WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team...
-
Upload
morris-miles -
Category
Documents
-
view
212 -
download
0
Transcript of WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team...
WCMS Report
Web Advisory Committee
April 2010
Joining the Teams
• WCMS and Redesign Team collaborating extensively;– In May to develop functional requirements– In Phase 1 and Phase 2 to develop Uwaterloo
Main site;
Schedule
April• Meeting w/ other universities using Drupal • Obtaining additional Drupal knowledge via
conference • Developing rapid prototypes to learn about
Drupal
Schedule
May• Define and implement hardware (system
architecture) to run Drupal • Finalize web design functional
requirements specifications (with Redesign Team)
Schedule
May• Define the scope for
– Pilot website 1 - Phase 1 (Housing) – Pilot website 2 - Phase 1 (Web resources) – Pilot website 3 - Phase 1 (UWaterloo main)
• Perform thorough review of CMS requirements
Schedule
June – September• Define Drupal configuration • Develop Pilot website 1 (Housing) - Phase 1
Schedule
September 2010• Develop Pilot website 2 (Web resources) -
Phase 1
Schedule
October 2010• Develop Pilot website 3 (UWaterloo main) -
Phase 1
Schedule
November 2010• Develop Pilot website 3 (UWaterloo main) -
Phase 2
Schedule
December 2010• Develop Pilot website 1 (Housing) - Phase 2
Schedule
January 2010• Develop Pilot website 2 (Web resources) -
Phase 2
Notes
• Web Resources site chosen as pilot b/c site will provide CMS and Design Resources for the project
Notes
• Housing chosen as pilot b/c of staff on the team and b/c well-defined existing website with manageable scope
Notes
• Starting with Housing, then Web Resources and UW Main in Phase 1
• Reversing the order in Phase 2 Pilot because of time pressures to get site out
Notes
• Faculty rollout and other-sites rollout TBD– phased faculty rollout expected;– sometime after January 2011;