Week 5 Electrical Three Phase
-
Upload
iqram-meon -
Category
Documents
-
view
218 -
download
0
Transcript of Week 5 Electrical Three Phase
-
8/2/2019 Week 5 Electrical Three Phase
1/123
Construction Measurement III(SBQ 3314)
Electrical Installations Three Phase
Lecture By Dr Sarajul Fikri Mohamed
Department of Quantity Surveying, FAB, UTM Skudai Johor, Malaysia
12 January 2010
-
8/2/2019 Week 5 Electrical Three Phase
2/123
Pre-cast and Pre-stressed ConcreteCIVIL WORKS
Electrical Installations
Fire Fighting Installations
Air Conditioning Installations
Unit/Split Package/Central
Landscape Works
Single Phase Three Phase
Gas Installations
ELECTRICAL WORKS
MECHANICAL WORKS
LANDSCAPE WORKS
Hard Landscape Soft Landscape
MAIN COURSE COMPONENTS
-
8/2/2019 Week 5 Electrical Three Phase
3/123
2009 Sarajul Fikri Mohamed
1. Electrical installations: main components
2. SMM2 measurement rules for electrical installations: three phase
3. Taking off list for electrical installations: three phase
4. Heading and description.
5. Case study: CADANGAN MEMBINA DEWAN SERBAGUNA TAMAN
KOTA JAYA, KOTA TINGGI, JOHOR
6. Studio work
Table of contents
ELECTRICAL INSTALLATIONS: THREE PHASE
-
8/2/2019 Week 5 Electrical Three Phase
4/123
2009 Sarajul Fikri Mohamed
Electrical installation
and components
-
8/2/2019 Week 5 Electrical Three Phase
5/123
Electrical distribution
ELECTRICAL INSTALLATIONS
Power transmission and distributions
-
8/2/2019 Week 5 Electrical Three Phase
6/123
Types of electrical work
ELECTRICAL INSTALLATIONS
Two options
-
8/2/2019 Week 5 Electrical Three Phase
7/123
Voltan yang dikenakan ialah 415 v dan juga boleh mencecah 880 v bagikilang yang menjalankan kerja berat seperti kilang besi dan kilang simen.
Ia mempunyi tiga pengalir hidup dan neutral.
Pengalir-pengalir hidup dikenalkan dengan kod-kod aksara berikut:
LI atau R (red): Fasa pertama
L2 ataU Y (yellow): Fasa kedua
L3 atau B (blue) : Fasa ketiga
Single and three phase
ELECTRICAL INSTALLATIONS
Bagi penggunaan rumah kediaman, voltan tiga fasa adalah terlalu tinggi dan
merbahaya.
Oleh itu voltan rendah daripada satu fasa lebih sesuai digunakan untuk tujuan
domestik.
Voltan piawai satu fasa ialah 240 v. Biasanya satu pengalir hidup digunakanbersama pengalir neutral iaitu:
RN
YN
BN
Three Phase
Single Phase
-
8/2/2019 Week 5 Electrical Three Phase
8/123
2009 Sarajul Fikri Mohamed
INCOMING SERVICES
MAIN INSTALLATION
POWER INSTALLATION
LIGHTING INSTALLATION
CABLES
Main components
ELECTRICAL INSTALLATIONS
ELECTRICAL APPLIANCES
CONDUIT AND FITTING
LIGHTNING PROTECTION SYSTEM
TESTING
-
8/2/2019 Week 5 Electrical Three Phase
9/123
Electrical distribution
ELECTRICAL INSTALLATIONS
INCOMING SERVICES
MAIN INSTALLATION
POWER INSTALLATION
LIGHTING INSTALLATION
ELECTRICAL APPLIANCES
FINAL SUB-CIRCUIT
CABLE
CONDUIT
LIGHTNING PROTECTION
TESTING
-
8/2/2019 Week 5 Electrical Three Phase
10/123
POWER
INSTALLATION
LIGHTING
INSTALLATION
ELECTRICAL
APPLIANCES
3 pin switch socket Fluorescent light
Wall light
EXIT sign
High bay light
EL light
Exhaust fan
Sweep ceiling fan
CONDUIT &
FITTING
CABLES TESTING
Chased into brickwallCeiling level
2x1c/2.5mm PVC cable2x1c/1.5mm PVC cable
On completion of the electricalinstallation test all switches, switch
socket, wiring etc and make good
all defects an leave everything
perfect working order to the
satisfaction of the S.O and TNB
Main components
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
11/123
Electrical typical legend in M&E drawings
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
12/123
2009 Sarajul Fikri Mohamed
SMM2 measurement
rules
-
8/2/2019 Week 5 Electrical Three Phase
13/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
14/123
14
Clause Description
R4-R5 Equipments and Control Gear
R6-R8 Fittings and Accessories
R9-R13 Conduits, trunking and cable tray
R14-R17 Cabling
R18 Final Sub-circuits
R19 Earthing
R20-R21 Ancillaries
R22 Sundries
R23-R24 Builders Work
Related SMM2 clauses
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
15/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
16/123
ELECTRICAL INSTALLATIONS
THREE PHASE
PEMASANGAN ELEKTRIK UNTUK SEBUAH
BLOK HEMODIALYSIS DI HOSPITAL TANGKAK,
MUAR JOHOR
FOR
JKR (ELEKTRIK) NEGERI JOHOR
Fakulti Alam Bina
-
8/2/2019 Week 5 Electrical Three Phase
17/123
SPNDB LMCCB
SUB SWITCHBOARD
100ATPNMCCB
TPNDBP
EARTHING SYSTEM
-
8/2/2019 Week 5 Electrical Three Phase
18/123
LOKASIBILIK SUIS
BILIK SUIS
-
8/2/2019 Week 5 Electrical Three Phase
19/123
ELEMENT: ELECTRICAL SERVICES ubb/N/01
BIL UNIT KUANTITI
A Preamble
B
M 3.05
M 3.05
C
M 1.00
M 1.00
To Collection
All quantities in this bill are provisional quantities
subject to remeasurement upon construction of the
said item. The tenderer must allow for testing the
electrical installation and handling over of test
certificate to S.O.
Incoming Services-Externally (All Provisional)
25mm x 25mm Telekom PVC trunking from lightingarrestors run at high level and drops to computer
server.
100mm UPVC class 'D' pipe complete with long
bend extended beyond drain for entry of TNB,
incoming cable to MSB inclusive of excavation and
backfilling.
4 x 25mm pilestas (AC) cable in UPVC class 'D'
pipe (m/s) buried underground to TNB panel.
75mm x 38mm electrical trunking from meter to
DB/M3B.
Incoming Services-Internally (All Provisional)
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Selangor.
KETERANGAN HARGA
(RM)
JUMLAH
(RM)
INCOMING SERVICES -
EXTERNALLY
INCOMING SERVICES -
INTERNALLY
-
8/2/2019 Week 5 Electrical Three Phase
20/123
R.2 CLASIFICATION OF WORK
a. Incoming servicesb. Standby equipmentc. Mains installation-switch gears, sub-main cables.
d. Power installatione. Lighting installationf. Heating installationg. Electrical appliancesh. Electrical work
k. Clock installation
I. Sound distribution
m. Alarm systemn. Earthing system installation
p. Lightning protection installation
q. Special services
r. Any other installation
s. Trunking, ducting and cable trays
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
21/123
LOCATION OF ELECTRICAL WORKS
R3 - Location of work
a. Internallyb. Externally
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
22/123
ITEM DESCRIPTION UNIT
POWER INSTALLATION
(INTERNALLY)
Cable
A2 x 1C-2.5mm2 PVC insulated colour coded
cable as specified drawn into conduit.
M
Cl R.2.1(d)
Classification of work
Cl R.3.1(a)
Location of Work
Cl R.14.2
Generally
Cl R.15.2(a)
Cables
-
8/2/2019 Week 5 Electrical Three Phase
23/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
24/123
EQUIPMENT AND CONTROL GEAR (NO)
R4 Equipment (generator, motors)
Control gear (isolator, switch fuses)
Packaged item described with a manufacturers detail.
Limiting dimension on size shall be given.
Connecting cable ends or cable tails shall be deemed to be
included with the item.
Platework and supporting steelwork Section P.
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
25/123
SPNDB LMCCB
SUB SWITCHBOARD
100ATPNMCCB
TPNDBP
EARTHING SYSTEM
-
8/2/2019 Week 5 Electrical Three Phase
26/123
WALL MOUNTED SUB
SWITCH BOARD
MAIN SWITCH C/W
INDICATOR LIGHTS
ELEMENT: ELECTRICAL SERVICES ubb/N/02
BIL UNIT KUANTITI
D
NO 1
NO 1
NO 1
E
NO 2
NO 2
NO 4
To Collection
Mains Installation-Internally (All Provisional)
Metal clad main switch board of wall mounted floor
standing type model no. 3b and including 60A/100A
TPN cut-off fuse C/W neutral link, 75A TPN MCCB
and surge protector and all associated accessories.
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Selangor.
KETERANGAN HARGA
(RM)
JUMLAH
(RM)
4 nos 13A 3pin switch socket outlets mounted under
of table complete with 2 x 2.5mm/1C PVC in
concealed UPVC trunking.
Wall mounted metal clad distribution board inclusive
60A TPN MCCB, 60A TPN current-operated 300mA
ELCB comprising 17 nos of 30A MCB, 5 nos of 20A
MCB, 6 nos aircond point and all associated
accessories.
PowerInstallation-Internally (All Provisional)
Wall mounted metal clad distribution board inclusive
30A SPN MCB, 30A SPN current-operated 100mA
ELCB comprising of 13 nos 6A MCB and all
associated accessories.
3 nos 13A 3pin switch socket outlets mounted
300mm from first floor level complete with 2 x
2.5mm/1C PVC in concealed UPVC trunking.
4 nos 13A 3pin switch socket outlets mounted
300mm from first floor level complete with 2 x
2.5mm/1C PVC in concealed UPVC trunking.
-
8/2/2019 Week 5 Electrical Three Phase
27/123
To monitor and record the total amount of electrical
energy that is being consumed for the purpose of
charging consumers through the issuance of
electricity bills .
Property of TNB
2 types of meter
Analog
Digital
METERING BOARD
TNB CUT OUT FUSE
Consumers back up protection 2 purposes:
As a measure of back up protection to the fuse in theDistribution Board and also ELCB As mean of cutting of electrical supply to the consumers
when required Cutout fuse is connected to live wire and it is use to
control current supply. Both belong to TNB.
-
8/2/2019 Week 5 Electrical Three Phase
28/123
DISTRIBUTIONBOARD
ELEMENT: ELECTRICAL SERVICES ubb/N/02
BIL UNIT KUANTITI
D
NO 1
NO 1
NO 1
E
NO 2
NO 2
NO 4
To Collection
Mains Installation-Internally (All Provisional)
Metal clad main switch board of wall mounted floor
standing type model no. 3b and including 60A/100A
TPN cut-off fuse C/W neutral link, 75A TPN MCCB
and surge protector and all associated accessories.
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Selangor.
KETERANGAN HARGA
(RM)
JUMLAH
(RM)
4 nos 13A 3pin switch socket outlets mounted under
of table complete with 2 x 2.5mm/1C PVC in
concealed UPVC trunking.
Wall mounted metal clad distribution board inclusive
60A TPN MCCB, 60A TPN current-operated 300mA
ELCB comprising 17 nos of 30A MCB, 5 nos of 20A
MCB, 6 nos aircond point and all associated
accessories.
PowerInstallation-Internally (All Provisional)
Wall mounted metal clad distribution board inclusive
30A SPN MCB, 30A SPN current-operated 100mA
ELCB comprising of 13 nos 6A MCB and all
associated accessories.
3 nos 13A 3pin switch socket outlets mounted
300mm from first floor level complete with 2 x
2.5mm/1C PVC in concealed UPVC trunking.
4 nos 13A 3pin switch socket outlets mounted
300mm from first floor level complete with 2 x
2.5mm/1C PVC in concealed UPVC trunking.
-
8/2/2019 Week 5 Electrical Three Phase
29/123
Excess current protection
MINIATURE CIRCUITBREAKERS (MCB)
An electromechanical or electro thermal devices which break the circuit in the caseof excess current It will cut off any faulty circuit immediately Sensitive to lightning 2 types of excess current protection:
Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB
MCB
-
8/2/2019 Week 5 Electrical Three Phase
30/123
RCBO INSIDE ADISTRIBUTION BOARD
RCCB INSIDE A
DISTRIBUTION BOARD
To ensure freedom from risk of shock it is importantthat the earth connection linking the metalwork ofelectrical equipment has a very low resistance.
RCCB provide a possible solution. The current-operated type compare the current flowing in the lineand neutral of a circuit.
In the case of fault the current flow will no longer beequal and the device will disconnect the supply.
RESIDUAL CURRENT CIRCUIT BREAKER
(RCCB)
-
8/2/2019 Week 5 Electrical Three Phase
31/123
MAIN SWITCH BOARDTRUNKING FOR
UNDERGROUND CABLE
UNDER MAIN SWITCH
BOARD
Electrical typical legend in M&E drawings
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
32/123
Main switch
ELECTRICAL INSTALLATIONS
Locate at the main incoming supply of the consumers Distribution Board
The purpose is to cut all of the power supply to the consumer in the event thatany maintenance work needs to be carried out.
Connect, cut off and control the current if their any excess current.
A two terminal one way switch that contains fuse.
Main switch
-
8/2/2019 Week 5 Electrical Three Phase
33/123
Circuit breaker : ELCB
ELECTRICAL INSTALLATIONS
A mechanical device to connect and cutout circuit It will cut off any faulty circuit immediately Sensitive to lightning 2 types:
Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB
ELCB
-
8/2/2019 Week 5 Electrical Three Phase
34/123
This is where distribution of electrical energy to various connected load takeplace inside the consumer premises.
It also distributes the path for the earthing and neutral wire, and acts asmeans of flowing leakage and return current respectively.
Distribution board
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
35/123
Miniature circuit breaker : MCB
ELECTRICAL INSTALLATIONS
MCB & FUSE
-
8/2/2019 Week 5 Electrical Three Phase
36/123
WIRING TO DISTRIBUTION BOARD
MAIN SWITCH AND ELCB
MAIN SWITCH
4 POLE ELCB
-
8/2/2019 Week 5 Electrical Three Phase
37/123
METERING BOARD
Equipment and Control Gear
Measurement rules
ELECTRICAL INSTALLATIONS
Manufacturers details and dimension on size
-
8/2/2019 Week 5 Electrical Three Phase
38/123
Usually for houses and small loaded.
Situated inside building.
Including equipment such as circuit breaker and fuse
SMM2 Refer to clause R.4.1(NO.)
Distribution board
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
39/123
EQUIPMENT SUPPORTS : R5
Equipment supports enumerated and described (NO)
Method of fixing given in the description with clauses R.1.5-6.
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
40/123
FITTING AND ACCESSORIES (N0)
R6 Fittings (clock , alarm bells)
Accessories (socket outlets)
R7 Pendant fittings NO length stages 300mm
R8 Accessories - NO (in gang)
a) rated capacity
b) type
c) no. accessories in each gang
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
41/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
42/123
Switch socket outlet & socket
point.
Different Types for different
capacity. SMM2 Refer to clause R.18.2
(No.)
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
43/123
SOCKET
Power installation
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
44/123
TV Co-axial socket outlet 1 gang 15A Switched
Socket Outlet
13A 2 gangswitched socket outlet
13A 2 gang switched
socket outlet with neon
Power installation
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
45/123
13A 2 gangs/s/o
13A 2 gangs/s/o with neon
Bell push switch
Telephonesocket
Power installation
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
46/123
Fluorescents Lights and
emergency light.
Specification refer to
manufacturer.
SMM2 Refer to clause
R.4.1(NO.)
Lighting installation
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
47/123
Fluorescent light
KELUAR emergency sign
-
8/2/2019 Week 5 Electrical Three Phase
48/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
49/123
Fan, MATV point and
telephone point.
SMM2 Refer to clause R.6,R.22.1 (NO.)
Electrical appliance
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
50/123
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
51/123
CONDUIT, TRUNKING AND CABLE TRAYS
R9.1 Conduit and fittings. (m)
a) type
b) size
c) specificationd) saddles & crampets pattern
e) nature of background
Except for final sub-circuit (measured overall conduit fittings)
e.g tees, elbows, bend, cover plates, bushes, locknuts, nipples,stopping-lugs and reducing bushes), short running lengths and
branches).
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
52/123
PVC Conduit
Conduit, trunking and metal tray
ELECTRICAL INSTALLATIONS
Galvanized Iron Conduit
-
8/2/2019 Week 5 Electrical Three Phase
53/123
CONDUIT, TRUNKING AND CABLE TRAYS
Classification :
a) conduits fixed to surfaces
b) conduits fixed in chases
c) conduits embedded in floor screeds
d) conduits embedded in concrete
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
54/123
Conduit inside the suspended ceiling
Conduit, trunking and metal tray
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
55/123
Conduit, trunking and metal tray
ELECTRICAL INSTALLATIONS
Conduits fixed in chases
brickwall
-
8/2/2019 Week 5 Electrical Three Phase
56/123
Drilling works to chases wiring to the brickwall
Conduit, trunking and metal tray
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
57/123
CONDUIT, TRUNKING AND CABLE TRAYS
R9.2 Special boxes, adaptable box, floor trap boxes,
purposes made boxes, rectangular junction boxes required fordrawing in cables , flameproof boxes & expansion joint
( N0 EXTRA OVER)
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
58/123
Munson ring
Conduit support
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
59/123
Conduit Adaptor
(Isometric to PG Thread)
Coupling
Flange Coupling
Long Nipple Short Nipple
Solid Male
BendReducer
Conduit assecories
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
60/123
Stainless
Steel ChainLead
WasherNeoprene
Washer Stopping Plug
Locking Ring Locknut Female BushMale Bush
Conduit assecories
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
61/123
Terminal Box Angle Box Through Box
Inspection Elbow Branch Two
Way BoxTee Box
Conduit assecories
ELECTRICAL INSTALLATIONS
El i l d i
-
8/2/2019 Week 5 Electrical Three Phase
62/123
Electrical conduit
ELECTRICAL INSTALLATIONS
M t l
-
8/2/2019 Week 5 Electrical Three Phase
63/123
CONDUIT, TRUNKING AND CABLE TRAYS
R9.3 Flexible conduits & extensible conduit (NO)
i) size ii) overall length iii) type
iv) size & type termination glands
R9.4 Components & special boxes (N0)
( for making connection of conduit in trunking )
Measurement rules
ELECTRICAL INSTALLATIONS
M t l
-
8/2/2019 Week 5 Electrical Three Phase
64/123
Measurement rules
ELECTRICAL INSTALLATIONS
M t l
-
8/2/2019 Week 5 Electrical Three Phase
65/123
CONDUIT, TRUNKING AND CABLE TRAYS
R10.1 Trunking (m)
i) type
ii) size
iii) no & size compartment
iv) method of connecting
R10.2 Fitting (NO) and EXTRA OVER
R10.3 Connection between trunking & item of equipment &control gear use flanges and or the forming of apertures
(N0)
Measurement rules
ELECTRICAL INSTALLATIONS
T ki
-
8/2/2019 Week 5 Electrical Three Phase
66/123
A rectangular metal made system
that either horizontally or vertically
fixed to wall.
A good mechanical protection.
Made from 18 gauge steel sheet. Available size:
50mm x 50mm
70mm x 100mm
150mm x 75mm
150mm x 150mm
Equipped with bend, tee, and
junction.
Trunking
ELECTRICAL INSTALLATIONS
T ki
-
8/2/2019 Week 5 Electrical Three Phase
67/123
Cable and trunking use for connection from main to distribution board or
distribution board to socket. Size and Material.
SMM2 Refer to clause R.15, R.9 (M)
Trunking
ELECTRICAL INSTALLATIONS
Trunking fittings
-
8/2/2019 Week 5 Electrical Three Phase
68/123
90r Gusset Bend
Front Lid(Traditional)
90r Gusset Bend
Inside Lid
(Traditional)
45r BendOutside Lid
45r Bend
Front Lid
90r Gusset Bend
Front Lid45r Bend
Inside Lid
Trunking fittings
ELECTRICAL INSTALLATIONS
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor Petaling Jaya Se langor
-
8/2/2019 Week 5 Electrical Three Phase
69/123
ELEMENT: ELECTRICAL SERVICES ubb/N/05
BIL UNIT KUANTITI
I
ACSU starter panel. NO 1
Aircond point. NO 6
J
M 11.53
M 30.53
M 186.41
M 112.06
K
M 132.00
M 16.78
M 56.03
M 56.03
To Collection
Selangor, Petaling Jaya, Se langor.
KETERANGAN HARGA
(RM)
JUMLAH
(RM)
Cables In Concrete Buildings Internally (All
Provisional)
Electrical Appliances In Concrete Buildings
Internally (All Provisional)
Conduits And Fittings In Concrete Buildings
Internally (All Provisional)
20mm Galvanised Iron class 'B' conduits with screw
joints and run at underfloor level.
20mm Galvanised Iron class 'B' conduits with screw
joints and chased into brickwall.
2 x 6mm/1C in concealed UPVC conduits.
4 x 6mm/1C in concealed UPVC conduits.
2 x 1.5mm/1C in concealed UPVC conduits.
2 x 2.5mm/1C in concealed UPVC conduits.
50mm x 25mm underfloor trunking for power point.
75mm x 25mm underfloor trunking for computer
services.
Run at ceiling level
Fixed to wall using bracket
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
70/123
CONDUIT, TRUNKING AND CABLE TRAYS
R10.4 Pin racks (NO)
i) type; and ii) size
R11.1 Busbar Trunking (m)
Clauses R.10.1
a) type; b) width; c) rated capacity; and
d) method of capacity
R11.2 Tap-off units, feeder units, fire barries & the like (NO)
Measurement rules
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
71/123
Measurement rules
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
72/123
CONDUIT, TRUNKING AND CABLE TRAYS
R12.1 Trays (m)
i) type; ii) width; and iii) method of jointing
R12.2 Stools (NO)
i) type; and ii) size
R12.3 Fitting (NO and EXTRA OVER )
Measurement rules
ELECTRICAL INSTALLATIONS
Cable tray
-
8/2/2019 Week 5 Electrical Three Phase
73/123
Cable tray
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
74/123
Measurement rules
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
75/123
CABLES
R15.1 Cables (m)
measured as the net length of the conduit, trunking or tray.
other cable measured as fix (without any allowance for sag)between boxes, equipment control gear, fittings, accessories
etc.
except for final sub-circuits.
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
76/123
The conductors used in domestic installations are called cables andconsist of a conductor of low resistance such as copper and aluminiumsurrounded by an insulator of high resistance such as rubber andplastic.
Cable sizes are known by the nominal cross sectional area of theconductor and up to 2.5mm2 are usually of one strand.
Flexible PVC insulated cord
Types of wire
-
8/2/2019 Week 5 Electrical Three Phase
77/123
Types of wire
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
78/123
Cables
R15.2 Cables (m)
i) type ii) size iii) classification
CLASSIFICATION
a) drawn into conduits or ducts
b) laid or drawn into trunking
c) laid or drawn into trunking and laced into ciucuit
d) fixed to surfaces
e) wrapped around pipework
f) laid in trenches
g) fixed to insulators in overhead lines
h) suspended from catenary cables
R15.4 Cable joints (NO)
R15.5 Line taps (NO)
i) size ii) type of cable iii) shrouds (type)
Measurement rules
ELECTRICAL INSTALLATIONS
Cable classification
-
8/2/2019 Week 5 Electrical Three Phase
79/123
Underground cable Fixed to wall Fixed in ceiling
Cable classification
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
80/123
CABLE
R15.6 Cable termination glands (NO)
i) type & size of cable ii) type of gland
R15.7 Conduit: boxes, adaptable boxes & the like used with
cable termination glands (NO - separately)
i) type ii) size of cable iii) joint-boxes, sealing boxes (type)
R16.1 Components for supporting cable given in the descriptionof the cable stating type and spacing.
Alternatively, components of combination system (NO)
Measurement rules
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
81/123
CABLE
R17 Connections to public mains, making good public highway and
other work which may only carried out by Public Undertaking
or Local Authority PROVISIONAL SUM
Measurement rules
ELECTRICAL INSTALLATIONS
-
8/2/2019 Week 5 Electrical Three Phase
82/123
CableLife
Neutral
P
ower
Fuse Box
Earth
Socket
-
8/2/2019 Week 5 Electrical Three Phase
83/123
Light Point
Switch
Cable
Final Sub-circuit
Life
Neutral
Lighting
Fuse Box
Final sub-circuit
-
8/2/2019 Week 5 Electrical Three Phase
84/123
Cable (m)
Final sub-
circuit (nos)
Stating the ampere rating
based on classification of point.
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
85/123
FINAL SUB-CIRCUITS
R18.1 Distribution sheets and drawing showing layout shall be given.
R18.2 Points (NO)
i) cable & conduit installations
ii) ampere rating
iii) classification
CLASSIFICATION
a) Lighting points: one way or two way
b) Socket or switch socket pointsc) Immersion heater points, cooker outlet points etc.
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
86/123
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
87/123
EARTHING
R19.1 Tapes for earthing (m)
i) size; ii) type; andiii) type & spacing of saddles, cleats, clip holdfasts & the like
R19.2 Conductor connections & junctions (NO)
i) type; and ii) size
R19.4 Test clamps (NO)
i) type ii) size; and iii) method of connecting
ELECTRICAL INSTALLATIONS
Lightning protection system
-
8/2/2019 Week 5 Electrical Three Phase
88/123
Air Terminal
Cooper Tape
g g p y
ELECTRICAL INSTALLATIONS
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Sela ngor.
-
8/2/2019 Week 5 Electrical Three Phase
89/123
ELEMENT: ELECTRICAL SERVICES ubb/N/04
BIL UNIT KUANTITI
NO 16
NO 16
H
M 29.00
Brass test c lamp complete with screws. NO 2
NO 2
NO 2
To Collection
HARGA
(RM)
JUMLAH
(RM)
25mm x 3mm copper tape at roof including propose
made copper or brass clips at 1000mm internals and
connecting to roof tapes.
500mm High Solid Copper air termination with
formed thread complete with bronze nut and
appropriate thickness copper air terminal base.
KETERANGAN
Lighting Installation-Internally (All Provisional)
(Cont'd)
3 x 36W recessed mounted fluorescent light fitting
with low loss ballast C/W acrylic diffuser 2 x
1.5mm/1C PVC in concealed UPVC conduits with
5A switch.
300mm x 300mm x 300mm deep concrete Earth
Electrode Chamber complete with concrete cover
from ground level, lightweight screed to prevent
ingres of water, 16mm solid drawn copper Earth
Electrode, copper tape and 50mm UPVC pipe.
3 x 36W recessed s urface fluorescent light fitting
with low loss ballast C/W acrylic diffuser 2 x
1.5mm/1C PVC in concealed UPVC conduits with
5A switch.
Lightning Protection-Externally (All Provisional)
COOPER TAPE
ELECTRODE CHAMBER
Earthing installation
-
8/2/2019 Week 5 Electrical Three Phase
90/123
Typical earth-electrode pit
Earthing using cooper stripEarthing & Bonding requirement
ELECTRICAL INSTALLATIONS
E th l t d it
-
8/2/2019 Week 5 Electrical Three Phase
91/123
Earth electrode pit
Cooper strip
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
92/123
EARTHING
R19.5 Earth electrodes (NO)
i) type ii) size; and iii) driving electrode into ground
R19.6 Air termination points (NO)
i) type ii) size; and iii) method of connecting
ELECTRICAL INSTALLATIONS
Lightning protection installation
-
8/2/2019 Week 5 Electrical Three Phase
93/123
Air Termination (NO.)
Copper Tape Roof Conductor. (M)
SMM2 Refer to clause R.19.6, R.22.2, R.19.
g g
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
94/123
ANCILLARIES
R20 Loose keys, tools, spares and the like (NO separately)
i) type; and ii) quantity
Rack for holding tools (NO)
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
95/123
SUNDRIES
R22.1 Marking the position of holes, mortice, chases & the like
(ITEM)
R22.2 General earth bonding & earthing (ITEM)
R22.3 Disconnecting, setting aside & refixing equipment (ITEM)
R22.4 Temporary operating each installation (ITEM)
R22.5 Testing each installation (ITEM)R22.6 Preparing plans or diagrams of the installations (ITEM)
ELECTRICAL INSTALLATIONS
Measurement rules
-
8/2/2019 Week 5 Electrical Three Phase
96/123
ELECTRICAL INSTALLATIONS
M NT CT ICA S IC S / /
Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri
Selangor, Petaling Jaya, Selangor.
-
8/2/2019 Week 5 Electrical Three Phase
97/123
ELEMENT: ELECTRICAL SERVICES ubb/N/06
BIL UNIT KUANTITI
L Sundries
ITEM
M Testing
ITEM
To Collection
Test the lighting and fitting installation described in
specification.
On completion of the electrical installalion test all
switches switch sockets, wiring etc. and make good
all defects an leave everything perfect working order
to the satisfication of the S.O and TNB.
KETERANGAN HARGA
(RM)
JUMLAH
(RM)
-
8/2/2019 Week 5 Electrical Three Phase
98/123
2009 Sarajul Fikri Mohamed
Summary of
measurement rules
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
99/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
1)Main Installation
sub main cables stating the type and size m R.2.1.c
meter panel shall be described with no R.4.2
manufacture's detail
specification
distribution board ditto no
cables stating the type, size and the m R.15.2
location ( net length )
conduits stating the type, external size m R.9.1
and the location
sundries
mark the holes & etc. stating the nature of works & item R.22.1
relevant particulars
general bonding each installation item R.22.2
testing ditto and stating particulars of item R.22.5
any special insurance cover
required by Employer
SUMMARY OF MEASUREMENT RULES
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
100/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
2) PowerInstallation
fittings & accessories
socket unless stated all shall be enumerated no R.6.1
cables stating the type, size and the m R.15.2
location ( net length )
conduits stating the type, external size m R.9.1
and the location
final sub-circuit stating the ampere rating no R.18.2
sundries
mark the holes & etc. stating the nature of works & item R.22.1
relevant particulars
general bonding each installation item R.22.2
testing ditto and stating particulars of item R.22.5
any special insurance cover
required by Employer
SUMMARY OF MEASUREMENT RULES
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
101/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
3) Lighting Installation
fittings & accessories
switch unless stated all shall be enumerated no R.6.1
cables stating the type, size and the m R.15.2
location ( net length )
conduits stating the type, external size m R.9.1
and the location
final sub-circuit stating the ampere rating no R.18.2
sundries
mark the holes & etc. stating the nature of works & item R.22.1
relevant particularsgeneral bonding each installation item R.22.2
testing ditto and stating particulars of item R.22.5
any special insurance cover
required by Employer
SUMMARY OF MEASUREMENT RULES
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
102/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
4) Electrical Appliances
fittings & accessories
switch unless stated all shall be enumerated no R.6.1
cables stating the type, size and the m R.15.2
location ( net length )
conduits stating the type, external size m R.9.1
and the location
final sub-circuit stating the ampere rating no R.18.2
sundries
mark the holes & etc. stating the nature of works & item R.22.1
relevant particularsgeneral bonding each installation item R.22.2
testing ditto and stating particulars of item R.22.5
any special insurance cover
required by Employer
SUMMARY OF MEASUREMENT RULES
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
103/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
5) Earthing System
Installation
cables given in accordance with clause R.15 m R.19.1
copper tape stating the type & size m R.19.1
conductor connection stating the type & size no R.19.2
test clamps ditto & method of connecting no R.19.4earth electrodes ditto & driving electrodes into no R.19.5
groundshall be given
air termination stating the type & size & method of no R.19.6
connection
sundries
mark the holes & etc. stating the nature of works & item R.22.1
relevant particulars
testing each installation and stating item R.22.5
particulars ofany special insurance
cover required by Employer
SUMMARY OF MEASUREMENT RULES
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
104/123
ITEM METHOD OF MEASUREMENT UNIT CLAUSE
6) Builder's Work
excavating trenches for cables and pipe ducts n. exc. m R.24.1
55mm nominal size refer to clause
D.12.9 & exc. 55mm refer to clause
V.2cable covers stating the type & size m R.24.2
SUMMARY OF MEASUREMENT RULES
-
8/2/2019 Week 5 Electrical Three Phase
105/123
2009 Sarajul Fikri Mohamed
Taking off list
Taking off list
-
8/2/2019 Week 5 Electrical Three Phase
106/123
2009 Sarajul Fikri Mohamed
PREAMBLE
GENERAL NOTES
MAIN INSTALLATION
Meter panel (no)
Main Switch Board (no)
Distribution Board (no) Main & sub main cabling (m)
Conduit and trunking (m)
Sundries (item)
Testing (item)
POWER INSTALLATION Fittings and accessories
Socket (no)
Point (no)
Cables (m)
Conduits (m)
Final sub circuit (no) Sundries
Mark the holes (item)
General earth bonding (item)
Testing (item)
ELECTRICAL INSTALLATIONS
Taking off list
-
8/2/2019 Week 5 Electrical Three Phase
107/123
2009 Sarajul Fikri Mohamed
LIGHTING INSTALLATION Fittings & accessories Swicth (no) Point (no)
Final sub-circuit (no)
Sundries Mark the holes (item) General earth bonding (item) Testing (item)
LIGHTNING INSTALLATION Copper tape (m) Test clamps (no) Air termination (no) Earth chamber(no)
SundriesMark the holes (item) Testing (item) Builders work
- Excavation trenches (m)
ELECTRICAL INSTALLATIONS
TAKING OFF LISTSDOMESTIC HOUSING SING E
-
8/2/2019 Week 5 Electrical Three Phase
108/123
DOMESTIC HOUSING SINGLEPHASE
1.Main Installation
- meter panel no
- distribution board no
- cables m- conduits no
- sundries
= mark holes item
= general bonding item
= testing item
TAKING OFF LISTSDOMESTIC HOUSING SINGLE
-
8/2/2019 Week 5 Electrical Three Phase
109/123
2. Power Installation- fitting & accessories
= socket no
- cables m
-conduits m
- final sub-circuit no
- sundries
= mark holes item
= general bonding item
= testing item
DOMESTIC HOUSING SINGLEPHASE
TAKING OFF LISTSDOMESTIC HOUSING SINGLE
-
8/2/2019 Week 5 Electrical Three Phase
110/123
3. Lighting Installation- fittings & accessories
= switch no
- cables m- conduits m
- final sub circuit no
- sundries
= mark holes item
= general bonding item
= testing item
DOMESTIC HOUSING SINGLEPHASE
TAKING OFF LISTSDOMESTIC HOUSING SINGLE
-
8/2/2019 Week 5 Electrical Three Phase
111/123
4. Electrical Appliances- fitting & accessories
= switch no
- cables m
- conduits m- final sub circuit no
- sundries
= mark holes item
= general bonding item
= testing item
DOMESTIC HOUSING SINGLEPHASE
TAKING OFF LISTSDOMESTIC HOUSING SINGLE
-
8/2/2019 Week 5 Electrical Three Phase
112/123
5. Earthing System Installation- cables m
- copper tape no
- test clamps no- conductor connection no
- earth electrodes no
- air termination no
- sundries
= mark holes item
= testing item
DOMESTIC HOUSING SINGLEPHASE
-
8/2/2019 Week 5 Electrical Three Phase
113/123
2009 Sarajul Fikri Mohamed
Heading and description
ITEM DESCRIPTION UNIT QUANTITY
-
8/2/2019 Week 5 Electrical Three Phase
114/123
MAIN INSTALLATION(EXTERNALLY)
A Metering board to shop TNB kwh meter single
phase complete with cut out fuse, neutral link,
interconnecting cables and all necessary
accessories to TNB's requirementNO 1
B 150mm diameter corrogated pipe as specified
including all short running length extended
beyond drain.M 12
C 100mm diameter PVC pipe complete with long
bend extended beyond drain for entry of TNB
incoming cable to distribution board. M 21
-
8/2/2019 Week 5 Electrical Three Phase
115/123
POWER INSTALLATION (INTERNALLY)
Galvanised steel conduit with screw joint includingall short running lengths, bends, tees, saddles,
crampets, locknut and circular conduit box
A 20mm Diameter conduit chased in brickwall.M 36
B 20mm Diameter conduit fixed to ceiling.M 21
C20mm Diameter conduit embedded in floor screed. M 20
ITEM DESCRIPTION UNIT QUANTITY
ITEM DESCRIPTION UNIT QUANTITY
-
8/2/2019 Week 5 Electrical Three Phase
116/123
LIGHTING INSTALLATION (INTERNALLY)
Cable
A2 x 1C-2.5mm2 PVC insulated colour coded cable as
specified drawn into conduit.M 127
Fittings and Accessories
B 6 Ampere 1 gang 1 way wall mounted flush type switch for
light complete with PVC face plate mount to brickwall at
1200mm from finished floor level.
NO 2
C Final sub-circuit of galvanised steel conduit installation of
2 x 1.5mm2 PVC insulated cable drawn into galvanised
steel conduit (m/s) in circuit comprising of 1 lighting point.
NO 16
ITEM DESCRIPTION UNIT QUANTITY
-
8/2/2019 Week 5 Electrical Three Phase
117/123
ITEM DESCRIPTION UNIT QUANTITY
LIGHTNING PROTECTION INSTALLATION(EXTERNALLY)
A Lightning air terminal with approved hold fasts
including 25mm x 3mm copper tape and roof
conductor with and including gun conductor with earth
electrode.NO 1
B 25mm x 3mm bare copper tape fixed with and
including cast brass saddles at one metre centres
including bends, sets and saddles fix at roof.M 13
C Test clamp, size 20mm x 40mm connected to
conductor, screwed to brickwall vertically. NO 2
-
8/2/2019 Week 5 Electrical Three Phase
118/123
2009 Sarajul Fikri Mohamed
Case study
-
8/2/2019 Week 5 Electrical Three Phase
119/123
CASE STUDY
PROJECT TITLE
CADANGAN MEMBINA
DEWAN SERBAGUNA TAMAN KOTA JAYA
KOTA TINGGI, JOHOR
FOR
JKR (ELEKTRIK) NEGERI JOHOR
Fakulti Alam Bina
-
8/2/2019 Week 5 Electrical Three Phase
120/123
2009 Sarajul Fikri Mohamed
Studio work
-
8/2/2019 Week 5 Electrical Three Phase
121/123
STUDIO WORKELECTRICAL INSTALLATIONS THREE PHASE
PROJECT TITLEPEMASANGAN ELEKTRIK UNTUK SEBUAH
BLOK HEMODIALYSIS DI HOSPITAL TANGKAK,
MUAR JOHOR
FORJKR (ELEKTRIK) NEGERI JOHOR
Fakulti Alam Bina
-
8/2/2019 Week 5 Electrical Three Phase
122/123
SPNDB LMCCB
SUB SWITCHBOARD
100ATPNMCCB
TPNDBP
EA
RTHING
SYST
EM
BILIK SUIS
-
8/2/2019 Week 5 Electrical Three Phase
123/123
LOKASIBILIK SUIS
BILIK SUIS