5891475' W 10.71850° 43.2482600' N 0° 18.2567879' W 11.216 50° 43.3127411' N 0° 18.5123192' W 10.99450° 43.2046700' N 0° 18.2066487' W 11.316 50° 43.2634912' N 0° 18.4778397' W 11.09450° 43.0451085' N 0° 17.9882516' W 11.708 50° 43.2007868' N 0° 18.4231791' W 11.22750° 42.8969501' N 0° 17.7661912' W 12.088 50° 43.1559313' N 0° 18.3757412' W 11.32750° 42.4324193' N 0° 16.8658103' W 13.453 50° 42.8176502' N 0° 17.8872884' W 12.17950° 41.9317806' N 0° 15.9784611' W 14.851 50° 42.4145324' N 0° 17.1150045' W 13.35650° 41.7220852' N 0° 15.6528737' W 15.397 50° 41.9242877' N 0° 16.2156689' W 14.75250° 41.7133732' N 0° 15.6394384' W 15.42 50° 41.6643728' N 0° 15.6559910' W 15.56850° 41.7133732' N 0° 15.6394384' W 15.42 50° 41.6643728' N 0° 15.6559910' W 15.56850° 41.6218602' N 0° 15.5819279' W 15.602 50° 41.6269395' N 0° 15.6136011' W 15.65450° 41.6218602' N 0° 15.5819279' W 15.602 50° 41.6269395' N 0° 15.6136011' W 15.65450° 41.5681136' N 0° 15.5889815' W 15.702 50° 41.5677536' N 0° 15.5919882' W 15.766

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 13 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

20) Flotel Anchorage Position

21) Site Chart

ID Latitude Longitude

New Anchorage Position 2 50o 42.690’ N 000o 10.539’ W

Weekly Notice of Operations (WNoO)

Rampion Offshore Wind Farm Limited Construction Operations

Issue Date: 20/07/2017 RAM-ERA-LOG-NOT-0001_79 - Weekly Notice of Operations

Page 14 of 14

“Rampion Offshore Wind is owned by E. ON, UK Green Investment Bank and Enbridge”

22) WTG Coordinates in LAT and LON