ME 481 Mechanical Engineering Design Projects Week 15 Submit Final Report on Wednesday Final Presentation & Poster Design Day Friday April 29th Flash Drives Design Day Awards Participation Evaluation Week 15 Report Hard Copy Due Wednesday Files Due Thursday Report(s), Presentation(s), Poster Edison Judging Poster Fabrication Prototype Move Practice Design Day Preparation Final Report Hard Copy Use Cover Sheet from ME481 web site Look in “Course Materials” for Final Report Coversheet (Word file download) Due on Wednesday by 5 pm Look for the Box in ME Office (1) color copy for sponsor on top Will go with “Thank You” Plaque to sponsor (5) B&W copies: We will distribute FA, CG, plus (3) for Edison Judges Everything in (1) envelope (provided) Due by Thursday 5 pm All Design Group materials loaded Progress Report #1 & Presentation Progress Report #2 & Presentation Final Report, Poster & Presentation Put in Box in ME Office available in Design Day presentation room Flash Drive Files Design Day Setup Prototype Transport Group movers 1:30pm Thursday in IPL (Plan to go to the Union…) Poster & Prototype Setup by 8 am Friday Table, Power + Easel provided 1st Floor Lounge Available Thursday 3pm Fill out Special Request Sheets – Posters requested by Sponsors: make a 2 nd copy

Transcript of Week 15 Design Day Preparation - Michigan State University · • Final Presentation & Poster •...

Page 1: Week 15 Design Day Preparation - Michigan State University · • Final Presentation & Poster • Design Day Friday April 29th • Flash Drives • Design Day Awards • Participation

ME 481Mechanical Engineering

Design Projects

Week 15

• Submit Final Report on Wednesday• Final Presentation & Poster• Design Day Friday April 29th• Flash Drives• Design Day Awards• Participation Evaluation

Week 15

• Report Hard Copy Due Wednesday• Files Due Thursday

Report(s), Presentation(s), Poster• Edison Judging• Poster Fabrication• Prototype Move• Practice

Design Day Preparation

Final Report Hard Copy• Use Cover Sheet from ME481 web site

Look in “Course Materials” for Final Report Coversheet (Word file download)

• Due on Wednesday by 5 pmLook for the Box in ME Office

(1) color copy for sponsor on topWill go with “Thank You” Plaque to sponsor

(5) B&W copies: We will distributeFA, CG, plus (3) for Edison Judges

Everything in (1) envelope (provided)

• Due by Thursday 5 pm

• All Design Group materials loadedProgress Report #1 & PresentationProgress Report #2 & PresentationFinal Report, Poster & Presentation

• Put in Box in ME Office available in Design Day presentation room

Flash Drive Files Design Day Setup• Prototype Transport

– Group movers 1:30pm Thursday in IPL– (Plan to go to the Union…)

• Poster & Prototype Setup by 8 am Friday– Table, Power + Easel provided– 1st Floor Lounge Available Thursday 3pm

• Fill out Special Request Sheets– Posters requested by Sponsors: make a 2nd copy

Page 2: Week 15 Design Day Preparation - Michigan State University · • Final Presentation & Poster • Design Day Friday April 29th • Flash Drives • Design Day Awards • Participation

• Poster & Prototype Manned 1st Floor Lounge Friday 8am - Noon

• Presentations Lake Superior & Tower Rooms 8:00am-11:45am

• Attend Other Presentations You have received assignments via MSU email Evaluation Forms at the Door (REQUIRED)

• Lunch 12:15pm – 1:00pm• Attend Awards 1:15pm-2:00pm

Design Day Design Day Takedown• Posters Collected at Noon

–From easels–Do not remove your poster

• Prototypes Moved at Noon– Move it yourself … or– Group Movers required in Lounge

Design Day Awards1:15pm-2:00pm

• Best Presentation– Certificate plus $100 for each team member

• Best Poster– Certificate plus $100 for each team member

• The Edison Award for Best Project– Medal, Certificate, $150 for each team member

Be there or miss the excitement

Participation Evaluation• Evaluate your team members• Required for final grade• Download from ME481 web site

– On “Course Materials” PageLook for Participation Evaluation

• Due Monday Finals Week 5pm– Via email to [email protected]

Now Fill Out Forms

• Evaluate the CJR, course & lectures– SIRS forms today…

• Fill out special requests form for CG