WDNR Citizen Based Stream Monitoring Pilot Project: (VERY) Preliminary Results

14
WDNR Citizen Based Stream Monitoring Pilot Project: (VERY) Preliminary Results Wisconsin Citizen Based Monitoring Conference, October 5, 2006 Ellison Bay, WI

description

WDNR Citizen Based Stream Monitoring Pilot Project: (VERY) Preliminary Results. Wisconsin Citizen Based Monitoring Conference, October 5, 2006 Ellison Bay, WI. The Issue. - PowerPoint PPT Presentation

Transcript of WDNR Citizen Based Stream Monitoring Pilot Project: (VERY) Preliminary Results

Page 1: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

WDNR Citizen Based Stream Monitoring Pilot

Project: (VERY) Preliminary Results

Wisconsin Citizen Based Monitoring Conference,

October 5, 2006

Ellison Bay, WI

Page 2: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

The Issue

Can Citizen Stream Monitors collect data of sufficient quality to be used by WDNR and other agencies for management decisions?

Page 3: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

CBM Pilot Project 2006• Groups to gather data using WDNR protocols

(Level 2 – Baseline Wadeable Streams)• 2006 pilot has 15 groups, 42 teams, 112

volunteers• ~180 sites Monitored

Page 4: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

•Dissolved oxygen – meter

•pH – meter

•Water temp: meter (during sampling)

•Water temp: thermistor (data logger)

•Turbidity: 120 cm transparency tube

•Volunteers encouraged to continue to sample other parameters using WAV, et. al., protocols

CBM Pilot Project Sampling Parameters

Page 5: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

CBM Pilot Project

Preliminary Results

Page 6: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

General Results

• Picked 15 groups out of >40 candidate groups

• 112 volunteers in 42 monitoring teams

• Orientation, training/certification of all volunteers

• >50% of teams were “re-certified”

• Side-by-side monitoring was done where possible

Page 7: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

General Results

• Can Volunteers Collect Quality Data?– ABSOLUTELY!

Page 8: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

General Results• Overall, volunteers were very successful!• Minor Performance Issues:

– Timely submission of data – Adherence to primary sample schedule (mostly weather)– pH meter calibration– Thermistor logs and recovery– “Green” volunteers req’d far more attention

• Re-certification:– Transparency Tube– pH Meter

• SWIMS Rollout Late– Volunteers couldn’t enter data– Data still being entered; no monitoring results available

Page 9: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

Dissolved Oxygen• Large proportion (~30%) side-by-side YSI 550A readings outside acceptable error

range• Temperature readings EXTREMELY consistent

Page 10: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

pH

• All side-by-side readings within error range• Calibration confused some volunteers

Page 11: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

H2O Temp-Thermistors

• >80 issued by CBSM Pilot or purchased by groups

• At least four have been lost (theft/washouts/etc.)– Within acceptable range

• Timing of removal/download an issue (late in Sept.)

• Record Keeping (thermistor log maintenance/submission) a problem

Page 12: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

Transparency Tubes

• Most Subjective of parameters

• Difference in tube manufacture Most streams had high transparency

• (>120 cm)

• Highest error rate in re-certification– Reading in direct sunlight

Page 13: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

Future of CBSM Pilot

• WILL continue in 2007• Coordinator will be LTE: 50% WDNR and 50% RAW• Will recommend adding 1 more group per region • Will recommend adding macroinvertebrates to parameters• Issues:

– Manpower (coordinator and liaisons)

– $$$$

– Controlling expectations of volunteers

Page 14: WDNR Citizen Based Stream Monitoring Pilot Project:  (VERY) Preliminary Results

Questions?