Webinar Bim Forum Bim After Construction Final Copyright Version
-
Upload
kurt-von-ahnen -
Category
Technology
-
view
24 -
download
0
description
Transcript of Webinar Bim Forum Bim After Construction Final Copyright Version
AfterConstruction
Birgitta FosterSSA/Sandia National Labs
February 19, 2010
Copyright 2010 by Birgitta Foster
1945 : Sandia was created
1979 :Sandia was made a national laboratory.
Mission :Nuclear stockpile stewardshipHomeland security
Antiterrorism/Aviation security
Tech Transfer
www.sandia.gov
Copyright 2010 by Birgitta Foster
Four sites ( ~ 1100 bldg, 7M GSF)
NM (Albuquerque ) CA (Livermore) NV (Tonopah) HI (Kauai)
Sandia NM 891 Bldgs 6M GSF 8700 acres
Construction : $80 M /YR
Building Information Models (BIM)
BIM is a database of Building Information
Stores InformationLinks to informationALSO….Extracts informationExchange information
BIM = Information
Copyright 2010 by Birgitta Foster
BIM after Construction
Space Planning
Safety/Security
Facility Management System - ( FMS)
Facility Control Systems - (FCS)
Asset Management applications
Operation & Maintenance
Copyright 2010 by Birgitta Foster
Building Information
Specifications
Submittal InformationEquipment dataPerformance dataWarranty
Finishes Information
O&M manuals
Panel Schedules
Building Controls System
Copyright 2010 by Birgitta Foster
Building Information Applications
Copyright 2010 by Birgitta Foster
BIM : Facilities Operations & Maintenance
Copyright 2010 by Birgitta Foster
BIM : Exchanges Information
Equipment data
Asset
info
Room
Info
FMS : Tririga/ Maximo
BIM: Untapped SavingsIn
form
ati
on
Valu
e
TimePlanning
ConstructionDesign
Operation
$$$$
$$$
Copyright 2010 by Birgitta Foster
BIM : Due Diligence Investigation
Shadow project Partnerships
Software
Pulsing Industry
O&M Planning
Data Integration
Copyright 2010 by Birgitta Foster
Accurate As Built Models
Retrofits
Migration to BIM
Attracting new Customers
BIM : Laser scanning
2D
BIM : Bldg Operations Training
Pantex complex Amarillo, Texas. (CH2M-Hill)
BIM : Untapped Savings
Inefficiency Costs : $15B/yr
66% borne by Owners
Unit cost : $ 0.20/SFT (existing space)
Est. Costs for Sandia : 6.0 M GSF ~$1.2M / yr
Copyright 2010 by Birgitta Foster
BIM : Untapped Savings
NIST Study Validation: “View of the Future “ videoIn-House Planner Survey
ResultsSaves ~2 hours per work order (WO)
2 hrs x $50/hr = $100/hr 24,000 WO/yr
Cost Savings : $2.4 M/year Annual Budget : $14M/yr
Copyright 2010 by Birgitta Foster
BIM :Closing the Information Gap
Paper-based
Inherent Inefficiencies Reentry data Multiple databases Handoffs Locating Information
But what if it could be like this…………
Copyright 2010 by Birgitta Foster
Copyright 2010 by Birgitta Foster
BIM for OperationsOwners : How to get started
Start with O&M group What information is needed IT and O&M meeting
FMS Import options Selected preferred import format Determine fields
Use on Pilot project
Copyright 2010 by Birgitta Foster
BIM : Sandia Facilities
FMSINTERFA
CE(Excel -Manual)
O/O Integrat
edMODEL
INTERFACE(Excel –
Extracted)
PHASE A
PHASE C
PHASE B
SEAMLESS
Owner/Operator Integrated model
Software Migration plan ( Road map) Internal processes
BIM team Model Management
Meeting with IT and O&M FMS Import options Selected preferred import formatDetermine fields
Use on Pilot project
Migration plan in process Seamless integration – bi
directional Receiving O/O Integrated
models O&M with models
Menu
Copyright 2010 by Birgitta Foster
BIM: What’s holding Owners back?
What Owners want : Save moneyCentralized Data repositorySeamless integration with FMS applications
Save money $$$
Concerns :Education on BIM
Updating Model information
O&M Savings are not immediate
Model sharing
Copyright 2010 by Birgitta Foster
BIM for Owners :What can the Contractors do?
Educate the Owner BIM = Information
Focus O&M savings
Show a model to their O&M teamHyperlinks “ How much time would this save?”
Facilities Management System(s)
Copyright 2010 by Birgitta Foster
BIM After Construction
QUESTIONS ?Birgitta Foster
BIMworkx.com