WCSIF NCSN Status & TSMs: 3 Oct 2019 1 - Western Cape · 2019. 10. 7. · WCSIF NCSN Status & TSMs:...

35
1 WCSIF NCSN Status & TSMs: 3 Oct 2019

Transcript of WCSIF NCSN Status & TSMs: 3 Oct 2019 1 - Western Cape · 2019. 10. 7. · WCSIF NCSN Status & TSMs:...

  • 1 WCSIF NCSN Status & TSMs: 3 Oct 2019

  • RSA National Control Survey Networks

    Precise Levelled network benchmarks – Land Levelling Datum (Vertical Datum);

    Trigonometrical Beacon - Hartebeesthoek 94 Datum (Horizontal Datum);

    Town Survey Schemes – (Horizontal and Vertical Datum extension);

    TrigNet – Continuous Operating Reference System (CORS) ( ITRF);

    SAGeoid2010 Model – Hybrid Geoid.

    WCSIF NCSN Status & TSMs: 3 Oct 2019 2

  • 3

    DATA SET DEFINITIONS

    LAND SURVEY ACT (Act 8 of 1997) Definitions:

    'trigonometrical station' means any survey station, including a town survey mark, erected by or under direction of the Chief Director as part of the national control survey system and for which he or she has published, or intends to publish, official co- ordinate values, and includes such other stations as may be prescribed.

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • 4

    ‘Town Survey Mark’ means surveyed points located in defined areas, such as cities and towns, that form part of the National Control Survey System. Each has horizontal coordinates (and some have a height) that are used by surveyors for local survey projects. The mark generally consists of a brass peg embedded in the centre of a concrete block, which is placed below the tarred road surface and protected by a heavy iron cover.

    ‘Trigonometrical Beacon’ means surveyed points located in elevated positions, such as mountain tops and man-made structures, that form part of the National Control Survey Network. Each has a horizontal coordinate and a height. The beacon generally consists of a white concrete pillar with a detachable black vane or signal placed at its centre. They are commonly referred to as Trig Beacons.

    WCSIF NCSN Status & TSMs: 3 Oct 2019

    DATA SET DEFINITIONS

  • 5

    ‘TSM Scheme’ means a network of Town Survey Marks located in a defined area, such as a city or town, which has been officially established through publication in the Government Gazette.

    ‘TrigNet’ means South Africa's network of Continuously Operating Reference Stations (CORS). It streams Global Navigation Satellite Systems (GNSS) data to a Control Centre where it is processed and made available to users.

    ‘Benchmark' means precise levelled points located along main road transport routes, that form part of the National Control Survey System. Each has a height that are used by surveyors for local survey projects. The mark generally consists of a brass peg embedded in the centre of a concrete block.

    WCSIF NCSN Status & TSMs: 3 Oct 2019

    DATA SET DEFINITIONS

  • Trigonometrical Beacons: 29,437 monuments, 9,845 selected for maintenance;

    6

    Geodesy: Base Datasets Identified

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • Town Survey Mark Schemes: 131 TSM Schemes, 28,964 monuments;

    7

    Geodesy: Base Datasets Identified

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • Benchmarks: 20,431 monuments;

    8

    Geodesy: Base Datasets Identified

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • TrigNet Global Navigation Satellite Systems (GNSS) Base-station network – Continuously Operating Reference System (CORS): 67 Stations;

    9

    Geodesy: Base Datasets Identified

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • Geoid Model: SAGeoid2010.

    10

    Geodesy: Base Datasets Identified

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • 11

    CONTRIBUTING CUSTODIANS

    NGI is the Base Data Custodian, with no Contributing Custodians, for the following geospatial datasets:

    Trigonometrical Beacons;

    Town Survey Mark Schemes;

    Benchmarks;

    TrigNet Global Navigation Satellite Systems (GNSS) Base-station network (CORS);

    Geoid Model – derived from gravimetric dataset (CGS).

    WCSIF NCSN Status & TSMs: 3 Oct 2019

  • Hartebeesthoek94 Datum

    Reference surface:

    Name: World Geodetic System 1984 ellipsoid;

    Defining parameters:

    Semi-major axis (a): 6378137.0m;

    Ellipsoid flattening (f): 1/298.257223563;

    Angular velocity of the earth (ω): 7292115.0 x 10-11 radians/second;

    Earth’s gravitational constant (GM): 3986004.418 x 108 m3/sec2.

    Three-dimensional Origin and Orientation:

    Name: Hartebeesthoek Radio Astronomy Telescope, Pretoria (IERS

    name: 30302S001 HARTEBEESTHOEK VLBI 7232);

    Position: International Terrestrial Frame 1991 (ITRF1991) epoch 1994.0

    (0h00 SAST, 1 January 1994);

    Orientation: Global Positioning System (GPS) Broadcast Ephemeris.

    Scale: 1 (No scale factor applied).

    WCSIF NCSN Status & TSMs: 3 Oct 2019 12

  • Reference surface: Adopted mean sea level;

    Vertical Origin and Orientation:

    Based on mean sea level determined from tidal observations at Cape

    Town, 1900 and 1907. Verified by mean sea level determinations from

    tidal observations at Durban, Port Elizabeth and East London, over

    varying periods of time. These adopted mean sea levels were referred to

    datum bench marks, and, subsequently, to the fundamental bench marks.

    The heights, above adopted mean sea level, of the datum bench marks,

    at the four principal ports. (See Table 1)

    These heights were adopted for the original adjustment of the levelling

    circuits, which commenced in 1943.

    Note: No final adjustment of the levelling circuits has been completed till

    present.

    Normal to the Geoid.

    Scale: 1 (No scale factor applied).

    Land Levelling Datum

    WCSIF NCSN Status & TSMs: 3 Oct 2019 13

  • Land Levelling Datum

    WCSIF NCSN Status & TSMs: 3 Oct 2019 14

  • Land Levelling Datum

    WCSIF NCSN Status & TSMs: 3 Oct 2019 15

  • Land Levelling Datum

    Port Datum Height above

    MSL (metre)

    Cape Town Harbour datum (LWOST)

    BM1

    FBM Cape Town

    - 0.678m

    + 3.589m

    + 5.432m

    Durban BM Post Office

    FBM Durban

    + 3.069m

    +10.592m

    Port Elizabeth B.M. PE1

    PE1A

    PE3

    PE4

    FBM Port Elizabeth

    + 4.278m

    + 4.292m

    +10.327m

    +14.232m

    +72.680m

    East London Neates beacon

    FBM. East London

    + 5.114m

    + 3.336m Table 1: Adopted Mean Sea Level

    WCSIF NCSN Status & TSMs: 3 Oct 2019 16

  • SAGI Technology Update Workshop: 1 September 2017

    TRIG. BEACON MAINTENANCE

    In July 2006 subset of 9,836 trigonometrical beacons retained within beacon

    maintenance program. Criteria used:

    Primary and secondary beacons requiring less than two hour’s climb;

    Block/Platform beacons in excess of 4 metres;

    Beacons located on man-made structures;

    Wind pump tower and pipe beacons;

    Tertiary beacons supplementing the above to ensure adequate horizontal

    control coverage around built-up/development areas.

    2,622 international boundary beacons and 67 TrigNet stations maintained.

    Total: 12,525.

    WCSIF NCSN Status & TSMs: 3 Oct 2019 17

  • TrigNet Stations 1999 (4 stations) Langebaan Cape Town Hermanus Pretoria 2000 (14 stations) Bethlehem Bloemfontein Calvinia De Aar Durban East London George Kimberley Ladysmith Port Elizabeth Pietermaritzburg Springbok Ulundi Mthatha 2001 (5 stations) Ellisras Middelburg Nelspruit Phalaborwa Pietersburg (Polokwane) 2002 (5 stations) Ermelo Kuruman Kroonstad Mafikeng Upington 2003 (3 stations) Aliwal North Graaff-Reinet Thohoyandou

    VRS: Gauteng

    VRS: KZN

    VRS: W Cape

    WCSIF NCSN Status & TSMs: 3 Oct 2019 18

    2004 (3 stations) Beaufort West Prieksa Queenstown 2005 (3 stations) Groblersdal Nylstroom (Modimolle) Steelpoort (Mangabane) 2006 (4 stations) Grahamstown Malmesbury Stellenbosch Sutherland

    2007 (3 stations) Benoni Krugersdorp Vereeniging 2008 (7 stations) Brits Bronkhorstspruit Heidelberg Ixopo Mooirivier Scottburgh Stanger

    2009 (2 stations) Greytown Worcester 2010 (3 stations) Bhisho Cape Point Orkney 2011 (1 station) Potgietersrus (Mokopane) 2012 (6 stations) Kokstad Newcastle Plettenberg Bay Richards Bay Secunda Welkom 2013 (2 stations) Rustenburg Steenbras Dam

  • TrigNet Users:

    Users register on TrigNet website (www.trignet.co.za) to access real-time

    services;

    Post processing data downloaded via the ftp site (ftp.trignet.co.za);

    Registered users receive e-mails, letters and notifications relating to

    TrigNet. Website has Status Messages relating to health of Trignet

    stations. A Twitter account has been created to serve as an additional

    communication mechanism (“TrigNet South Africa” → @TrigNet_RSA);

    TrigNet

    WCSIF NCSN Status & TSMs: 3 Oct 2019 19

    http://www.trignet.co.za/ftp://ftp.trignet.co.za/

  • TrigNet

    WCSIF NCSN Status & TSMs: 3 Oct 2019 20

  • TrigNet - proposed base-stations

    Bredasdorp Swellendam

    Vredendal

    Pofadder

    Alldays Thabazimbi

    Cradock Butterworth Colesberg Douglas

    Vryburg Bloemhof Ficksburg

    Pongola Paulpietersburg Vrede Carolina

    WCSIF NCSN Status & TSMs: 3 Oct 2019 21

  • TrigNet coverage (50km radius)

    WCSIF NCSN Status & TSMs: 3 Oct 2019 22

  • TrigNet coverage (100km radius)

    WCSIF NCSN Status & TSMs: 3 Oct 2019 23

  • SA Geoid Model 2010 In 2007, the Chief Directorate: National Geo-spatial Information (NGI)

    commenced with the development of an accurate geoid model for South Africa,

    with the aim to convert ellipsoidal heights, determined using NGI's TrigNet

    GNSS Basestations, to orthometric heights on the South African Land Levelling

    Datum, to an accuracy of 10 cm (design requirements).

    South African geoid model 2010 (SAGM2010) relates gravimetric model to the

    Land Leveling Datum.

    The SAGM2010 is a hybrid model as the gravimetric model was tilted to model

    the geoidal heights (diff. between ellipsoidal and orthometric heights) for the

    control group of benchmarks.

    The SAGM2010 consists of grid of geoidal heights spaced at 2½’ intervals

    (±4.5km) across South Africa. The accuracy of the SAGM2010 is

    approximately 7cm.

    WCSIF NCSN Status & TSMs: 3 Oct 2019 24

  • SAGeoid Model 2010

    The SAGeoid Model 2010 is a hybrid model as the gravimetric model was tilted to model the geoidal heights (diff. between ellipsoidal and orthometric heights) for the control group of benchmarks.

    The SAGM2010 consists of grid of geoidal heights spaced at 2½’ intervals (±4.5km) across South Africa. The accuracy of the SAGM2010 is approximately 7cm.

    WCSIF NCSN Status & TSMs: 3 Oct 2019 25

  • Existing TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 26

  • Existing TSM Schemes

    Area EXISTING

    Towns %

    of total Existing

    TSM

  • TOWN SURVEY MARK SCHEMES

    LAND SURVEY ACT 8 OF 1997

    42 Town survey marks

    (1) If the Chief Director is satisfied that town survey marks should be officially

    erected in any area or part of an area under the jurisdiction of a local

    authority, to enable the positions of the corner points of all pieces of land

    therein to be accurately determined, he or she may order the erection and

    survey of such town survey marks as provided in this section.

    (4) (a) A local authority shall within its area of jurisdiction be responsible for

    the maintenance to the satisfaction of the Chief Director, of any town survey

    marks erected in terms of this section, and should the local authority fail to

    maintain any town survey mark the Chief Director may undertake any

    necessary work at the expense of that local authority.

    (b) A local authority established after the commencement of this Act shall by

    the mere fact be responsible for the maintenance of the town survey marks

    which were erected within its area of jurisdiction before its establishment.

    WCSIF NCSN Status & TSMs: 3 Oct 2019 28

  • Proposed TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 29

  • Proposed TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 30

  • Proposed TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 31

  • Proposed and Current TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 32

  • Proposed (Prioritised) TSM Schemes

    WCSIF NCSN Status & TSMs: 3 Oct 2019 33

  • Proposed TSM Schemes

    Area NEW

    Towns %

    of total TSM Req.

  • 35

    THAT’S IT FOLKS!!

    THANK YOU!!

    WCSIF NCSN Status & TSMs: 3 Oct 2019