WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 ...€¦ · Week of 3/09/20 Project: Maple...

3
WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 Project: Maple Elementary / Middle School Submission Date: 3/13/2020 To: Maple Elementary – Middle School To: Caolo & Bieniek Associates Building Committee Tom Brown Bert Gardner 50 Payson Avenue 521 East Street Easthampton, MA 01027 Chicopee, MA 01020 Construction Representative: Matt Dunn Project Phone: (Cell) Email Address: Project Fax: Fax # Project Address: 200 Park Street Easthampton, MA 01027 Project Activity Summary: GENERAL Poured 151 CY of concrete for the footings for the north wall of Building B. Formed and placed some rebar for footings of west and south walls of Building B. Relocated Press Box over near River Valley Way. SITE Excavated footing trench for south wall of Building B and SW corner Building A. Installed Sewer Manholes 307, 304 & piping connecting them. Continued piping to NE. Dug-out hillside adjacent to the SE corner of practice football field. Continued to build-up the grade of the school footprint wherever it is dry. Placed fill at rotary area. Removed 55 LF of transite pipe from field. Attachments: Photos

Transcript of WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 ...€¦ · Week of 3/09/20 Project: Maple...

Page 1: WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 ...€¦ · Week of 3/09/20 Project: Maple Elementary / Middle School Submission Date: 3/13/2020 To: Maple Elementary – Middle

WEEKLY CONSTRUCTION PROGRESS REPORT

Week of 3/09/20

Project: Maple Elementary / Middle School Submission Date: 3/13/2020

To: Maple Elementary – Middle School To: Caolo & Bieniek Associates

Building Committee

Tom Brown Bert Gardner

50 Payson Avenue 521 East Street

Easthampton, MA 01027 Chicopee, MA 01020

Construction Representative: Matt Dunn Project Phone: (Cell)

Email Address: Project Fax: Fax #

Project Address: 200 Park Street

Easthampton, MA 01027

Project Activity Summary:

GENERAL

• Poured 151 CY of concrete for the footings for the north wall of Building B.

• Formed and placed some rebar for footings of west and south walls of Building B.

• Relocated Press Box over near River Valley Way.

SITE

• Excavated footing trench for south wall of Building B and SW corner Building A.

• Installed Sewer Manholes 307, 304 & piping connecting them. Continued piping to NE.

• Dug-out hillside adjacent to the SE corner of practice football field.

• Continued to build-up the grade of the school footprint wherever it is dry.

• Placed fill at rotary area.

• Removed 55 LF of transite pipe from field.

Attachments: Photos

Page 2: WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 ...€¦ · Week of 3/09/20 Project: Maple Elementary / Middle School Submission Date: 3/13/2020 To: Maple Elementary – Middle

WEEKLY CONSTRUCTION PROGRESS REPORT

Week of 3/09/20

DIGGING-OUT HILL ADJACENT TO THE PRACTICE FIELD FIRST CONCRETE POUR BUILDING B NORTH WALL

CURRENT GRADE AT ROTARY TYPICAL FOOTING STEEL AND CONCRETE

Page 3: WEEKLY CONSTRUCTION PROGRESS REPORT Week of 3/09/20 ...€¦ · Week of 3/09/20 Project: Maple Elementary / Middle School Submission Date: 3/13/2020 To: Maple Elementary – Middle

WEEKLY CONSTRUCTION PROGRESS REPORT

Week of 3/09/20

ON ITS WAY TO A TEMPORARY HOME

SEWER MANHOLE SMH 304 IN PLACE AND PIPED BUILDING B NORTH WALL FOOTING BACKFILL