Webinar Bim Forum Bim After Construction Final Copyright Version

23
After Construction Birgitta Foster SSA/Sandia National Labs February 19, 2010

TAGS:

description

A Presentation by Birgitta Foster relating to BIM.

Transcript of Webinar Bim Forum Bim After Construction Final Copyright Version

Page 1: Webinar Bim Forum Bim After Construction Final Copyright Version

AfterConstruction

Birgitta FosterSSA/Sandia National Labs

February 19, 2010

Page 2: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

1945 : Sandia was created

1979 :Sandia was made a national laboratory.

Mission :Nuclear stockpile stewardshipHomeland security

Antiterrorism/Aviation security

Tech Transfer

Page 3: Webinar Bim Forum Bim After Construction Final Copyright Version

www.sandia.gov

Page 4: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

Four sites ( ~ 1100 bldg, 7M GSF)

NM (Albuquerque ) CA (Livermore) NV (Tonopah) HI (Kauai)

Sandia NM 891 Bldgs 6M GSF 8700 acres

Construction : $80 M /YR

Page 5: Webinar Bim Forum Bim After Construction Final Copyright Version

Building Information Models (BIM)

BIM is a database of Building Information

Stores InformationLinks to informationALSO….Extracts informationExchange information

BIM = Information

Page 6: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM after Construction

Space Planning

Safety/Security

Facility Management System - ( FMS)

Facility Control Systems - (FCS)

Asset Management applications

Operation & Maintenance

Page 7: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

Building Information

Specifications

Submittal InformationEquipment dataPerformance dataWarranty

Finishes Information

O&M manuals

Panel Schedules

Building Controls System

Page 8: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

Building Information Applications

Page 9: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM : Facilities Operations & Maintenance

Page 10: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM : Exchanges Information

Equipment data

Asset

info

Room

Info

FMS : Tririga/ Maximo

Page 11: Webinar Bim Forum Bim After Construction Final Copyright Version

BIM: Untapped SavingsIn

form

ati

on

Valu

e

TimePlanning

ConstructionDesign

Operation

$$$$

$$$

Page 12: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM : Due Diligence Investigation

Shadow project Partnerships

Software

Pulsing Industry

O&M Planning

Data Integration

Page 13: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

Accurate As Built Models

Retrofits

Migration to BIM

Attracting new Customers

BIM : Laser scanning

2D

Page 14: Webinar Bim Forum Bim After Construction Final Copyright Version

BIM : Bldg Operations Training

Pantex complex Amarillo, Texas. (CH2M-Hill)

Page 15: Webinar Bim Forum Bim After Construction Final Copyright Version

BIM : Untapped Savings

Inefficiency Costs : $15B/yr

66% borne by Owners

Unit cost : $ 0.20/SFT (existing space)

Est. Costs for Sandia : 6.0 M GSF ~$1.2M / yr

Page 16: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM : Untapped Savings

NIST Study Validation: “View of the Future “ videoIn-House Planner Survey

ResultsSaves ~2 hours per work order (WO)

2 hrs x $50/hr = $100/hr 24,000 WO/yr

Cost Savings : $2.4 M/year Annual Budget : $14M/yr

Page 17: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM :Closing the Information Gap

Paper-based

Inherent Inefficiencies Reentry data Multiple databases Handoffs Locating Information

But what if it could be like this…………

Page 18: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

Page 19: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM for OperationsOwners : How to get started

Start with O&M group What information is needed IT and O&M meeting

FMS Import options Selected preferred import format Determine fields

Use on Pilot project

Page 20: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM : Sandia Facilities

FMSINTERFA

CE(Excel -Manual)

O/O Integrat

edMODEL

INTERFACE(Excel –

Extracted)

PHASE A

PHASE C

PHASE B

SEAMLESS

Owner/Operator Integrated model

Software Migration plan ( Road map) Internal processes

BIM team Model Management

Meeting with IT and O&M FMS Import options Selected preferred import formatDetermine fields

Use on Pilot project

Migration plan in process Seamless integration – bi

directional Receiving O/O Integrated

models O&M with models

Menu

Page 21: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM: What’s holding Owners back?

What Owners want : Save moneyCentralized Data repositorySeamless integration with FMS applications

Save money $$$

Concerns :Education on BIM

Updating Model information

O&M Savings are not immediate

Model sharing

Page 22: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM for Owners :What can the Contractors do?

Educate the Owner BIM = Information

Focus O&M savings

Show a model to their O&M teamHyperlinks “ How much time would this save?”

Facilities Management System(s)

Page 23: Webinar Bim Forum Bim After Construction Final Copyright Version

Copyright 2010 by Birgitta Foster

BIM After Construction

QUESTIONS ?Birgitta Foster

[email protected]

BIMworkx.com