Project: Maple Elementary / Middle School Submission Date: 3/13/2020
To: Maple Elementary – Middle School To: Caolo & Bieniek Associates
Building Committee
Tom Brown Bert Gardner
50 Payson Avenue 521 East Street
Easthampton, MA 01027 Chicopee, MA 01020
Construction Representative: Matt Dunn Project Phone: (Cell)
Email Address: Project Fax: Fax #
Project Address: 200 Park Street
Easthampton, MA 01027
Project Activity Summary:
GENERAL
• Poured 151 CY of concrete for the footings for the north wall of Building B.
• Formed and placed some rebar for footings of west and south walls of Building B.
• Relocated Press Box over near River Valley Way.
SITE
• Excavated footing trench for south wall of Building B and SW corner Building A.
• Installed Sewer Manholes 307, 304 & piping connecting them. Continued piping to NE.
• Dug-out hillside adjacent to the SE corner of practice football field.
• Continued to build-up the grade of the school footprint wherever it is dry.
• Placed fill at rotary area.
• Removed 55 LF of transite pipe from field.
Attachments: Photos
WEEKLY CONSTRUCTION PROGRESS REPORT
Week of 3/09/20
DIGGING-OUT HILL ADJACENT TO THE PRACTICE FIELD FIRST CONCRETE POUR BUILDING B NORTH WALL
CURRENT GRADE AT ROTARY TYPICAL FOOTING STEEL AND CONCRETE
WEEKLY CONSTRUCTION PROGRESS REPORT
Week of 3/09/20
ON ITS WAY TO A TEMPORARY HOME
SEWER MANHOLE SMH 304 IN PLACE AND PIPED BUILDING B NORTH WALL FOOTING BACKFILL