WBS 2.4.2 STRAND PROCUREMENT

26
A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) Arup K. Ghosh BNL WBS 2.4.2 WBS 2.4.2 STRAND PROCUREMENT STRAND PROCUREMENT

description

WBS 2.4.2 STRAND PROCUREMENT. Arup K. Ghosh BNL. Outline. Present status of strand procurement Future strand for LARP Smaller Filament D eff PIT strand Tolerance of RRP conductors to cabling degradation Filament Spacing Rolled strand Revisit strand specification. - PowerPoint PPT Presentation

Transcript of WBS 2.4.2 STRAND PROCUREMENT

Page 1: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006)

Arup K. GhoshBNL

WBS 2.4.2 WBS 2.4.2 STRAND PROCUREMENTSTRAND PROCUREMENT

Page 2: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 2

OutlineOutline

•Present status of strand procurement

•Future strand for LARP

– Smaller Filament Deff

– PIT strand

•Tolerance of RRP conductors to cabling degradation– Filament Spacing– Rolled strand– Revisit strand specification

Page 3: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 3

Procurement PlanProcurement PlanNov-05Nov-05

LARP1100 kg

FY06300 kg

FY07400 kg

FY08400 kg

85 kgFNAL

54/61- 90 kg3/31/06

54/61- 60 kg6/30/06

54/61- 60 kg10/31/06

CDP FY06

54/61-60 kg3/31/06

84/91-35 kg7/30/06

108/127- 35 kg7/30/06

Page 4: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 4

NbNb33Sn Strand SpecificationSn Strand SpecificationRRP-54/61RRP-54/61

Spec. No.: LARP-MAG-M-8001-RevB

Page 5: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 5

Procurement StatusProcurement Status3-30-063-30-06

LARP1100 kg

FY06300 kg

FY07400 kg

FY08400 kg

30 kgTBD

54/61- 90 kg3/31/06

54/61- 90 kg9/30/06

54/61- 90 kg10/25/06

CDP FY06

54/61-30 kg5/30/06

54/61- 60 kg7/30/06

Page 6: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 6

Strand Purchase and Inventory as of 4-Strand Purchase and Inventory as of 4-20-0620-06

Order Date Ship DateAdjusted Ship Date

Quantity Completed PO Program Billets

4/1/2006 at LBNL 30 CDP 82202/28/2005 11/30/2005 at LBNL 70 6720228 CDP 8647, 86488/29/2005 3/31/2006 5/15/2006 30 21 6802116 CDP 8817

" " 7/15/2006 60 "190 CDP

11/7/2005 7/2/2006 3/30/2006 90 37.4 6803608 LARP 878116.1 881736.5 8857

1/20/2006 9/6/2006 9/6/2006 90 6804489 LARP2/23/2006 11/30/2006 10/25/2006 90 6805346 LARP

TBD TBD 30 TBD LARP300 LARP

Page 7: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 7

RRP 54/61 –Piece LengthRRP 54/61 –Piece Length

0

1000

2000

3000

4000

5000

6000

7000

8000

1 2 3 4 5 6 7 8 9

No. of Pieces

Pie

ce L

engt

h, m

8220

8647

8648

8781

8817

8857

8879

•250 kg of wire produced for LARP and CDP in the last 12 months, single billet yield is ~ 35kg

•93 % in lengths >1Km, 57% in lengths >3 km

•With the following HT 665C/50 hrs

•Average Jc(12T)=2880 A/mm2

•Average RRR= 189

Page 8: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 8

Procurement Plan For FY07 Procurement Plan For FY07 3-30-063-30-06

LARP1100 kg

FY06300 kg

FY07400 kg

FY08400 kg

30 kgTBD

RRP 54/61270 kg

130 kg

Page 9: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 9

Projected InventoryProjected Inventory

CDP LARP MagnetStrand Req.

Inventory of strand

Oct-05 33 SR01 7 26Nov-05 70 96Dec-05 96Jan-06 96Feb-06 96Mar-06 90 TQC02 40 146Apr-06 LR01 27 119

May-06 30 LR01, TQC02-R 89 60Jun-06 TQS02 40 20Jul-06 60 80

Aug-06 80Sep-06 90 170Oct-06 170Nov-06 90 SRS02, LR02 88 172Dec-06 PCX01 40 132Jan-07 132Feb-07 90 LQX01 165 57Mar-07 57Apr-07 57

May-07 57Jun-07 90 147Jul-07 147

Aug-07 147Sep-07 90 237

0

50

100

150

200

250

Oct-05

Jan-06

Apr-06

Jul-06

Oct-06

Jan-07

Apr-07

Jul-07

Kg

54/61 wire

Page 10: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 10

Towards a more “flux-jump” stable Towards a more “flux-jump” stable conductorconductor

• Why ?– Intrinsic (Adiabatic) stability of wire– Field quality in magnets

• Reduce Effective Filament Diameter Deff

– Deff < 30 m (adiabatic limit not established experimentally for high Jc wire )

• For Deff > 35 m, maintain high RRR after reaction prevent Sn-leakage

• OST-RRP- 91 and 127 sun-element billet design – Cabling Effects

• Shearing of sub-elements RRR degradation

• SMI-PIT- 288– 50 m at 1.25 mm wire– 32 m at 0.8 mm wire

Page 11: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 11

Decreasing the sub-element sizeDecreasing the sub-element size

• Pack increasing number of sub-elements into Re-stack– Increasing number of bundles packing more difficult– More cold work increases the hardness of non-Sn parts– Additional Cu-Cu surfaces worse bonding yield ?

Page 12: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 12

91-127-217 series made with Nb-Ta for 91-127-217 series made with Nb-Ta for CDP R&DCDP R&D

• High Jc design (3000 A/mm2):

• Objective was to only vary the sub-element size– same sub element billet for all restacks– all restacks ~53% non-Cu, 0.7 mm strand

• Significant wire breakage for all, 217-stack the worst– For a reaction at 665 C/50hrs

(Jc, RRR)

• 91-stack 2920, 134

• 127-stack 2720, 110

• 217-stack 2660, 7 (Many broken barriers)

Suggests there is some size effect controlling the maximum Jc

Page 13: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 13

Future RRP StrandFuture RRP Strand

• Is OST ready to produce 91 and 127 sub-element billets ?“Further to our discussions today about 61 127 stack

designs for LARP, this year we are producing 91-stack material for the EFDA dipole. The sub-element design is for lower Jc and uses Nb-Ti (Jc ~2400 @ 12 T), but the work will give us some yield data on our way to 127 stacks.”

Based on CDP R&D billet 8079 (90/91) and FNAL billet 8195 (108/127) both of which uses the same sub-elements of Nb/Nb-47Ti

Page 14: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 14

Page 15: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 15

EFDA Dipole Project

Due datesDelivery One (30 kg strand): delivered Delivery Two (120 kg strand): 9 months Delivery Three (280 kg strand): 15 months

E. Salpietro

Strand based on 90/91-stack design using Nb/ Nb-47Ti rods

Page 16: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 16

Future RRP StrandFuture RRP Strand

• Is OST ready to produce 91 and 127 sub-element billets ?

• At present the lower Jc ( > 2000 A/mm2) 91-design billet is moving into production EFDA Order of 400 kg

• Under CDP R&D this year, a high Jc 108/127 billet is being processed (Nov-06)

• FNAL has OST fabricating a R&D billet using 120/127 design (Dec-06)

Page 17: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 17

Powder-in-Tube (NbTa)Powder-in-Tube (NbTa)33Sn (PIT)Sn (PIT)Shape Metal Innovation (SMI)Shape Metal Innovation (SMI)

J. Lindenhovious

B179

Page 18: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 18

PIT -StrandPIT -Strand

• NED is pushing SMI-VAC to develop strand.

• Latest billet B207 is 288 filament, similar to B179– Strand Diameter 1.25 mm– Cu/Non-Cu= 0.96– Jc > 2400 A/mm2 At 12 T

B179 B 207

Luc Oberli (CERN) WAMDO-06

Page 19: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 19

SMI – 288 filamentSMI – 288 filament

Jc = 2077 A/mm2 at 12 T

Jc = 1118 A/mm2 at 15 T

HT = 84 hours at 675 0C

Jc non Cu lower than B179

by ~ 10 - 15 % due to powder preparation which underwent by mistake an additional HT.

• Stability measurements performed by LASA : Field rate ~ 15 mT/sAt 1591 A, no quench in the field range : 0 - 5 T

0

500

1000

1500

2000

2500

3000

3500

8 10 12 14 16 18 20

PIT-B207

Jc n

on-C

u [A

/mm

2]

Applied magnetic field [T]

LASA-Milan 4.24 K

UNI-Geneva 4.2 K

Luc Oberli (CERN)

WAMDO-06

Page 20: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 20

SMI-PIT B-207 SMI-PIT B-207

0

200

400

600

800

1000

1200

1400

1600

0.0 2.0 4.0 6.0 8.0 10.0 12.0H (T)

Ic (

A)

Ic

Iq

PS. LIMIT

Wire drawn to 0.8 mm

Jc(12T) : 2145 A/mm2 , Js > 4500 A/mm2 (Is >1200A)

Filament size : 32 m (No flux-jump observed in magnetization)

Page 21: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 21

Cabling DegradationCabling Degradation

• Strand Deformation at the cable edges– Filament

Distortion

• Simulate by rolling strands– E. Barzi (FNAL)– Filament

Merging

• Microscopy, Ic and Is measurements

Page 22: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 22

Rolled StrandsRolled Strands

Def=14% Def=28%

RRP 54/61

Page 23: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 23

SMI : Strand deformation by rollingSMI : Strand deformation by rolling

B 201B 179

Deformation of 25 %, i.e. d0 - t = 0.25 mm.

“Distribution of Cu within the strand important in order the strand can sustain heavy mechanical deformation as in cabling.”

Luc Oberli (CERN) WAMDO-06

Page 24: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 24

SMI – Deformation by rolling on SMI – Deformation by rolling on B207B207

Ic Degradation of 15 – 17 % on samples with a deformation level of 28%RRR value dropped to 80 indicating Sn diffusion in the Cu matrix

Def = 28 %

Def = 28 %

after 84 h at 675 0C

With HT

2.8 at. % Sn

No HT

Luc Oberli (CERN) WAMDO-06

Page 25: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 25

Re-visit Strand SpecificationRe-visit Strand Specification

Process Ternary RRP Nb3SnRe-Stack Design 54/61Strand Diameter, mm 0.7 ± .003

Jc(12 T) at 4.2 K, A/mm2 ≥ 2400Deff, µm (based on billet design) < 70Inter-Sub-element spacing, m 5IS, A > 1000 ACu-fraction, % 47 ± 2RRR (after full reaction) ≥ 100Twist Pitch, mm 14 ± 2Twist Direction right-hand screwMinimum Piece length, m 350High temperature HT duration, h ≥ 48

Page 26: WBS 2.4.2  STRAND PROCUREMENT

A. Ghosh (LARP Collaboration Meeting, LBNL April-26,28-2006) 26

SummarySummary

• There is sufficient RRP 54/61 strand for the magnets in the near term

• 91-filament is moving into production

• 127 filament can be in production within 12 months.

• PIT strand with 288 filaments is “flux-jump” stable at 0.8 mm wire diameter with Jc ~ 2100 A/mm2 at 12 T

• Cabling Degradation from filament shearing– Optimization of cabling parameters– Optimization of strand design

• Increase filament spacing ? (FNAL has already ordered a 60/61 billet with larger Cu-spacing, evaluation in progress)