Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction...

32
In a Slowdown, Opportunity Knocks for Smaller Businesses Wednesday April 30, 2008 2:10—3:25 PM

Transcript of Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction...

Page 1: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

In a Slowdown, Opportunity Knocks

for Smaller Businesses

Wednesday April 30, 2008

2:10—3:25 PM

Page 2: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Opportunity Knocks for

Smaller Business

• Presented to:

• Milken Institute

• Presented by:

• Eric Zuziak, AIA, Principal, Director of

Design

• JZMK Partners

• www.jzmkpartners.com

• April 30, 2008

Page 3: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Introduction

Current & completedproject locations:

• United StatesMainland

• Hawaii• Alaska• Mexico• Virgin Islands• Costa Rica• Puerto Rico• China• Egypt• India• Jordan• Morocco• Turkey• Dubai, UAE• Abu Dhabi, UAE

Comprehensive expertise

includes:

Land Use Analysis

Feasibility Studies

Site Planning

Resort Planning

Urban Design

Programming

Design Guidelines

Architectural Design

Construction Documents

Construction Administration

Page 4: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Challenges in Marketplace

• Maintaining workload backlog in a retracting

domestic market

• Changing to international clientele/ structure for

delivery of services (shift in phase of work type)

• International collections AR days high

Domestic collections AR days now higher

• Fee erosion by competition in domestic markets

Page 5: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Why Asia?

• Strong demand for Western concepts of community design.

American Architects in high demand abroad.

• Large growing middle class with access to capital

• Ability to expand scope of project types

• High Rise

• Resort

• Focus on quality of built projects

• Quick phase turnaround of project schedules

• Better potential margins with devaluation of dollar

Page 6: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Web Presence

INTERNATIONAL

URBAN DESIGN

New Communities Neighborhoods ResortsSingle -Family Multi -Family Custom

Civic Education Recreation

SeniorHigh-Rise Resort

Urban Infill Base Re -Use Mixed -Use

Asia Americas Middle East

Page 7: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

International Opportunities

2003 Nanjing, China 2005 Dubai, UAE

Page 8: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Geographic distribution of

revenue sources

Page 9: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

AR days outstanding

Page 10: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

International Marketing

• Reinforcing web presence to showcase

international project experience

• Traveling to where the work is. Adding meetings

with prospective clients onto workshop trips with

existing clients.

• Developing JV relationship in Shanghai, China

• Developing JV relationship in Dubai, UAE

• Opening small office in Vancouver BC

• Relationship building with key clients

• Giving project tours to visiting international groups

in So Cal

Page 11: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Lessons Learned

• Technical expertise of Asian firms far more

sophisticated than before

• Outsourcing drafting and rendering services

overseas where possible

• International projects require large

“commencement fee” prior to start. Pay in advance

of phase. Mitigates AR aging issues.

• Streamline project delivery efficiency through

workshops in host country locations

• Focus on high value projects & clientele

• Negotiate solid terms and clear deliverables

Page 12: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Restructuring Actions

JZMK DOMESTIC PHASE MODEL

• Restructured firm staff and size to shift expertise

more to design side. Flexibility of staff to multiphase

capabilities is key

• Coordination and communication with local

architect is critical

LAND PLANNING

BUILDING DESIGN DESIGN DEV.

JZMK INTERNATIONAL PHASE MODEL LOCAL ARCHITECT

Page 13: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Opportunity Knocks

Page 14: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Rafael Pastor

Chief Executive Officer

Vistage International

Page 15: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

The importance of looking

outside the United States

Page 16: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Where do you spend money?

Page 17: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Who are the people behind

the business?

Page 18: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Investments are declining

Page 19: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Confidence is declining

Page 20: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Where is sales revenue going?

Page 21: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Verne Harnish

Chief Executive Officer

Gazelles, Inc.

Page 22: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Gazelles in business

"Every morning in Africa, a gazelle wakes

up. It knows it must run faster than the

fastest lion or it will be killed...every

morning a lion wakes up. It knows it must

outrun the slowest gazelle or it will starve

to death. It doesn't matter whether you

are a lion or a gazelle...when the sun

comes up, you'd better be running."

"Every morning in Africa, a gazelle wakes

up. It knows it must run faster than the

fastest lion or it will be killed...every

morning a lion wakes up. It knows it must

outrun the slowest gazelle or it will starve

to death. It doesn't matter whether you

are a lion or a gazelle...when the sun

comes up, you'd better be running."

Page 23: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

SummarySummary

• Control the Ink

• Focus On What’s Working

• Best Customers

• Go Global – Follow your customers

Page 24: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Controlling the Ink

Page 25: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Appreciative Inquiry

Focus on What’s

Working

Page 26: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Life Line Exercise

Page 27: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

www.advancedcircuits.com

Page 28: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

The showroom

Page 29: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

www.rackspace.com

Page 30: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Going Global

Page 31: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a

Bias for Action

“On the plains of hesitation, bleach the bones

of countless millions, who, at the dawn of

victory sat down to rest, and resting, died.”

Page 32: Wednesday April 30, 2008 2:10—3:25 PM · Architectural Design Construction Documents Construction Administration. Challenges in Marketplace • Maintaining workload backlog in a