WC2 - NovaLocadocs.novaloca.com/22175_633489044272357500.pdf · New fire resistant dry lined walls...
Transcript of WC2 - NovaLocadocs.novaloca.com/22175_633489044272357500.pdf · New fire resistant dry lined walls...
WC2
The view from the top of the career ladder.
It’s not just about the views, although if you were a tourist you could return home happy in the thought that you’d captured a fair chunk of iconic London landmarks. No, Brettenham House has something often missing in more contemporary developments. Character. And in bringing the entrances, receptions and common parts into 2008, we have still retained the grandeur that makes the building unique in this part of Midtown.
They may want you in New York but even if they are going to double your salary, have a good look around Brettenham House before making your decision.
WHEN THIS IS YOUR LONDON OFFICE, THAT NEW YORK POSTING COULD BE SEEN AS A SIDEWAYS MOVE.
CONTENTS
Entrance 2
Reception 4
Toilets 7
Location 8
Schedule of Areas 11
Floorplans 12
Space Planning 18
Specification 22
Professional Team 25
Contacts 27
1
Built 1932.Designed 2008.
32
54
Should you decide to greet visitors in the main reception, you can be assured that they won’t mind hanging around. This split-level area (with disabled access) has been designed to a high standard, the palette of colours and materials create a light and inviting environment.
RECEPTION. WHERE YOUR CLIENTS WON’T MIND WAITING.
You don’t have to be at your desk to think. And because the design ethos of the reception has also been extended into the toilets, you could find you’re as productive here as back at your desktop. Timber and metallic strips set into painted panels make these loos as unusual as the rest of Brettenham House.
SOME DEVELOPMENTS TREAT THE LOOS AS AN AFTERTHOUGHT. WE SEE THEM AS A GREAT PLACE TO THINK.
76
YOU SPEND TWO THIRDS OF YOUR LIFE AT WORK, BUT IT WON’T SEEM LIKE IT HERE.
98
Do something different at lunchtime. Go for a walk along the Embankment. Look up at a large expanse of sky (when did you last do that in London?) Or just look at life on the Thames; it’s a two minute walk from Brettenham House.
In the evening arrange to meet your partner or friends in Covent Garden; it’s a three minute walk from Brettenham House and opera, theatres, restaurants and bars are all there to be enjoyed.
It is said that people in the UK work the longest hours in Europe, all the more reason for your place of work to be somewhere that you can also enjoy when you are not at your desk.
Schedule of Areas
1110
Schedule of Areas
Floor Accomodation Sq M Sq Ft
Sixth Office 870 9,364
Fifth Office 960 10,333
Fourth Office 1,312 14,122
Third Office 1,325 14,262
Second Office 1,325 14,262
Ground Office/Retail 226 2,433
TOTAL 6,018 64,776
GETTING HERE, GETTING AROUND AND GETTING HOME.
RailWaterloo station 10 minutes walk Charing Cross 5 minutes walk
TubeDistrict/Circle line Temple 4 minutes walk Piccadilly line Covent Garden 4 minutes walkBakerloo/Northern line Embankment 5 minutes walkCentral line Holborn 8 minutes walkWaterloo & City/Jubilee line Waterloo 10 minutes walk
BusNumerous bus routes are available on The Strand.
River BoatRiver boat services are available just a short walk away at Festival Pier, Embankment Pier and Savoy Pier.
The following places of interest are all within easy walking distance:
Temple
Embankment
Charing Cross
Waterloo
LeicesterSquare
CoventGarden
Holborn
TottenhamCourt Road
Chancery Lane
Southwark
Savoy Pier
Embankment Pier
Festival Pier
Strand
Waterloo Bridge
Fleet Street
A
ldwych
Victoria Embankment
Vic
toria
Em
bank
men
t
Whitehall
Waterloo Road Stamford Street
Waterloo Road
York
Roa
d
Blackfriars BridgeBlackfriars Road
Pall Mall
Trafalgar Square
Sh
aftesb
ury Aven
ue
Haymarket
Charing Cross Road
Tottenham Court Road
Oxford St New Oxford St
Farringdon Street
Farringdon Road
Kingsway
High Holborn
High Holborn Holborn
Bloomsbury Street
Shaf
tesb
ury
Aven
ue
Bloomsbury W
ay
Strand
Fe
tter L
ane
Shoe Lane
BRETTENHAM HOUSE
HistoryBuckingham PalaceWestminster AbbeyHouses of ParliamentTrafalgar Square
ShoppingOxford StreetCovent Garden
The ArtsNational Gallery Royal Festival HallRoyal National TheatreRoyal Opera House
relaxationSt James’s ParkGreen Park
Entertainment Soho London Eye West End theatresLeicester Square
MuseumsLondon Transport MuseumCabinet War Rooms
key
Net area = 2,433 sq ft
Lifts
WC areas
Fire escape stairs
GROUND LEVEL LEVEL TWO
1312
key
Net area = 14,262 sq ft
Lifts
WC areas
Fire escape stairs
New reception
key
Net area = 14,122 sq ft
Lifts
WC areas
Fire escape stairs
1 6
5
2 2 2 2
4
3
4
3
LEVEL THREE LEVEL FOUR
1514
key
Net area = 14,262 sq ft
Lifts
WC areas
Fire escape stairs
key
Net area = 9,364 sq ft
Lifts
WC areas
Fire escape stairs
key
Net area = 10,333 sq ft
Lifts
WC areas
Fire escape stairs
LEVEL FIVE LEVEL SIX
1716
3
Accomodation Schedule No
Offices 3Open Plan desks 124Meeting Rooms 6Teapoint 1Copy Room 1Comms Room 1Reception 1 (2 people)Total number of people 129Net Area (inc. circulation area) 1333.5 sq m / 14353.67 sq ftDensity 10.33 sq m / 111.26 sq ft
Space Planning – Open Plan Space Planning – Legal
1918
Accomodation Schedule No
Offices 22 (35 desks)Open Plan desks 32Meeting Rooms 8Teapoint 1Copy Area 1Comms Room 1Store Room 1Reception 1Total number of people 68Net Area (inc. circulation area) 1333.5 sq m / 14353.67 sq ftDensity 10.33 sq m / 111.26 sq ft
Space Planning – Corporate Space Planning – Meeting Suite Layout
2120
Accomodation Schedule No
Offices 10Open Plan desks 91Meeting Rooms 6Teapoint 1Copy Room 1Comms Room 1Reception 1 (2 people)Total number of people 103Net Area (inc. circulation area) 1333.5 sq m / 14353.67 sq ftDensity 12.94 sq m / 139.35 sq ft
Accomodation Schedule No
Offices 6Open Plan desks 6Meeting Rooms 16Teapoint 2Copy Room 1Store Room 1Reception 1 (2 people)Total number of people 11Net Area (inc. circulation area) 1333.5 sq m / 14353.67 sq ft
1.0 The Building.
1.1 History.
Brettenham House was designed by W. & E. Hunt and completed in 1932. It is located on Lancaster Place, off the Strand, opposite Somerset House on the North side of Waterloo Bridge. The building comprises Ground (Retail and Office Space) plus 8 upper floors of commercial offices. There are also two tiers of roof plant space, stepped back from the main elevations above.
The Lower Ground floor is occupied by the building Management team, storage areas and additional office space, At basement level there are two levels of car parking (with space for over 40 vehicles) accessed from Savoy street, ample cycle bays can be provided and there are male and female showers on the Lower Ground floor. There are two vertical circulation cores with stairs serving all office floors and two lift cores, known as North and South lobbies.
1.2 Refurbishment.
The proposed refurbishment involves the re-modelling of the entrance, reception, lifts (replacement & enlargement) and common parts; plus the modernising and redecoration of the vacant office areas to incorporate new air conditioning, raised floors, lighting, internal glazing and toilets.
The objective is to provide high quality grade A open plan office accommodation with an equivalent standard of public areas particularly the entrance reception, lifts and toilets.
Areas included within the refurbishment.
Ground Floor Entrances, receptions and part office/retail. Second Floor Common parts and All offices.Third Floor Common parts and All offices.Fourth Floor Common parts and All offices. Fifth Floor Common parts and All offices apart from south wing.Sixth Floor Common parts and All offices apart from North wing. Roof Install roof-mounted plant and acoustic louvers as necessary.
2.0 Offices.
2.1 Occupancy Level.
Escape 1 person per 10 m² (108 ft²)Internal heat gains 1 person per 10 m² (108 ft²)Toilet accommodation 1 person per 10 m² (108 ft²)
The toilets are designed as “unisex superloos” and assumed occupancy rate is on the basis of 50/50 male/female.
Hours of access The development has been designed such that the offices can, if required, be occupied 24/7.
2.2 General Office Floor Dimensions.
Raised floor zone 265mmFloor to ceiling height 2nd floor 3,000mm 3rd-6th floor 2,500mm
Slab to Slab height.
2nd-3rd floor 3,600mm3rd-4th floor 3,060mm4th-5th floor 3,040mm5th-6th floor 3,060mm6th-7th floor 3,080mm
3.0 Internal Finishes.
3.1 Office Areas.
The office floor to comprise a fully accessible raised floor system consisting of 600x600 mm tiles mounted on adjustable pedestals. Skirting throughout all offices and circulation space will be of 150mm high painted MDF.
All walls in plasterboard and columns finished with an emulsion paint finish.
Ceiling will be a plaster board finished with an emulsion finish.
Provision will be made to enable blinds to be installed by the tenant. 3.2 Toilets
The toilet floor will consist of non slip 450x450 mm ceramic floor tiles with 450x150mm matching skirting.
New stud walls with decorative water resistant panels on the outside. This external styling is carried through into the toilet cubicles as feature panels behind the toilet and wash hand basins.
Ceilings will be plasterboard with an emulsion paint finish.
White vitreous china WC suites and all fittings will be in high quality chrome/stainless steel finish.
Special disabled white vitreous china WC suite and wash hand basin will be provided in the disabled toilet complete with high quality chrome/stainless steel finish.
Mirrors will be installed in all WCs.
3.3 Entrance Hall.
The front portion of the floor to the north entrance is being lowered to facilitate level access from the pavement, the entrance is being enlarged and remodeled to create a more spacious and contemporary reception area befitting an office building of some 100,000 sq ft.
The floor will be a limestone tiled finish to include inset matwell to tone in with the flooring.
Ceilings will be plasterboard with an emulsion paint finish.
A bespoke reception desk will be provided in the main north reception area in materials to match the rest of the reception area. A secondary security desk will be provided in the south core reception.
Glass surrounds to North Core entrance door to be back illuminated with low voltage cold cathode lighting.
3.4 Staircases.
Carpeted to include suitable nosings with contrasting inserts.
New fire resistant dry lined walls with an emulsion paint finish.
Ceilings will be plasterboard with an emulsion paint finish.
3.5 Lifts.
There will be 4 new 13 person passenger lifts (2 in each core).
3.6 Tea Kitchens.
Water supply and drainage connections will be provided to both cores on all refurbished office floors.
3.7 Telecommunications.
Space will be provided in office risers for the use of tenants in the distribution of voice and data services throughout the building. The risers will be suitable for Category 6 structured cabling system.
3.8 Secondary glazing.
All existing office windows are to have high quality openable secondary glazing. The new mullions and transoms, where necessary, will align with the external windows. The secondary glazing is to be installed to improve both the acoustic and thermal aspects of the office accommodation. Each window is to be single hinged wherever possible to avoid internal transoms or mullions.
4.0 Mechanical Services.
The building will be heated ventilated and comfort cooled on the principle of an open plan office concept.
4.1 Offices.
Fan coil units will be provided to all floors with space provision for future installation of further units, if required, by the tenant. The units will be located within the raised floor at the perimeter of the building. The units will incorporate individual electric heaters.
4.2 Reception.
Common parts, areas and toilets will be heated using electric radiators and fan coil units.
4.3 Toilets.
The toilets will be mechanically ventilated using individual toilet extract fans located in the ceiling zone.
4.4 General.
Air supply and extract plant will be located at both basement and roof levels. Heat recovery devices will be used to maximise energy efficiency. Air cooled water chillers will be located on the roof and will provide chilled water to all floors and the main mechanical air handling plant.
TechnicalSpecification
2322
Professional Team
2524
5.0 Design Parameters.
5.1 External Design Conditions.
Summer 29°C DB / 20°C WB
Winter -4°C DB
5.2 Internal Design Conditions.
Offices
Summer 26°C DB +/- 2°C DB
Winter 22 °C DB +/- 2°C DB
Toilet Areas, Staircases & Plant Rooms.
Winter 18°C DB min
5.3 Fresh air supply and extract.
Offices 10 l/s / person
Toilet areas Extract rate of 8 AC/HR 5.4 Supplementary heating.
All electric heating.
5.5 Internal heat gains/allowance in cooling system.
Occupancy 1 person /10m2 (90W sensible)
Lighting 15W/m2
Equipment 20 W/m2 small power
5.6 Internal noise criteria.
Offices NR 38-42 depending upon speed selection.
Toilets NR 42
5.7 Gas systems.
A gas meter supply is available within the basement plant room.
5.8 Control systems (BMS).
The control system is an open protocol installation with outstations linked via a LAN network. A central head-end facility may be installed at a future date.
5.9 Hot water supplies.
Individual electric water heaters are supplied within each toilet area.
5.10 Cold water supplies.
A boosted water supply will serve all toilet areas.
5.11 Foul drainage.
The building is connected to gravity discharge connections into the adjacent highway.
6.0 Electrical Services.
An LV sub-main installation will be installed with new bus-bar risers located to the North and South Cores. At each level new distribution boards will be installed within the vacant demises with new sub-main cables being supplied to the existing tenants’ boards.
6.1 Design Criteria.
Landlord common areas Cleaners’ sockets are provided to stairs, common areas and reception.
Office tenant areas Tenant fit-out based upon 20 W/m2
6.2 Lighting levels.
Offices 450 Lux average (on desk)
Toilets 150 Lux average
Corridors 150 Lux average (on floor)
Plant rooms 200 Lux average (on floor)
6.3 Office Lighting.
Exposed ceiling mounted luminaries with wiring to luminaries contained within integral conduit recessed within the plasterboard lining of the ceiling. The luminaries will have PIR control to individual zones.
6.4 Electrical distribution.
The building incorporates electrical supplies to all Landlord areas with distribution board provision at each level for tenant fit-out.
6.5 Small power installation.
Tenant fit-out.
6.6 Lighting installation.
Generally, in accordance with Code LG7 within the tenant’s demise.
6.7 Emergency lighting.
Integral within the general office luminaries and adjacent to exit signage to means of escape and in accordance with BS 5266.
6.8 Fire alarm and Detection system.
In accordance with BS 5839.
6.9 Access control.
Wire ways will be provided to allow individual control on floor by floor basis.
6.10 Security.
A comprehensive security access and CCTV system will operate throughout the building and at all entry/exit points.
Development ManagerDraco Brettenham Limited
ArchitectJM Architects
M&E EngineerHalloran Payne
Cost ConsultantHeasemans
Structural EngineerEvolve
Main ContractorVirtus
Project ManagerPat Gill – Draco
Marketing and DesignSkonka Ltd
AgentsSavillsFarebrother
TechnicalSpecification
2726
Contacts
Julian Hind
020 7855 [email protected]
Charlie Thompson
020 7855 [email protected]
For further information, or to arrange a viewing.
Tracy Collins
020 7499 [email protected] Chris Bond
020 7499 [email protected]
www.brettenhamhouse.com
A development by
www.dracoproperty.com
www.dracoproperty.com
A development by
www.brettenhamhouse.com