Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr...
Transcript of Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr...
ID Task Name Duration
1 MOQ Mobilization 5.25 days
2 Permits/ Survey/ Tempacil 14 days
3 Excavation 14 days
4 Soil Poisoning 1.75 days
5 Rebar Fabrication 105 days
6 Installation of Footing and Grade Beam Rebar 5.25 days
7 Installation of Ground Floor Column Rebar 5.25 days
8 Footing Concrete Footing 3.5 days
9 Installation of Grade Beam Rebar & CHB Vert. bar 5.25 days
10 Installation of Grade Beam Form Works 3.5 days
11 Installation of Ground FloorColumn Form works 5.25 days
12 Grade Beam Concrete Pouring 3.5 days
13 Pipe Trenching for Pipes 3.5 days
14 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 5.25 days
15 Ground Floor Column Concrete Pouring 1.75 days
16 Curing Time 12.25 days
17 CuringTime 12.25 days
18 Installation of 2nd Flr Beam Rebar 8.75 days
19 Installation of Ground Floor CHB Wall 5.25 days
20 Removal of Gr Flr Concrete Formworks 1.75 days
21 Installation of 2nd Floor Formworks 5.25 days
22 Concrete Pouring 2nd Flr Beams 3.5 days
23 Curing Time 8.75 days
24 Elevator Footing Rebar Installation 5.25 days
25 Elevator Footing Concrete Pouring 1.75 days
26 Fabrication & Installation of Elevator Wall Rebar 5.25 days
27 Curing Time 12.25 days
28 Elavator Wall Formworks 3.5 days
29 Elevator Wall Concrete Pouring 1.75 days
30 Curing Time 12.25 days
31 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 5.25 days
32 Installation of Slab C-joist 1 day
33 Instllation of 2nd Flr CHB Wall 5.25 days
34 Curing Time 12.25 days
35 Removal of 2nd Floor Beam formworks and Scaffolding 1.75 days
36 Installation of3rd FlrBeam Rebar 8.75 days
37 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 5.25 days
38 Installation of Electrical Rough-ins at 2nd Flr 8.75 days
39 Removal of 2nd Flr Concrete Form works 1.75 days
40 Installation of 3rd Flr Formworks 5.25 days
41 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 8.75 days
42 Installation of Electrical Roughing-in 2nd Flr 7 days
43 Concrte pouring 3rd Flr Beams 1.75 days
44 Curing Time 8.75 days
45 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 7 days
46 Installation of C-Joist 5.25 days
47 Curing Time 12.25 days
48 Installation of 3rd Flr CHB wall 5.25 days
49 Installation of 4th Flr Beam Rebar 8.75 days
50 removal of 3rd Flr Concrete Forms 3.5 days
51 Concrete Pouring of 4th Flr Beams 1.75 days
52 Concrete Poruing 2nd Flr Column 1.75 days
53 Concrete Pouring 3rd Flr Column 3.5 days
54 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 7 days
55 Installation of Electrical Roughing-Ins 3rd Floor 12.25 days
56 Curing Time 8.75 days
57 Installation of CHB Wall at 4th Flr 14 days
58 Installation of C-Joist@ 4th Flr 5.25 days
59 Installation of 4th Flr Column Rebar Form works & Scaffolding 8.75 days
60 Concfrete Pouring 4th Flr Column 1.75 days
61 Curing Time 12.25 days
62 removal of 4th Flr Concrete Forms 1.75 days
63 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 14 days
64 Installation of Electrical Roughing -Ins 5th Flr 14 days
65 Installation of Rebar5th Flr Beams 8.75 days
66 Installation of 5th Flr Formworks & Scaffolding 8.75 days
67 Concrete Pouring of 5th Flr Beams 1.75 days
68 Curing Time 12.25 days
69 Removal of Beam & Column Formworks & Scaffolding 3.5 days
70 Installation of C-Joist 5th Flr 5.25 days
71 Installation of Water Proofing 7 days
72 Installation of Plumbing Fixtures 5.25 days
73 Installation of Tiles 2nd-5th Flr 35 days
74 Plastering of all walls 5.25 days
75 Installation of External Tubular Frame Aesthetic 10.5 days
76 Installation of Exterior Canopy 10.5 days
77 Construction of Catch basin 10.5 days
78 painting of all external & internal walls 26.25 days
79 installation of all doors and windows and Hardwares 14 days
80 Installation of Elevated tank & Frames And Pipes Fittings 5.25 days
81 Construction of Septic Tank 21 days
82 Construction of Underground Reservoir & Fittings & Pumps 21 days
83 Construction of Genset Foundation 17.5 days
84 Punch Listing Substantial Turnover 5.25 days
85 MOQ Turn Over 14 days
86 Construction of slab on fill 3.5 days
87 Installation of elevator machine 5.25 days
88 Mobilization 3.5 days
89 Demolition Works 15.75 days
90 Clearing and Grabbing 8.75 days
91 Hauling of unsuitable materials 5.25 days
92 Site Grading Cut and Fill 12.25 days
93 Road Tracing/ Survey Works 7 days
94 Pipe Trenching Storm Drainage 35 days
95 Pipe Trenching Sanitary Sewer Line 24.5 days
96 Pipe Trenching Water Line 29.75 days
97 Installation of Drainage Pipes and manholes & Beddings 60.01 days
98 Installation of Water Pipelines Gate valves, Pipe Fittings Thrust Blocks & Beddings 50.75 days
99 Installation of Fire Hydrants, Air release Valve and Blow off Vlave 12.25 days
100 Installation of Water Service Connection 14 days
101 Installation of Drainage Service Connection 8.75 days
102 Installation of Sanitary Sewer Service Connection 12.25 days
103 Installation of Sanitary Sewer Pipes and manholes & Beddings/ Force Main 26.25 days
104 BackFilling & Compaction Drainage Line 7 days
105 BackFilling & Compaction Water Line 10.5 days
106 backfilling & Compaction Sewer Line 5.25 days
107 Installation of Outfall Drainage Line 8.75 days
108 Installation of Outfall Drainage Structure 10.5 days
109 Preparation of Sub-base Course 8.75 days
110 Preparation of base Course 8.75 days
111 Preparation of Road Concrete Carriage way 35 days
112 installation of Kerb & Gutter & Kerb Inlet 29.75 days
113 Preparation of Base Course Sidewalk 12.25 days
114 Preparation of Sub-base Course Sidewalk 12.25 days
115 Installation of Sidewalk Concrete 21 days
116 Construction of Sanitary Sewage Treatment Plant (STP) 45.5 days
117 Construction of Lift Station 21 days
118 Installation of Lift Pumps & COntroller 5.25 days
119 Leak Testing of Drainage Pipes 1.75 days
120 Leak Testing of Sewer Pipes 1.75 days
121 hauling of excess Materials 8.75 days
122 WCQ Mobilization 5.25 days
123 Construction of Tempacil & Utilities Facilities 12.25 days
124 Demolition of Existing Structure 5.25 days
125 Clearing & Grabbing 3.5 days
126 Layout / Survey 3.5 days
127 Structure Excavation 5.25 days
128 Soil Poisoning & Granel Bedding 5.25 days
129 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days
130 Installation of Grade Beam Rebars 5.25 days
131 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days
132 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days
133 Concrete Pouring for Foting & Grade Beams 3.5 days
134 Installationof Pedestal and Column Formworks 3.5 days
135 Slab On fill Gravel Bedding 1.75 days
136 Concrete Pouring of Slab on Fill 1.75 days
137 Concrete Pouring of Pedestal & Column 1.75 days
138 Concrete Curing Time 12.25 days
139 Removal of Formworks column 1 day
140 Installation of Gr. Flr. CHB Wall 5.25 days
141 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days
142 Installation of Suspended slab Rebars 2nd flr 7 days
143 Installation of C-Joist 2nd flr 7 days
144 Concrete Pouring for Slab Topping 2nd flr 1.75 days
145 Installation of 2nd Flr Column Rebars 5.25 days
146 Installaton of Column forms and Scaffolding 3.5 days
147 Concrete Pouring 1.75 days
148 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days
149 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days
150 Curing Time 12.25 days
151 Installation of CHB Wall 2nd Flr 5.25 days
152 Removal of formworks 1.75 days
153 Installation of ceiling in ground flr 8.75 days
154 Installation of trusses baseplate & anchor bolts 5.25 days
155 Fabrication of Trusses 17.5 days
156 installation of trusses 10.5 days
157 Installation of Roofings gutter &facia board 7 roof drains 7 days
158 punch listing & substantial turn-over 3.5 days
159 Plastering of walls 8.75 days
160 Installation of Septic tanks & Catch basin 12.25 days
161 painting of all walls & installation of all balcony 14 days
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 1
Project: Site Development Phase 1Date: Wed 7/8/15
ID Task Name Duration
162 Installation of doors & windows 5.25 days
163 installation of Tiles 8.75 days
164 installation of stair rebars & formworks 2ndflr 3.5 days
165 Pouring of Concrete Stair 2 2ndflr 3.5 days
166 Curing time 12.25 days
167 Removal of Stair Formworks 1.75 days
168 Installation of stairrebar @ gr flr 7 days
169 installation of formworks stair 5.25 days
170 Conrete pouring stair gr 1.75 days
171 curing time 12.25 days
172 Removal of conrete stair formworks 1.75 days
173 installation of railing and watr proofing 5.25 days
174 testing & commission of plumbing & electrical works 10.5 days
175 installation of ceilings @ gr,2nd flr 12.25 days
176 WCQ TURNOVER 12.25 days
177 SOQ Mobilization 5.25 days
178 Construction of Tempacil & Utilities Facilities 12.25 days
179 Demolition of Existing Structure 5.25 days
180 Clearing & Grabbing 3.5 days
181 Layout / Survey 3.5 days
182 Structure Excavation 5.25 days
183 Soil Poisoning & Granel Bedding 5.25 days
184 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days
185 Installation of Grade Beam Rebars 5.25 days
186 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days
187 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days
188 Concrete Pouring for Foting & Grade Beams 3.5 days
189 Installationof Pedestal and Column Formworks 3.5 days
190 Slab On fill Gravel Bedding 1.75 days
191 Concrete Pouring of Slab on Fill 1.75 days
192 Concrete Pouring of Pedestal & Column 1.75 days
193 Concrete Curing Time 12.25 days
194 Removal of Formworks column 1 day
195 Installation of Gr. Flr. CHB Wall 5.25 days
196 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days
197 Installation of Suspended slab Rebars 2nd flr 7 days
198 Installation of C-Joist 2nd flr 7 days
199 Concrete Pouring for Slab Topping 2nd flr 1.75 days
200 Installation of 2nd Flr Column Rebars 5.25 days
201 Installaton of Column forms and Scaffolding 3.5 days
202 Concrete Pouring 1.75 days
203 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days
204 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days
205 Curing Time 12.25 days
206 Installation of CHB Wall 2nd Flr 5.25 days
207 Removal of formworks 1.75 days
208 Installation of ceiling in ground flr 8.75 days
209 Installation of trusses baseplate & anchor bolts 5.25 days
210 Fabrication of Trusses 17.5 days
211 installation of trusses 10.5 days
212 Installation of Roofings gutter &facia board 7 roof drains 7 days
213 punch listing & substantial turn-over 3.5 days
214 Plastering of walls 8.75 days
215 Installation of Septic tanks & Catch basin 12.25 days
216 painting of all walls & installation of all balcony 14 days
217 Installation of doors & windows 5.25 days
218 installation of Tiles 8.75 days
219 installation of stair rebars & formworks 2ndflr 3.5 days
220 Pouring of Concrete Stair 2 2ndflr 3.5 days
221 Curing time 12.25 days
222 Removal of Stair Formworks 1.75 days
223 Installation of stairrebar @ gr flr 7 days
224 installation of formworks stair 5.25 days
225 Conrete pouring stair gr 1.75 days
226 curing time 12.25 days
227 Removal of conrete stair formworks 1.75 days
228 installation of railing and watr proofing 5.25 days
229 testing & commission of plumbing & electrical works 10.5 days
230 installation of ceilings @ gr,2nd flr 12.25 days
231 SOQ TURN OVER 12.25 days
232 EPQ Mobilization 5.25 days
233 Construction of Tempacil & Utilities Facilities 12.25 days
234 Demolition of Existing Structure 5.25 days
235 Clearing & Grabbing 3.5 days
236 Layout / Survey 3.5 days
237 Structure Excavation 5.25 days
238 Soil Poisoning & Granel Bedding 5.25 days
239 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days
240 Installation of Grade Beam Rebars 5.25 days
241 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days
242 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days
243 Concrete Pouring for Foting & Grade Beams 3.5 days
244 Installationof Pedestal and Column Formworks 3.5 days
245 Slab On fill Gravel Bedding 1.75 days
246 Concrete Pouring of Slab on Fill 1.75 days
247 Concrete Pouring of Pedestal & Column 1.75 days
248 Concrete Curing Time 12.25 days
249 Removal of Formworks column 1 day
250 Installation of Gr. Flr. CHB Wall 5.25 days
251 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days
252 Installation of Suspended slab Rebars 2nd flr 7 days
253 Installation of C-Joist 2nd flr 7 days
254 Concrete Pouring for Slab Topping 2nd flr 1.75 days
255 Installation of 2nd Flr Column Rebars 5.25 days
256 Installaton of Column forms and Scaffolding 3.5 days
257 Concrete Pouring 1.75 days
258 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days
259 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days
260 Curing Time 12.25 days
261 Installation of CHB Wall 2nd Flr 5.25 days
262 Installation of Suspended Beam formworks & Scaffolding for 3rd flr 7 days
263 Installation of suspended slab rebars 3rd flr 5.25 days
264 installation of C- Joist 3rd flr 5.25 days
265 installation of Electrical ires,PVC pipes, Switches& accessoriesfor 3rd flr 7 days
266 Installation of Elecrical Rouughing-ins for 3rd flr 7 days
267 Concrete pouring for slab topping 3rd flr 1.75 days
268 Removal of formworks 1.75 days
269 installation of CHB wall at 3rd flr 8.75 days
270 Installation of trusses baseplate & anchor bolts 5.25 days
271 Fabrication of Trusses 17.5 days
272 installation of trusses 10.5 days
273 Installation of Roofings gutter &facia board 7 roof drains 7 days
274 punch listing & substantial turn-over 3.5 days
275 Plastering of walls 8.75 days
276 Installation of Septic tanks & Catch basin 12.25 days
277 painting of all walls & installation of all balcony 14 days
278 Installation of doors & windows 5.25 days
279 installation of Tiles 8.75 days
280 installation of stair rebars & formworks 2ndflr 3.5 days
281 Pouring of Concrete Stair 2 2ndflr 3.5 days
282 Curing time 12.25 days
283 Removal of Stair Formworks 1.75 days
284 installation 2nd flr rebars @ formworks 5.25 days
285 pouring of concrete stair 3rd flr 1.75 days
286 curing time 12.25 days
287 Removal of formworks 1.75 days
288 Installation of stairrebar @ gr flr 7 days
289 installation of formworks stair 5.25 days
290 Conrete pouring stair gr 1.75 days
291 curing time 12.25 days
292 Removal of conrete stair formworks 1.75 days
293 installation of railing and watr proofing 5.25 days
294 testing & commission of plumbing & electrical works 10.5 days
295 installation of ceilings @ gr,2nd & 3rd flr 12.25 days
296 EPQ TURN OVER 12.25 days
297 BOQ Mobilization 5.25 days
298 Construction of Tempacil & Utilities Facilities 12.25 days
299 Demolition of Existing Structure 5.25 days
300 Clearing & Grabbing 3.5 days
301 Layout / Survey 3.5 days
302 Structure Excavation 5.25 days
303 Soil Poisoning & Granel Bedding 5.25 days
304 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days
305 Installation of Grade Beam Rebars 5.25 days
306 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days
307 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days
308 Concrete Pouring for Foting & Grade Beams 3.5 days
309 Installationof Pedestal and Column Formworks 3.5 days
310 Slab On fill Gravel Bedding 1.75 days
311 Concrete Pouring of Slab on Fill 1.75 days
312 Concrete Pouring of Pedestal & Column 1.75 days
313 Concrete Curing Time 12.25 days
314 Removal of Formworks column 1 day
315 Installation of Gr. Flr. CHB Wall 5.25 days
316 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days
317 Installation of Suspended slab Rebars 2nd flr 7 days
318 Installation of C-Joist 2nd flr 7 days
319 Concrete Pouring for Slab Topping 2nd flr 1.75 days
320 Installation of 2nd Flr Column Rebars 5.25 days
321 Installaton of Column forms and Scaffolding 3.5 days
322 Concrete Pouring 1.75 days
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 2
Project: Site Development Phase 1Date: Wed 7/8/15
ID Task Name Duration
323 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days
324 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days
325 Curing Time 12.25 days
326 Installation of CHB Wall 2nd Flr 5.25 days
327 Removal of formworks 1.75 days
328 Installation of ceiling in ground flr 8.75 days
329 Installation of trusses baseplate & anchor bolts 5.25 days
330 Fabrication of Trusses 17.5 days
331 installation of trusses 10.5 days
332 Installation of Roofings gutter &facia board 7 roof drains 7 days
333 punch listing & substantial turn-over 3.5 days
334 Plastering of walls 8.75 days
335 Installation of Septic tanks & Catch basin 12.25 days
336 painting of all walls & installation of all balcony 14 days
337 Installation of doors & windows 5.25 days
338 installation of Tiles 8.75 days
339 installation of stair rebars & formworks 2ndflr 3.5 days
340 Pouring of Concrete Stair 2 2ndflr 3.5 days
341 Curing time 12.25 days
342 Removal of Stair Formworks 1.75 days
343 Installation of stairrebar @ gr flr 7 days
344 installation of formworks stair 5.25 days
345 Conrete pouring stair gr 1.75 days
346 curing time 12.25 days
347 Removal of conrete stair formworks 1.75 days
348 installation of railing and watr proofing 5.25 days
349 testing & commission of plumbing & electrical works 10.5 days
350 installation of ceilings @ gr,2nd flr 12.25 days
351 BOQ TURN OVER 12.25 days
352 MEQ Mobilization 5.25 days
353 Permits/ Survey/ Tempacil 14 days
354 Excavation 21 days
355 Soil Poisoning 1.75 days
356 Rebar Fabrication 113.75 days
357 Installation of Footing and Grade Beam Rebar 5.25 days
358 Installation of Ground Floor Column Rebar 8.75 days
359 Footing Concrete Footing 7 days
360 Installation of Grade Beam Rebar & CHB Vert. bar 5.25 days
361 Installation of Grade Beam Form Works 7 days
362 Installation of Ground FloorColumn Form works 8.75 days
363 Grade Beam Concrete Pouring 3.5 days
364 Pipe Trenching for Pipes 5.25 days
365 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 8.75 days
366 Ground Floor Column Concrete Pouring 1.75 days
367 Curing Time 12.25 days
368 CuringTime 12.25 days
369 Installation of 2nd Flr Beam Rebar 15.75 days
370 Installation of Ground Floor CHB Wall 5.25 days
371 Removal of Gr Flr Concrete Formworks 1.75 days
372 Installation of 2nd Floor Formworks 8.75 days
373 Concrete Pouring 2nd Flr Beams 3.5 days
374 Curing Time 8.75 days
375 Elevator Footing Rebar Installation 8.75 days
376 Elevator Footing Concrete Pouring 1.75 days
377 Fabrication & Installation of Elevator Wall Rebar 5.25 days
378 Curing Time 12.25 days
379 Elavator Wall Formworks 3.5 days
380 Elevator Wall Concrete Pouring 1.75 days
381 Curing Time 12.25 days
382 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 10.5 days
383 Installation of Slab C-joist 8.75 days
384 Instllation of 2nd Flr CHB Wall 5.25 days
385 Curing Time 12.25 days
386 Removal of 2nd Floor Beam formworks and Scaffolding 1.75 days
387 Installation of3rd FlrBeam Rebar 8.75 days
388 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 5.25 days
389 Installation of Electrical Rough-ins at 2nd Flr 12.25 days
390 Removal of 2nd Flr Concrete Form works 1.75 days
391 Installation of 3rd Flr Formworks 8.75 days
392 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 8.75 days
393 Installation of Electrical Roughing-in 2nd Flr 10.5 days
394 Concrte pouring 3rd Flr Beams 1.75 days
395 Curing Time 12.25 days
396 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 12.25 days
397 Installation of C-Joist 5.25 days
398 Curing Time 12.25 days
399 Installation of 3rd Flr CHB wall 8.75 days
400 Installation of 4th Flr Beam Rebar 12.25 days
401 removal of 3rd Flr Concrete Forms 3.5 days
402 Concrete Pouring of 4th Flr Beams 1.75 days
403 Concrete Poruing 2nd Flr Column 1.75 days
404 Concrete Pouring 3rd Flr Column 3.5 days
405 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 10.5 days
406 Installation of Electrical Roughing-Ins 3rd Floor 12.25 days
407 Curing Time 12.25 days
408 Installation of CHB Wall at 4th Flr 19.25 days
409 Installation of C-Joist@ 4th Flr 5.25 days
410 Installation of 4th Flr Column Rebar Form works & Scaffolding 14 days
411 Concfrete Pouring 4th Flr Column 1.75 days
412 Curing Time 12.25 days
413 removal of 4th Flr Concrete Forms 1.75 days
414 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 17.5 days
415 Installation of Electrical Roughing -Ins 5th Flr 17.5 days
416 Installation of Rebar5th Flr Beams 14 days
417 Installation of 5th Flr Formworks & Scaffolding 8.75 days
418 Concrete Pouring of 5th Flr Beams 1.75 days
419 Curing Time 12.25 days
420 Removal of Beam & Column Formworks & Scaffolding 3.5 days
421 Installation of C-Joist 5th Flr 8.75 days
422 Installation of Water Proofing 10.5 days
423 Installation of Plumbing Fixtures 8.75 days
424 Installation of Tiles 2nd-5th Flr 35 days
425 Plastering of all walls 10.5 days
426 Installation of External Tubular Frame Aesthetic 10.5 days
427 Installation of Exterior Canopy 10.5 days
428 Construction of Catch basin 10.5 days
429 painting of all external & internal walls 61.25 days
430 installation of all doors and windows and Hardwares 17.5 days
431 Installation of Elevated tank & Frames And Pipes Fittings 5.25 days
432 Construction of Septic Tank 21 days
433 Construction of Underground Reservoir & Fittings & Pumps 21 days
434 Construction of Genset Foundation 17.5 days
435 Punch Listing Substantial Turnover 5.25 days
436 MEQ TURN OVER 14 days
437 DEMOBILIZATION 14 days
438 Construction of slab on fill 3.5 days
439 Installation of elevator machine 5.25 days
440 SITE DEVELOPMENT TURN OVER 1.75 days
441 Punch listing & Substantial turnover 5.25 days
442 Final Turn over 3.5 days
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 3
Project: Site Development Phase 1Date: Wed 7/8/15
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 4
Project: Site Development Phase 1Date: Wed 7/8/15
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 5
Project: Site Development Phase 1Date: Wed 7/8/15
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 6
Project: Site Development Phase 1Date: Wed 7/8/15
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 7
Project: Site Development Phase 1Date: Wed 7/8/15
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 8
Project: Site Development Phase 1Date: Wed 7/8/15
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80
Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline
Page 9
Project: Site Development Phase 1Date: Wed 7/8/15
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 4.82 3.78
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 4.82 8.6
7.66
22.0414.38
5.78
8.84 6.12
30.88 37.00
2.11 16.55 9.29
39.11 55.66 64.96
5.91 3.14 12.8 2.45 2.88
70.87 86.81 89.2674.01 92.14 99.02
6.9 0.98 TOTAL = 100.00 %
TOTAL = 100.00 %99.02 100.00
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 4.82 3.78
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 4.82 8.6
7.66
22.0414.38
5.78
8.84 6.12
30.88 37.00
2.11 16.55 9.29
39.11 55.66 64.96
5.91 3.14 12.8 2.45
70.87 86.81 89.2674.01
2.88 6.88 0.98 TOTAL = 100.00 %
TOTAL = 100.00 %92.14 99.02 100.00
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 1.15 0.63 6.45 4.16 6.13
PLANNED CUMMULATIVE %
0.38
3.38 3.91 4.12 2.94 3.47 1.11 0.91 1.36 1.67 2.12
2.275.184.67
7.43 6.94 5.34 3.89 2.5
1.18 2.04 3.52 2.21 1.08
2.34 1.64 0.21 0.26 0.141.41
0.19 1.67 %100.00
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 1.25 0.63 6.45
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 1.25 1.88 8.74
0.41
2.29
5.98 3.25 4.42 3.91 5.4 4.8 3.8 1.4 0.8 2.45
14.72 17.97 22.39 26.30 31.7 36.5 40.3 41.7 42.5 44.95
8.56 1.45
53.5 54.96
6.8
61.76
4.83 7.21
74.81 82.02
2.255.97
67.73 69.98
5.34 1.26 3.5
87.36 88.62 92.12
2.31 1.7 0.3 1.8 1.5
94.43 96 96 98.22 100
0.26 100.00 %
100 100.00 %
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 2.77 0.544 1.2 8.78 2.27
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 2.77 3.312 4.5 13.3 15.6
5.09 6.01 16.6 9.3 6.057
20.7 27.8 44.4 54 59.71
1.12566
21.7981
8.875876 2.43 17.24
68.59 89.1069.43
0.8433
71.87
1.45 8.47 0.98 TOTAL =
90.55 99.02 100.00
100
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 4.82 3.78
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 4.82 8.6
7.66
22.0414.38
5.78
8.84 6.12
30.88 37.00
2.11 16.55 9.29
39.11 55.66 64.96
5.91 3.14 12.8 2.45 2.88 6.9
70.87 86.81 89.2674.01 92.14 99.02
0.98 TOTAL = 100.00 %
TOTAL = 100.00 %100.00
PLANNED % ACCOMPLISHMENT
PER WEEK (%) 4.82 3.78
PLANNED CUMMULATIVE %
ACCOMPLISHMENT 4.82 8.6
7.66
22.0414.38
5.78
8.84 6.12
30.88 37.00
2.11 16.55 9.29
39.11 55.66 64.96
5.91 3.14 12.8 2.45 2.88
70.87 86.81 89.2674.01 92.14
6.88 0.98 TOTAL = 100.00 %
TOTAL = 100.00 %99.02 100.00
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S MWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Wee
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,5226 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Installation of Suspended Beam formworks & Scaffolding for 3rd flr 4 days 3032 Installation of suspended slab rebars 3rd flr 3 days 3133 installation of C- Joist 3rd flr 3 days 3234 installation of Electrical ires,PVC pipes, Switches& accessoriesfor 3rd flr 4 days 3135 Installation of Elecrical Rouughing-ins for 3rd flr 4 days 3136 Concrete pouring for slab topping 3rd flr 1 day 33,34,3537 Removal of formworks 1 day 2938 installation of CHB wall at 3rd flr 5 days 36,37,5639 Installation of trusses baseplate & anchor bolts 3 days 3840 Fabrication of Trusses 10 days 2041 installation of trusses 6 days 39,40,44,45,47,48,6442 Installation of Roofings gutter &facia board 7 roof drains 4 days 4143 punch listing & substantial turn-over 2 days 42,6344 Plastering of walls 5 days 3645 Installation of Septic tanks & Catch basin 7 days 3646 painting of all walls & installation of all balcony 8 days 4147 Installation of doors & windows 3 days 3648 installation of Tiles 5 days 3649 installation of stair rebars & formworks 2ndflr 2 days 20,6150 Pouring of Concrete Stair 2 2ndflr 2 days 4951 Curing time 7 days 5052 Removal of Stair Formworks 1 day 5153 installation 2nd flr rebars @ formworks 3 days 3154 pouring of concrete stair 3rd flr 1 day 5355 curing time 7 days 5456 Removal of formworks 1 day 5557 Installation of stairrebar @ gr flr 4 days 1458 installation of formworks stair 3 days 5759 Conrete pouring stair gr 1 day 5860 curing time 7 days 5961 Removal of conrete stair formworks 1 day 6062 installation of railing and watr proofing 3 days 4663 testing & commission of plumbing & electrical works 6 days 6264 installation of ceilings @ gr,2nd & 3rd flr 7 days 3865 Cleaning turn over& demob 7 days 43
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T WWeek 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 W
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W Tek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Permits/ Survey/ Temfacil 8 days 13 Excavation 12 days 24 Soil Poisoning 1 day 35 Rebar Fabrication 65 days 36 Installation of Footing and Grade Beam Rebar 3 days 4,57 Installation of Ground Floor Column Rebar 5 days 68 Footing Concrete Footing 4 days 79 Installation of Grade Beam Rebar & CHB Vert. bar 3 days 6
10 Installation of Grade Beam Form Works 4 days 911 Installation of Ground FloorColumn Form works 5 days 812 Grade Beam Concrete Pouring 2 days 1013 Pipe Trenching for Pipes 3 days 314 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 5 days 1315 Ground Floor Column Concrete Pouring 1 day 1116 Curing Time 7 days 1217 CuringTime 7 days 1518 Installation of 2nd Flr Beam Rebar 9 days 1719 Installation of Ground Floor CHB Wall 3 days 1620 Removal of Gr Flr Concrete Formworks 1 day 1721 Installation of 2nd Floor Formworks 5 days 18,2022 Concrete Pouring 2nd Flr Beams 2 days 38,37,2123 Curing Time 5 days 2224 Elevator Footing Rebar Installation 5 days 1925 Elevator Footing Concrete Pouring 1 day 2426 Fabrication & Installation of Elevator Wall Rebar 3 days 2427 Curing Time 7 days 2528 Elavator Wall Formworks 2 days 26,2729 Elevator Wall Concrete Pouring 1 day 2830 Curing Time 7 days 2931 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 6 days 2232 Installation of Slab C-joist 5 days 2233 Instllation of 2nd Flr CHB Wall 3 days 2234 Curing Time 7 days 32,5235 Removal of 2nd Floor Beam formworks and Scaffolding 1 day 2236 Installation of3rd FlrBeam Rebar 5 days 23,33,3537 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 3 days 1838 Installation of Electrical Rough-ins at 2nd Flr 7 days 1839 Removal of 2nd Flr Concrete Form works 1 day 2340 Installation of 3rd Flr Formworks 5 days 36,39,3441 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 5 days 3642 Installation of Electrical Roughing-in 2nd Flr 6 days 3643 Concrte pouring 3rd Flr Beams 1 day 40,41,4244 Curing Time 7 days 4345 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 7 days 4346 Installation of C-Joist 3 days 4347 Curing Time 7 days 46,5348 Installation of 3rd Flr CHB wall 5 days 3649 Installation of 4th Flr Beam Rebar 7 days 44,4850 removal of 3rd Flr Concrete Forms 2 days 4451 Concrete Pouring of 4th Flr Beams 1 day 49,5052 Concrete Poruing 2nd Flr Column 1 day 3153 Concrete Pouring 3rd Flr Column 2 days 4554 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 6 days 5355 Installation of Electrical Roughing-Ins 3rd Floor 7 days 5356 Curing Time 7 days 51,5557 Installation of CHB Wall at 4th Flr 11 days 5658 Installation of C-Joist@ 4th Flr 3 days 51,5459 Installation of 4th Flr Column Rebar Form works & Scaffolding 8 days 51,4760 Concfrete Pouring 4th Flr Column 1 day 5961 Curing Time 7 days 58,60,6262 removal of 4th Flr Concrete Forms 1 day 5663 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 10 days 5764 Installation of Electrical Roughing -Ins 5th Flr 10 days 5765 Installation of Rebar5th Flr Beams 8 days 6166 Installation of 5th Flr Formworks & Scaffolding 5 days 6567 Concrete Pouring of 5th Flr Beams 1 day 6668 Curing Time 7 days 67,70,8069 Removal of Beam & Column Formworks & Scaffolding 2 days 6770 Installation of C-Joist 5th Flr 5 days 67,63,6471 Installation of Water Proofing 6 days 68,6972 Installation of Plumbing Fixtures 5 days 1473 Installation of Tiles 2nd-5th Flr 20 days 7274 Plastering of all walls 6 days 14,75,76,7375 Installation of External Tubular Frame Aesthetic 6 days 1476 Installation of Exterior Canopy 6 days 1477 Construction of Catch basin 6 days 1478 painting of all external & internal walls 35 days 7479 installation of all doors and windows and Hardwares 10 days 78,71,8680 Installation of Elevated tank & Frames And Pipes Fittings 3 days 7481 Construction of Septic Tank 12 days 1482 Construction of Underground Reservoir & Fittings & Pumps 12 days 1483 Construction of Genset Foundation 10 days 1484 Punch Listing Substantial Turnover 3 days 79,8785 Turn Over & Demob 8 days 8486 Construction of slab on fill 2 days 81,83,82,7787 Installation of elevator machine 3 days 30
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Permits/ Survey/ Tempacil 8 days 13 Excavation 8 days 24 Soil Poisoning 1 day 35 Rebar Fabrication 60 days 36 Installation of Footing and Grade Beam Rebar 3 days 4,57 Installation of Ground Floor Column Rebar 3 days 68 Footing Concrete Footing 2 days 79 Installation of Grade Beam Rebar & CHB Vert. bar 3 days 6
10 Installation of Grade Beam Form Works 2 days 911 Installation of Ground FloorColumn Form works 3 days 812 Grade Beam Concrete Pouring 2 days 1013 Pipe Trenching for Pipes 2 days 314 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 3 days 1315 Ground Floor Column Concrete Pouring 1 day 1116 Curing Time 7 days 1217 CuringTime 7 days 1518 Installation of 2nd Flr Beam Rebar 5 days 1719 Installation of Ground Floor CHB Wall 3 days 1620 Removal of Gr Flr Concrete Formworks 1 day 1721 Installation of 2nd Floor Formworks 3 days 18,2022 Concrete Pouring 2nd Flr Beams 2 days 38,37,2123 Curing Time 5 days 2224 Elevator Footing Rebar Installation 3 days 1925 Elevator Footing Concrete Pouring 1 day 2426 Fabrication & Installation of Elevator Wall Rebar 3 days 2427 Curing Time 7 days 2528 Elavator Wall Formworks 2 days 26,2729 Elevator Wall Concrete Pouring 1 day 2830 Curing Time 7 days 2931 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 3 days 2232 Installation of Slab C-joist 0.57 days 2233 Instllation of 2nd Flr CHB Wall 3 days 2234 Curing Time 7 days 32,5235 Removal of 2nd Floor Beam formworks and Scaffolding 1 day 2236 Installation of3rd FlrBeam Rebar 5 days 23,33,3537 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 3 days 1838 Installation of Electrical Rough-ins at 2nd Flr 5 days 1839 Removal of 2nd Flr Concrete Form works 1 day 2340 Installation of 3rd Flr Formworks 3 days 36,39,3441 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 5 days 3642 Installation of Electrical Roughing-in 2nd Flr 4 days 3643 Concrte pouring 3rd Flr Beams 1 day 40,41,4244 Curing Time 5 days 4345 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 4 days 4346 Installation of C-Joist 3 days 4347 Curing Time 7 days 46,5348 Installation of 3rd Flr CHB wall 3 days 3649 Installation of 4th Flr Beam Rebar 5 days 44,4850 removal of 3rd Flr Concrete Forms 2 days 4451 Concrete Pouring of 4th Flr Beams 1 day 49,5052 Concrete Poruing 2nd Flr Column 1 day 3153 Concrete Pouring 3rd Flr Column 2 days 4554 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 4 days 5355 Installation of Electrical Roughing-Ins 3rd Floor 7 days 5356 Curing Time 5 days 51,5557 Installation of CHB Wall at 4th Flr 8 days 5658 Installation of C-Joist@ 4th Flr 3 days 51,5459 Installation of 4th Flr Column Rebar Form works & Scaffolding 5 days 51,4760 Concfrete Pouring 4th Flr Column 1 day 5961 Curing Time 7 days 58,60,6262 removal of 4th Flr Concrete Forms 1 day 5663 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 8 days 5764 Installation of Electrical Roughing -Ins 5th Flr 8 days 5765 Installation of Rebar5th Flr Beams 5 days 6166 Installation of 5th Flr Formworks & Scaffolding 5 days 6567 Concrete Pouring of 5th Flr Beams 1 day 6668 Curing Time 7 days 67,70,8069 Removal of Beam & Column Formworks & Scaffolding 2 days 6770 Installation of C-Joist 5th Flr 3 days 67,63,6471 Installation of Water Proofing 4 days 68,6972 Installation of Plumbing Fixtures 3 days 1473 Installation of Tiles 2nd-5th Flr 20 days 7274 Plastering of all walls 3 days 14,75,76,7375 Installation of External Tubular Frame Aesthetic 6 days 1476 Installation of Exterior Canopy 6 days 1477 Construction of Catch basin 6 days 1478 painting of all external & internal walls 15 days 7479 installation of all doors and windows and Hardwares 8 days 78,71,8680 Installation of Elevated tank & Frames And Pipes Fittings 3 days 7481 Construction of Septic Tank 12 days 1482 Construction of Underground Reservoir & Fittings & Pumps 12 days 1483 Construction of Genset Foundation 10 days 1484 Punch Listing Substantial Turnover 3 days 79,8785 Turn Over & Demob 8 days 8486 Construction of slab on fill 2 days 81,83,82,7787 Installation of elevator machine 3 days 30
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S MWeek 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Wee
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 2 days
2 Demolition Works 9 days 1
3 Clearing and Grabbing 5 days 2
4 Hauling of unsuitable materials 3 days 2
5 Site Grading Cut and Fill 7 days 3,4
6 Road Tracing/ Survey Works 4 days 5
7 Pipe Trenching Storm Drainage 20 days 6
8 Pipe Trenching Sanitary Sewer Line 14 days 6
9 Pipe Trenching Water Line 17 days 6
10 Installation of Drainage Pipes and manholes & Beddings 34.29 days 7
11 Installation of Water Pipelines Gate valves, Pipe Fittings Thrust Blocks & Beddings 29 days 9
12 Installation of Fire Hydrants, Air release Valve and Blow off Vlave 7 days 13
13 Installation of Water Service Connection 8 days 11
14 Installation of Drainage Service Connection 5 days 10
15 Installation of Sanitary Sewer Service Connection 7 days 16
16 Installation of Sanitary Sewer Pipes and manholes & Beddings/ Force Main 15 days 8
17 BackFilling & Compaction Drainage Line 4 days 14,32
18 BackFilling & Compaction Water Line 6 days 12
19 backfilling & Compaction Sewer Line 3 days 15
20 Installation of Outfall Drainage Line 5 days 21
21 Installation of Outfall Drainage Structure 6 days 17
22 Preparation of Sub-base Course 5 days 6
23 Preparation of base Course 5 days 22
24 Preparation of Road Concrete Carriage way 20 days 25
25 installation of Kerb & Gutter & Kerb Inlet 17 days 23
26 Preparation of Base Course Sidewalk 7 days 27
27 Preparation of Sub-base Course Sidewalk 7 days 22
28 Installation of Sidewalk Concrete 12 days 26
29 Construction of Sanitary Sewage Treatment Plant (STP) 26 days 31
30 Construction of Lift Station 12 days 19,33
31 Installation of Lift Pumps & COntroller 3 days 30
32 Leak Testing of Drainage Pipes 1 day 14
33 Leak Testing of Sewer Pipes 1 day 15
34 hauling of excess Materials 5 days 20
35 Demob 1 day 37
36 Punch listing & Substantial turnover 3 days 34,29,18,24,28
37 Final Turn over 2 days 36
M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M TWeek 1 Week 2 Week 3 Week 4 Week 5 W
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: Site Development Phase 1Date: Tue 6/30/15
T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M Tek 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 W
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: Site Development Phase 1Date: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T WWeek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
ID Task Name Duration Predecessors
1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 W
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 1
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Wek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19
Task
Critical Task
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Critical Task
Rolled Up Milestone
Rolled Up Progress
Split
External Tasks
Project Summary
Group By Summary
Deadline
Page 2
Project: EPQ 3 storey Bldg.Date: Tue 6/30/15