    Construction Measurement III(SBQ 3314)

    Electrical Installations Three Phase

    Lecture By Dr Sarajul Fikri Mohamed

    Department of Quantity Surveying, FAB, UTM Skudai Johor, Malaysia

    12 January 2010

  • 8/2/2019 Week 5 Electrical Three Phase

    2/123

    Pre-cast and Pre-stressed ConcreteCIVIL WORKS

    Electrical Installations

    Fire Fighting Installations

    Air Conditioning Installations

    Unit/Split Package/Central

    Landscape Works

    Single Phase Three Phase

    Gas Installations

    ELECTRICAL WORKS

    MECHANICAL WORKS

    LANDSCAPE WORKS

    Hard Landscape Soft Landscape

    MAIN COURSE COMPONENTS

  • 8/2/2019 Week 5 Electrical Three Phase

    3/123

    2009 Sarajul Fikri Mohamed

    1. Electrical installations: main components

    2. SMM2 measurement rules for electrical installations: three phase

    3. Taking off list for electrical installations: three phase

    4. Heading and description.

    5. Case study: CADANGAN MEMBINA DEWAN SERBAGUNA TAMAN

    KOTA JAYA, KOTA TINGGI, JOHOR

    6. Studio work

    Table of contents

    ELECTRICAL INSTALLATIONS: THREE PHASE

  • 8/2/2019 Week 5 Electrical Three Phase

    4/123

    2009 Sarajul Fikri Mohamed

    Electrical installation

    and components

  • 8/2/2019 Week 5 Electrical Three Phase

    5/123

    Electrical distribution

    ELECTRICAL INSTALLATIONS

    Power transmission and distributions

  • 8/2/2019 Week 5 Electrical Three Phase

    6/123

    Types of electrical work

    ELECTRICAL INSTALLATIONS

    Two options

  • 8/2/2019 Week 5 Electrical Three Phase

    7/123

    Voltan yang dikenakan ialah 415 v dan juga boleh mencecah 880 v bagikilang yang menjalankan kerja berat seperti kilang besi dan kilang simen.

    Ia mempunyi tiga pengalir hidup dan neutral.

    Pengalir-pengalir hidup dikenalkan dengan kod-kod aksara berikut:

    LI atau R (red): Fasa pertama

    L2 ataU Y (yellow): Fasa kedua

    L3 atau B (blue) : Fasa ketiga

    Single and three phase

    ELECTRICAL INSTALLATIONS

    Bagi penggunaan rumah kediaman, voltan tiga fasa adalah terlalu tinggi dan

    merbahaya.

    Oleh itu voltan rendah daripada satu fasa lebih sesuai digunakan untuk tujuan

    domestik.

    Voltan piawai satu fasa ialah 240 v. Biasanya satu pengalir hidup digunakanbersama pengalir neutral iaitu:

    RN

    YN

    BN

    Three Phase

    Single Phase

  • 8/2/2019 Week 5 Electrical Three Phase

    8/123

    2009 Sarajul Fikri Mohamed

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    CABLES

    Main components

    ELECTRICAL INSTALLATIONS

    ELECTRICAL APPLIANCES

    CONDUIT AND FITTING

    LIGHTNING PROTECTION SYSTEM

    TESTING

  • 8/2/2019 Week 5 Electrical Three Phase

    9/123

    Electrical distribution

    ELECTRICAL INSTALLATIONS

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    ELECTRICAL APPLIANCES

    FINAL SUB-CIRCUIT

    CABLE

    CONDUIT

    LIGHTNING PROTECTION

    TESTING

  • 8/2/2019 Week 5 Electrical Three Phase

    10/123

    POWER

    INSTALLATION

    LIGHTING

    INSTALLATION

    ELECTRICAL

    APPLIANCES

    3 pin switch socket Fluorescent light

    Wall light

    EXIT sign

    High bay light

    EL light

    Exhaust fan

    Sweep ceiling fan

    CONDUIT &

    FITTING

    CABLES TESTING

    Chased into brickwallCeiling level

    2x1c/2.5mm PVC cable2x1c/1.5mm PVC cable

    On completion of the electricalinstallation test all switches, switch

    socket, wiring etc and make good

    all defects an leave everything

    perfect working order to the

    satisfaction of the S.O and TNB

    Main components

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    11/123

    Electrical typical legend in M&E drawings

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    12/123

    2009 Sarajul Fikri Mohamed

    SMM2 measurement

    rules

  • 8/2/2019 Week 5 Electrical Three Phase

    13/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    14/123

    14

    Clause Description

    R4-R5 Equipments and Control Gear

    R6-R8 Fittings and Accessories

    R9-R13 Conduits, trunking and cable tray

    R14-R17 Cabling

    R18 Final Sub-circuits

    R19 Earthing

    R20-R21 Ancillaries

    R22 Sundries

    R23-R24 Builders Work

    Related SMM2 clauses

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    15/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    16/123

    ELECTRICAL INSTALLATIONS

    THREE PHASE

    PEMASANGAN ELEKTRIK UNTUK SEBUAH

    BLOK HEMODIALYSIS DI HOSPITAL TANGKAK,

    MUAR JOHOR

    FOR

    JKR (ELEKTRIK) NEGERI JOHOR

    Fakulti Alam Bina

  • 8/2/2019 Week 5 Electrical Three Phase

    17/123

    SPNDB LMCCB

    SUB SWITCHBOARD

    100ATPNMCCB

    TPNDBP

    EARTHING SYSTEM

  • 8/2/2019 Week 5 Electrical Three Phase

    18/123

    LOKASIBILIK SUIS

    BILIK SUIS

  • 8/2/2019 Week 5 Electrical Three Phase

    19/123

    ELEMENT: ELECTRICAL SERVICES ubb/N/01

    BIL UNIT KUANTITI

    A Preamble

    B

    M 3.05

    M 3.05

    C

    M 1.00

    M 1.00

    To Collection

    All quantities in this bill are provisional quantities

    subject to remeasurement upon construction of the

    said item. The tenderer must allow for testing the

    electrical installation and handling over of test

    certificate to S.O.

    Incoming Services-Externally (All Provisional)

    25mm x 25mm Telekom PVC trunking from lightingarrestors run at high level and drops to computer

    server.

    100mm UPVC class 'D' pipe complete with long

    bend extended beyond drain for entry of TNB,

    incoming cable to MSB inclusive of excavation and

    backfilling.

    4 x 25mm pilestas (AC) cable in UPVC class 'D'

    pipe (m/s) buried underground to TNB panel.

    75mm x 38mm electrical trunking from meter to

    DB/M3B.

    Incoming Services-Internally (All Provisional)

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

    INCOMING SERVICES -

    EXTERNALLY

    INCOMING SERVICES -

    INTERNALLY

  • 8/2/2019 Week 5 Electrical Three Phase

    20/123

    R.2 CLASIFICATION OF WORK

    a. Incoming servicesb. Standby equipmentc. Mains installation-switch gears, sub-main cables.

    d. Power installatione. Lighting installationf. Heating installationg. Electrical appliancesh. Electrical work

    k. Clock installation

    I. Sound distribution

    m. Alarm systemn. Earthing system installation

    p. Lightning protection installation

    q. Special services

    r. Any other installation

    s. Trunking, ducting and cable trays

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    21/123

    LOCATION OF ELECTRICAL WORKS

    R3 - Location of work

    a. Internallyb. Externally

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    22/123

    ITEM DESCRIPTION UNIT

    POWER INSTALLATION

    (INTERNALLY)

    Cable

    A2 x 1C-2.5mm2 PVC insulated colour coded

    cable as specified drawn into conduit.

    M

    Cl R.2.1(d)

    Classification of work

    Cl R.3.1(a)

    Location of Work

    Cl R.14.2

    Generally

    Cl R.15.2(a)

    Cables

  • 8/2/2019 Week 5 Electrical Three Phase

    23/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    24/123

    EQUIPMENT AND CONTROL GEAR (NO)

    R4 Equipment (generator, motors)

    Control gear (isolator, switch fuses)

    Packaged item described with a manufacturers detail.

    Limiting dimension on size shall be given.

    Connecting cable ends or cable tails shall be deemed to be

    included with the item.

    Platework and supporting steelwork Section P.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    25/123

    SPNDB LMCCB

    SUB SWITCHBOARD

    100ATPNMCCB

    TPNDBP

    EARTHING SYSTEM

  • 8/2/2019 Week 5 Electrical Three Phase

    26/123

    WALL MOUNTED SUB

    SWITCH BOARD

    MAIN SWITCH C/W

    INDICATOR LIGHTS

    ELEMENT: ELECTRICAL SERVICES ubb/N/02

    BIL UNIT KUANTITI

    D

    NO 1

    NO 1

    NO 1

    E

    NO 2

    NO 2

    NO 4

    To Collection

    Mains Installation-Internally (All Provisional)

    Metal clad main switch board of wall mounted floor

    standing type model no. 3b and including 60A/100A

    TPN cut-off fuse C/W neutral link, 75A TPN MCCB

    and surge protector and all associated accessories.

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

    4 nos 13A 3pin switch socket outlets mounted under

    of table complete with 2 x 2.5mm/1C PVC in

    concealed UPVC trunking.

    Wall mounted metal clad distribution board inclusive

    60A TPN MCCB, 60A TPN current-operated 300mA

    ELCB comprising 17 nos of 30A MCB, 5 nos of 20A

    MCB, 6 nos aircond point and all associated

    accessories.

    PowerInstallation-Internally (All Provisional)

    Wall mounted metal clad distribution board inclusive

    30A SPN MCB, 30A SPN current-operated 100mA

    ELCB comprising of 13 nos 6A MCB and all

    associated accessories.

    3 nos 13A 3pin switch socket outlets mounted

    300mm from first floor level complete with 2 x

    2.5mm/1C PVC in concealed UPVC trunking.

    4 nos 13A 3pin switch socket outlets mounted

    300mm from first floor level complete with 2 x

    2.5mm/1C PVC in concealed UPVC trunking.

  • 8/2/2019 Week 5 Electrical Three Phase

    27/123

    To monitor and record the total amount of electrical

    energy that is being consumed for the purpose of

    charging consumers through the issuance of

    electricity bills .

    Property of TNB

    2 types of meter

    Analog

    Digital

    METERING BOARD

    TNB CUT OUT FUSE

    Consumers back up protection 2 purposes:

    As a measure of back up protection to the fuse in theDistribution Board and also ELCB As mean of cutting of electrical supply to the consumers

    when required Cutout fuse is connected to live wire and it is use to

    control current supply. Both belong to TNB.

  • 8/2/2019 Week 5 Electrical Three Phase

    28/123

    DISTRIBUTIONBOARD

    ELEMENT: ELECTRICAL SERVICES ubb/N/02

    BIL UNIT KUANTITI

    D

    NO 1

    NO 1

    NO 1

    E

    NO 2

    NO 2

    NO 4

    To Collection

    Mains Installation-Internally (All Provisional)

    Metal clad main switch board of wall mounted floor

    standing type model no. 3b and including 60A/100A

    TPN cut-off fuse C/W neutral link, 75A TPN MCCB

    and surge protector and all associated accessories.

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

    4 nos 13A 3pin switch socket outlets mounted under

    of table complete with 2 x 2.5mm/1C PVC in

    concealed UPVC trunking.

    Wall mounted metal clad distribution board inclusive

    60A TPN MCCB, 60A TPN current-operated 300mA

    ELCB comprising 17 nos of 30A MCB, 5 nos of 20A

    MCB, 6 nos aircond point and all associated

    accessories.

    PowerInstallation-Internally (All Provisional)

    Wall mounted metal clad distribution board inclusive

    30A SPN MCB, 30A SPN current-operated 100mA

    ELCB comprising of 13 nos 6A MCB and all

    associated accessories.

    3 nos 13A 3pin switch socket outlets mounted

    300mm from first floor level complete with 2 x

    2.5mm/1C PVC in concealed UPVC trunking.

    4 nos 13A 3pin switch socket outlets mounted

    300mm from first floor level complete with 2 x

    2.5mm/1C PVC in concealed UPVC trunking.

  • 8/2/2019 Week 5 Electrical Three Phase

    29/123

    Excess current protection

    MINIATURE CIRCUITBREAKERS (MCB)

    An electromechanical or electro thermal devices which break the circuit in the caseof excess current It will cut off any faulty circuit immediately Sensitive to lightning 2 types of excess current protection:

    Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB

    MCB

  • 8/2/2019 Week 5 Electrical Three Phase

    30/123

    RCBO INSIDE ADISTRIBUTION BOARD

    RCCB INSIDE A

    DISTRIBUTION BOARD

    To ensure freedom from risk of shock it is importantthat the earth connection linking the metalwork ofelectrical equipment has a very low resistance.

    RCCB provide a possible solution. The current-operated type compare the current flowing in the lineand neutral of a circuit.

    In the case of fault the current flow will no longer beequal and the device will disconnect the supply.

    RESIDUAL CURRENT CIRCUIT BREAKER

    (RCCB)

  • 8/2/2019 Week 5 Electrical Three Phase

    31/123

    MAIN SWITCH BOARDTRUNKING FOR

    UNDERGROUND CABLE

    UNDER MAIN SWITCH

    BOARD

    Electrical typical legend in M&E drawings

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    32/123

    Main switch

    ELECTRICAL INSTALLATIONS

    Locate at the main incoming supply of the consumers Distribution Board

    The purpose is to cut all of the power supply to the consumer in the event thatany maintenance work needs to be carried out.

    Connect, cut off and control the current if their any excess current.

    A two terminal one way switch that contains fuse.

    Main switch

  • 8/2/2019 Week 5 Electrical Three Phase

    33/123

    Circuit breaker : ELCB

    ELECTRICAL INSTALLATIONS

    A mechanical device to connect and cutout circuit It will cut off any faulty circuit immediately Sensitive to lightning 2 types:

    Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB

    ELCB

  • 8/2/2019 Week 5 Electrical Three Phase

    34/123

    This is where distribution of electrical energy to various connected load takeplace inside the consumer premises.

    It also distributes the path for the earthing and neutral wire, and acts asmeans of flowing leakage and return current respectively.

    Distribution board

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    35/123

    Miniature circuit breaker : MCB

    ELECTRICAL INSTALLATIONS

    MCB & FUSE

  • 8/2/2019 Week 5 Electrical Three Phase

    36/123

    WIRING TO DISTRIBUTION BOARD

    MAIN SWITCH AND ELCB

    MAIN SWITCH

    4 POLE ELCB

  • 8/2/2019 Week 5 Electrical Three Phase

    37/123

    METERING BOARD

    Equipment and Control Gear

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Manufacturers details and dimension on size

  • 8/2/2019 Week 5 Electrical Three Phase

    38/123

    Usually for houses and small loaded.

    Situated inside building.

    Including equipment such as circuit breaker and fuse

    SMM2 Refer to clause R.4.1(NO.)

    Distribution board

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    39/123

    EQUIPMENT SUPPORTS : R5

    Equipment supports enumerated and described (NO)

    Method of fixing given in the description with clauses R.1.5-6.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    40/123

    FITTING AND ACCESSORIES (N0)

    R6 Fittings (clock , alarm bells)

    Accessories (socket outlets)

    R7 Pendant fittings NO length stages 300mm

    R8 Accessories - NO (in gang)

    a) rated capacity

    b) type

    c) no. accessories in each gang

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    41/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    42/123

    Switch socket outlet & socket

    point.

    Different Types for different

    capacity. SMM2 Refer to clause R.18.2

    (No.)

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    43/123

    SOCKET

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    44/123

    TV Co-axial socket outlet 1 gang 15A Switched

    Socket Outlet

    13A 2 gangswitched socket outlet

    13A 2 gang switched

    socket outlet with neon

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    45/123

    13A 2 gangs/s/o

    13A 2 gangs/s/o with neon

    Bell push switch

    Telephonesocket

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    46/123

    Fluorescents Lights and

    emergency light.

    Specification refer to

    manufacturer.

    SMM2 Refer to clause

    R.4.1(NO.)

    Lighting installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    47/123

    Fluorescent light

    KELUAR emergency sign

  • 8/2/2019 Week 5 Electrical Three Phase

    48/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    49/123

    Fan, MATV point and

    telephone point.

    SMM2 Refer to clause R.6,R.22.1 (NO.)

    Electrical appliance

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    50/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    51/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.1 Conduit and fittings. (m)

    a) type

    b) size

    c) specificationd) saddles & crampets pattern

    e) nature of background

    Except for final sub-circuit (measured overall conduit fittings)

    e.g tees, elbows, bend, cover plates, bushes, locknuts, nipples,stopping-lugs and reducing bushes), short running lengths and

    branches).

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    52/123

    PVC Conduit

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

    Galvanized Iron Conduit

  • 8/2/2019 Week 5 Electrical Three Phase

    53/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    Classification :

    a) conduits fixed to surfaces

    b) conduits fixed in chases

    c) conduits embedded in floor screeds

    d) conduits embedded in concrete

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    54/123

    Conduit inside the suspended ceiling

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    55/123

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

    Conduits fixed in chases

    brickwall

  • 8/2/2019 Week 5 Electrical Three Phase

    56/123

    Drilling works to chases wiring to the brickwall

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    57/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.2 Special boxes, adaptable box, floor trap boxes,

    purposes made boxes, rectangular junction boxes required fordrawing in cables , flameproof boxes & expansion joint

    ( N0 EXTRA OVER)

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    58/123

    Munson ring

    Conduit support

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    59/123

    Conduit Adaptor

    (Isometric to PG Thread)

    Coupling

    Flange Coupling

    Long Nipple Short Nipple

    Solid Male

    BendReducer

    Conduit assecories

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    60/123

    Stainless

    Steel ChainLead

    WasherNeoprene

    Washer Stopping Plug

    Locking Ring Locknut Female BushMale Bush

    Conduit assecories

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    61/123

    Terminal Box Angle Box Through Box

    Inspection Elbow Branch Two

    Way BoxTee Box

    Conduit assecories

    ELECTRICAL INSTALLATIONS

    El i l d i

  • 8/2/2019 Week 5 Electrical Three Phase

    62/123

    Electrical conduit

    ELECTRICAL INSTALLATIONS

    M t l

  • 8/2/2019 Week 5 Electrical Three Phase

    63/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.3 Flexible conduits & extensible conduit (NO)

    i) size ii) overall length iii) type

    iv) size & type termination glands

    R9.4 Components & special boxes (N0)

    ( for making connection of conduit in trunking )

    Measurement rules

    ELECTRICAL INSTALLATIONS

    M t l

  • 8/2/2019 Week 5 Electrical Three Phase

    64/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

    M t l

  • 8/2/2019 Week 5 Electrical Three Phase

    65/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R10.1 Trunking (m)

    i) type

    ii) size

    iii) no & size compartment

    iv) method of connecting

    R10.2 Fitting (NO) and EXTRA OVER

    R10.3 Connection between trunking & item of equipment &control gear use flanges and or the forming of apertures

    (N0)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    T ki

  • 8/2/2019 Week 5 Electrical Three Phase

    66/123

    A rectangular metal made system

    that either horizontally or vertically

    fixed to wall.

    A good mechanical protection.

    Made from 18 gauge steel sheet. Available size:

    50mm x 50mm

    70mm x 100mm

    150mm x 75mm

    150mm x 150mm

    Equipped with bend, tee, and

    junction.

    Trunking

    ELECTRICAL INSTALLATIONS

    T ki

  • 8/2/2019 Week 5 Electrical Three Phase

    67/123

    Cable and trunking use for connection from main to distribution board or

    distribution board to socket. Size and Material.

    SMM2 Refer to clause R.15, R.9 (M)

    Trunking

    ELECTRICAL INSTALLATIONS

    Trunking fittings

  • 8/2/2019 Week 5 Electrical Three Phase

    68/123

    90r Gusset Bend

    Front Lid(Traditional)

    90r Gusset Bend

    Inside Lid

    (Traditional)

    45r BendOutside Lid

    45r Bend

    Front Lid

    90r Gusset Bend

    Front Lid45r Bend

    Inside Lid

    Trunking fittings

    ELECTRICAL INSTALLATIONS

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor Petaling Jaya Se langor

  • 8/2/2019 Week 5 Electrical Three Phase

    69/123

    ELEMENT: ELECTRICAL SERVICES ubb/N/05

    BIL UNIT KUANTITI

    I

    ACSU starter panel. NO 1

    Aircond point. NO 6

    J

    M 11.53

    M 30.53

    M 186.41

    M 112.06

    K

    M 132.00

    M 16.78

    M 56.03

    M 56.03

    To Collection

    Selangor, Petaling Jaya, Se langor.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

    Cables In Concrete Buildings Internally (All

    Provisional)

    Electrical Appliances In Concrete Buildings

    Internally (All Provisional)

    Conduits And Fittings In Concrete Buildings

    Internally (All Provisional)

    20mm Galvanised Iron class 'B' conduits with screw

    joints and run at underfloor level.

    20mm Galvanised Iron class 'B' conduits with screw

    joints and chased into brickwall.

    2 x 6mm/1C in concealed UPVC conduits.

    4 x 6mm/1C in concealed UPVC conduits.

    2 x 1.5mm/1C in concealed UPVC conduits.

    2 x 2.5mm/1C in concealed UPVC conduits.

    50mm x 25mm underfloor trunking for power point.

    75mm x 25mm underfloor trunking for computer

    services.

    Run at ceiling level

    Fixed to wall using bracket

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    70/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R10.4 Pin racks (NO)

    i) type; and ii) size

    R11.1 Busbar Trunking (m)

    Clauses R.10.1

    a) type; b) width; c) rated capacity; and

    d) method of capacity

    R11.2 Tap-off units, feeder units, fire barries & the like (NO)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    71/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    72/123

    CONDUIT, TRUNKING AND CABLE TRAYS

    R12.1 Trays (m)

    i) type; ii) width; and iii) method of jointing

    R12.2 Stools (NO)

    i) type; and ii) size

    R12.3 Fitting (NO and EXTRA OVER )

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Cable tray

  • 8/2/2019 Week 5 Electrical Three Phase

    73/123

    Cable tray

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    74/123

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    75/123

    CABLES

    R15.1 Cables (m)

    measured as the net length of the conduit, trunking or tray.

    other cable measured as fix (without any allowance for sag)between boxes, equipment control gear, fittings, accessories

    etc.

    except for final sub-circuits.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    76/123

    The conductors used in domestic installations are called cables andconsist of a conductor of low resistance such as copper and aluminiumsurrounded by an insulator of high resistance such as rubber andplastic.

    Cable sizes are known by the nominal cross sectional area of theconductor and up to 2.5mm2 are usually of one strand.

    Flexible PVC insulated cord

    Types of wire

  • 8/2/2019 Week 5 Electrical Three Phase

    77/123

    Types of wire

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    78/123

    Cables

    R15.2 Cables (m)

    i) type ii) size iii) classification

    CLASSIFICATION

    a) drawn into conduits or ducts

    b) laid or drawn into trunking

    c) laid or drawn into trunking and laced into ciucuit

    d) fixed to surfaces

    e) wrapped around pipework

    f) laid in trenches

    g) fixed to insulators in overhead lines

    h) suspended from catenary cables

    R15.4 Cable joints (NO)

    R15.5 Line taps (NO)

    i) size ii) type of cable iii) shrouds (type)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Cable classification

  • 8/2/2019 Week 5 Electrical Three Phase

    79/123

    Underground cable Fixed to wall Fixed in ceiling

    Cable classification

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    80/123

    CABLE

    R15.6 Cable termination glands (NO)

    i) type & size of cable ii) type of gland

    R15.7 Conduit: boxes, adaptable boxes & the like used with

    cable termination glands (NO - separately)

    i) type ii) size of cable iii) joint-boxes, sealing boxes (type)

    R16.1 Components for supporting cable given in the descriptionof the cable stating type and spacing.

    Alternatively, components of combination system (NO)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    81/123

    CABLE

    R17 Connections to public mains, making good public highway and

    other work which may only carried out by Public Undertaking

    or Local Authority PROVISIONAL SUM

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Week 5 Electrical Three Phase

    82/123

    CableLife

    Neutral

    P

    ower

    Fuse Box

    Earth

    Socket

  • 8/2/2019 Week 5 Electrical Three Phase

    83/123

    Light Point

    Switch

    Cable

    Final Sub-circuit

    Life

    Neutral

    Lighting

    Fuse Box

    Final sub-circuit

  • 8/2/2019 Week 5 Electrical Three Phase

    84/123

    Cable (m)

    Final sub-

    circuit (nos)

    Stating the ampere rating

    based on classification of point.

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    85/123

    FINAL SUB-CIRCUITS

    R18.1 Distribution sheets and drawing showing layout shall be given.

    R18.2 Points (NO)

    i) cable & conduit installations

    ii) ampere rating

    iii) classification

    CLASSIFICATION

    a) Lighting points: one way or two way

    b) Socket or switch socket pointsc) Immersion heater points, cooker outlet points etc.

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    86/123

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    87/123

    EARTHING

    R19.1 Tapes for earthing (m)

    i) size; ii) type; andiii) type & spacing of saddles, cleats, clip holdfasts & the like

    R19.2 Conductor connections & junctions (NO)

    i) type; and ii) size

    R19.4 Test clamps (NO)

    i) type ii) size; and iii) method of connecting

    ELECTRICAL INSTALLATIONS

    Lightning protection system

  • 8/2/2019 Week 5 Electrical Three Phase

    88/123

    Air Terminal

    Cooper Tape

    g g p y

    ELECTRICAL INSTALLATIONS

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Sela ngor.

  • 8/2/2019 Week 5 Electrical Three Phase

    89/123

    ELEMENT: ELECTRICAL SERVICES ubb/N/04

    BIL UNIT KUANTITI

    NO 16

    NO 16

    H

    M 29.00

    Brass test c lamp complete with screws. NO 2

    NO 2

    NO 2

    To Collection

    HARGA

    (RM)

    JUMLAH

    (RM)

    25mm x 3mm copper tape at roof including propose

    made copper or brass clips at 1000mm internals and

    connecting to roof tapes.

    500mm High Solid Copper air termination with

    formed thread complete with bronze nut and

    appropriate thickness copper air terminal base.

    KETERANGAN

    Lighting Installation-Internally (All Provisional)

    (Cont'd)

    3 x 36W recessed mounted fluorescent light fitting

    with low loss ballast C/W acrylic diffuser 2 x

    1.5mm/1C PVC in concealed UPVC conduits with

    5A switch.

    300mm x 300mm x 300mm deep concrete Earth

    Electrode Chamber complete with concrete cover

    from ground level, lightweight screed to prevent

    ingres of water, 16mm solid drawn copper Earth

    Electrode, copper tape and 50mm UPVC pipe.

    3 x 36W recessed s urface fluorescent light fitting

    with low loss ballast C/W acrylic diffuser 2 x

    1.5mm/1C PVC in concealed UPVC conduits with

    5A switch.

    Lightning Protection-Externally (All Provisional)

    COOPER TAPE

    ELECTRODE CHAMBER

    Earthing installation

  • 8/2/2019 Week 5 Electrical Three Phase

    90/123

    Typical earth-electrode pit

    Earthing using cooper stripEarthing & Bonding requirement

    ELECTRICAL INSTALLATIONS

    E th l t d it

  • 8/2/2019 Week 5 Electrical Three Phase

    91/123

    Earth electrode pit

    Cooper strip

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    92/123

    EARTHING

    R19.5 Earth electrodes (NO)

    i) type ii) size; and iii) driving electrode into ground

    R19.6 Air termination points (NO)

    i) type ii) size; and iii) method of connecting

    ELECTRICAL INSTALLATIONS

    Lightning protection installation

  • 8/2/2019 Week 5 Electrical Three Phase

    93/123

    Air Termination (NO.)

    Copper Tape Roof Conductor. (M)

    SMM2 Refer to clause R.19.6, R.22.2, R.19.

    g g

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    94/123

    ANCILLARIES

    R20 Loose keys, tools, spares and the like (NO separately)

    i) type; and ii) quantity

    Rack for holding tools (NO)

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    95/123

    SUNDRIES

    R22.1 Marking the position of holes, mortice, chases & the like

    (ITEM)

    R22.2 General earth bonding & earthing (ITEM)

    R22.3 Disconnecting, setting aside & refixing equipment (ITEM)

    R22.4 Temporary operating each installation (ITEM)

    R22.5 Testing each installation (ITEM)R22.6 Preparing plans or diagrams of the installations (ITEM)

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Week 5 Electrical Three Phase

    96/123

    ELECTRICAL INSTALLATIONS

    M NT CT ICA S IC S / /

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

  • 8/2/2019 Week 5 Electrical Three Phase

    97/123

    ELEMENT: ELECTRICAL SERVICES ubb/N/06

    BIL UNIT KUANTITI

    L Sundries

    ITEM

    M Testing

    ITEM

    To Collection

    Test the lighting and fitting installation described in

    specification.

    On completion of the electrical installalion test all

    switches switch sockets, wiring etc. and make good

    all defects an leave everything perfect working order

    to the satisfication of the S.O and TNB.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

  • 8/2/2019 Week 5 Electrical Three Phase

    98/123

    2009 Sarajul Fikri Mohamed

    Summary of

    measurement rules

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    99/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    1)Main Installation

    sub main cables stating the type and size m R.2.1.c

    meter panel shall be described with no R.4.2

    manufacture's detail

    specification

    distribution board ditto no

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    general bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    100/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    2) PowerInstallation

    fittings & accessories

    socket unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    general bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    101/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    3) Lighting Installation

    fittings & accessories

    switch unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particularsgeneral bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    102/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    4) Electrical Appliances

    fittings & accessories

    switch unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particularsgeneral bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    103/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    5) Earthing System

    Installation

    cables given in accordance with clause R.15 m R.19.1

    copper tape stating the type & size m R.19.1

    conductor connection stating the type & size no R.19.2

    test clamps ditto & method of connecting no R.19.4earth electrodes ditto & driving electrodes into no R.19.5

    groundshall be given

    air termination stating the type & size & method of no R.19.6

    connection

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    testing each installation and stating item R.22.5

    particulars ofany special insurance

    cover required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    104/123

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    6) Builder's Work

    excavating trenches for cables and pipe ducts n. exc. m R.24.1

    55mm nominal size refer to clause

    D.12.9 & exc. 55mm refer to clause

    V.2cable covers stating the type & size m R.24.2

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Week 5 Electrical Three Phase

    105/123

    2009 Sarajul Fikri Mohamed

    Taking off list

    Taking off list

  • 8/2/2019 Week 5 Electrical Three Phase

    106/123

    2009 Sarajul Fikri Mohamed

    PREAMBLE

    GENERAL NOTES

    MAIN INSTALLATION

    Meter panel (no)

    Main Switch Board (no)

    Distribution Board (no) Main & sub main cabling (m)

    Conduit and trunking (m)

    Sundries (item)

    Testing (item)

    POWER INSTALLATION Fittings and accessories

    Socket (no)

    Point (no)

    Cables (m)

    Conduits (m)

    Final sub circuit (no) Sundries

    Mark the holes (item)

    General earth bonding (item)

    Testing (item)

    ELECTRICAL INSTALLATIONS

    Taking off list

  • 8/2/2019 Week 5 Electrical Three Phase

    107/123

    2009 Sarajul Fikri Mohamed

    LIGHTING INSTALLATION Fittings & accessories Swicth (no) Point (no)

    Final sub-circuit (no)

    Sundries Mark the holes (item) General earth bonding (item) Testing (item)

    LIGHTNING INSTALLATION Copper tape (m) Test clamps (no) Air termination (no) Earth chamber(no)

    SundriesMark the holes (item) Testing (item) Builders work

    - Excavation trenches (m)

    ELECTRICAL INSTALLATIONS

    TAKING OFF LISTSDOMESTIC HOUSING SING E

  • 8/2/2019 Week 5 Electrical Three Phase

    108/123

    DOMESTIC HOUSING SINGLEPHASE

    1.Main Installation

    - meter panel no

    - distribution board no

    - cables m- conduits no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTSDOMESTIC HOUSING SINGLE

  • 8/2/2019 Week 5 Electrical Three Phase

    109/123

    2. Power Installation- fitting & accessories

    = socket no

    - cables m

    -conduits m

    - final sub-circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    DOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTSDOMESTIC HOUSING SINGLE

  • 8/2/2019 Week 5 Electrical Three Phase

    110/123

    3. Lighting Installation- fittings & accessories

    = switch no

    - cables m- conduits m

    - final sub circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    DOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTSDOMESTIC HOUSING SINGLE

  • 8/2/2019 Week 5 Electrical Three Phase

    111/123

    4. Electrical Appliances- fitting & accessories

    = switch no

    - cables m

    - conduits m- final sub circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    DOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTSDOMESTIC HOUSING SINGLE

  • 8/2/2019 Week 5 Electrical Three Phase

    112/123

    5. Earthing System Installation- cables m

    - copper tape no

    - test clamps no- conductor connection no

    - earth electrodes no

    - air termination no

    - sundries

    = mark holes item

    = testing item

    DOMESTIC HOUSING SINGLEPHASE

  • 8/2/2019 Week 5 Electrical Three Phase

    113/123

    2009 Sarajul Fikri Mohamed

    Heading and description

    ITEM DESCRIPTION UNIT QUANTITY

  • 8/2/2019 Week 5 Electrical Three Phase

    114/123

    MAIN INSTALLATION(EXTERNALLY)

    A Metering board to shop TNB kwh meter single

    phase complete with cut out fuse, neutral link,

    interconnecting cables and all necessary

    accessories to TNB's requirementNO 1

    B 150mm diameter corrogated pipe as specified

    including all short running length extended

    beyond drain.M 12

    C 100mm diameter PVC pipe complete with long

    bend extended beyond drain for entry of TNB

    incoming cable to distribution board. M 21

  • 8/2/2019 Week 5 Electrical Three Phase

    115/123

    POWER INSTALLATION (INTERNALLY)

    Galvanised steel conduit with screw joint includingall short running lengths, bends, tees, saddles,

    crampets, locknut and circular conduit box

    A 20mm Diameter conduit chased in brickwall.M 36

    B 20mm Diameter conduit fixed to ceiling.M 21

    C20mm Diameter conduit embedded in floor screed. M 20

    ITEM DESCRIPTION UNIT QUANTITY

    ITEM DESCRIPTION UNIT QUANTITY

  • 8/2/2019 Week 5 Electrical Three Phase

    116/123

    LIGHTING INSTALLATION (INTERNALLY)

    Cable

    A2 x 1C-2.5mm2 PVC insulated colour coded cable as

    specified drawn into conduit.M 127

    Fittings and Accessories

    B 6 Ampere 1 gang 1 way wall mounted flush type switch for

    light complete with PVC face plate mount to brickwall at

    1200mm from finished floor level.

    NO 2

    C Final sub-circuit of galvanised steel conduit installation of

    2 x 1.5mm2 PVC insulated cable drawn into galvanised

    steel conduit (m/s) in circuit comprising of 1 lighting point.

    NO 16

    ITEM DESCRIPTION UNIT QUANTITY

  • 8/2/2019 Week 5 Electrical Three Phase

    117/123

    ITEM DESCRIPTION UNIT QUANTITY

    LIGHTNING PROTECTION INSTALLATION(EXTERNALLY)

    A Lightning air terminal with approved hold fasts

    including 25mm x 3mm copper tape and roof

    conductor with and including gun conductor with earth

    electrode.NO 1

    B 25mm x 3mm bare copper tape fixed with and

    including cast brass saddles at one metre centres

    including bends, sets and saddles fix at roof.M 13

    C Test clamp, size 20mm x 40mm connected to

    conductor, screwed to brickwall vertically. NO 2

  • 8/2/2019 Week 5 Electrical Three Phase

    118/123

    2009 Sarajul Fikri Mohamed

    Case study

  • 8/2/2019 Week 5 Electrical Three Phase

    119/123

    CASE STUDY

    PROJECT TITLE

    CADANGAN MEMBINA

    DEWAN SERBAGUNA TAMAN KOTA JAYA

    KOTA TINGGI, JOHOR

    FOR

    JKR (ELEKTRIK) NEGERI JOHOR

    Fakulti Alam Bina

  • 8/2/2019 Week 5 Electrical Three Phase

    120/123

    2009 Sarajul Fikri Mohamed

    Studio work

  • 8/2/2019 Week 5 Electrical Three Phase

    121/123

    STUDIO WORKELECTRICAL INSTALLATIONS THREE PHASE

    PROJECT TITLEPEMASANGAN ELEKTRIK UNTUK SEBUAH

    BLOK HEMODIALYSIS DI HOSPITAL TANGKAK,

    MUAR JOHOR

    FORJKR (ELEKTRIK) NEGERI JOHOR

    Fakulti Alam Bina

  • 8/2/2019 Week 5 Electrical Three Phase

    122/123

    SPNDB LMCCB

    SUB SWITCHBOARD

    100ATPNMCCB

    TPNDBP

    EA

    RTHING

    SYST

    EM

    BILIK SUIS

  • 8/2/2019 Week 5 Electrical Three Phase

    123/123

    LOKASIBILIK SUIS

    BILIK SUIS