WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public...
Transcript of WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public...
![Page 1: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/1.jpg)
WB&A Trail Bridge at WB&A Trail Bridge at WB&A Trail Bridge at WB&A Trail Bridge at Patuxent RiverPatuxent RiverPatuxent RiverPatuxent River
Public Input Meeting
March 28, 2017
6:00 - 8:00 p.m.
Two Rivers Community Center1425 Two Rivers Boulevard, Odenton, MD
![Page 2: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/2.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Introduction
• Anne Arundel County
DRP – Rick Anthony, Director
DPW – Joan Viennas
DRP – Dawn Thomas
• Prince George’s County
M-NCPPC – Robert Patten
• Design Consultant
WBCM – Randy Hughes
AKRF – Mark Sutherland
![Page 3: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/3.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Meeting Agenda
• Project Overview
• Project Process
• Feasibility – Alternatives Assessment
• Next Steps
• Questions / Comments
![Page 4: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/4.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Project Overview
• Connecting Anne Arundel and Prince George's Counties
• Bicycle & pedestrian shared-use bridge over the Patuxent River.
• Project is a partnership between Anne Arundel County & Prince George’s County.
• Partial funding with Maryland Bikeways grant (MDOT/SHA)
![Page 5: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/5.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Project Overview
• Intercounty Link
• Baltimore-Washington Link
• Supports the Anacostia Trails Heritage Area
• East Coast Greenway and American Discovery Trail
• Supports WB&A Trail
• Bowie Heritage Trail
• Revitalize BSU Area Nature Trails
• Bowie State University Activity Hub
![Page 6: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/6.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Project ProcessMulti-phase design process
Current:
• 1a: Feasibility – Alternatives Assessment
• 1b: Schematic Design – 30%
Future:
• 2: Design Development – 65%
• 3: Construction Documents – 95%
• 4: Bid Documents – 100%
• 5: Construction
![Page 7: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/7.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Feasibility – Alternatives Assessment
• Environmental Analysis
• Field Assessments
• National Environmental Policy Act (NEPA)
• Site Evaluation
• Three Alternatives for Assessment
• Comparison of Impacts
• Public Input
• Summary & Report with
Recommendations
![Page 8: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/8.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Environmental Analysis
• Field Analysis
• Site investigations conducted to establish crossing location alternatives for further consideration.
• NEPA Process
• Review of potential environmental impacts
• Floodplain, cultural, social, waterways, wetlands & floodplains, historic resources
• Insure conformance with overlapping studies and programs
• Review through SHA/FHWA
![Page 9: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/9.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Site Evaluation
Three Alternatives for Assessment
• Feasibility and Preliminary Location Alignment
• Types of Impacts
• Environmental Impacts (temporary & permanent)
• Constructability Challenges
• Construction Cost
• Permitting / Regulatory Requirements
• Easement Needs
Existing Trail
Existing Trail
Anne Arundel Co
Prince
George’s Co
Project Evaluation Area
![Page 10: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/10.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
• Alternative #1: No-Build
• Alternative #2: Northern
• Alternative #3: Southern
Three Alternatives
Anne Arundel Co
Prince
George’s
Co
Alternative #3
Alternative #2
Existing Trail
Existing Trail
![Page 11: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/11.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Alternative #1: No-Build
• Required alternative under NEPA documentation
• Pros
• No impacts to environmental resources
• Cons
• Does not achieve overall project goals of trail connection between the counties.
![Page 12: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/12.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Alternative #2: Northern
• Preliminary Bridge Span
• Preliminary Trail Length
• Pros
• Most direct route
• Minimizes construction impact
• Minimizes floodplain impact
• Minimizes forest impact
• Minimizes wetlands impact
• Cons
• Steep approaches
• Existing ponding areas
Existing Trail
Existing Trail
Anne Arundel Co
Prince
George’s Co
Bridge crossing
Steep approach
Wetlands impact
![Page 13: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/13.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Alternative #3: Southern
• Preliminary Bridge Span
• Preliminary Trail Length
• Pros
• Utilizes previously cleared area
• Steep approach segments limited
• Cons
• Longer new trail required
• Greater floodplain impact
• Greater forest clearing
• More new impervious / SWM requirements
• Easement required
Existing Trail
Existing TrailP
atu
xen
t Riv
er
Anne Arundel Co
Prince
George’s Co Bridge crossing
Existing
cleared
ridge line
![Page 14: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/14.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
• Alternative #1: No-Build
• No trail connection
• Alternative #2: Northern
• Minimizes environmental impacts
• Alternative #3: Southern
• Approx 4x longer trail
• Utilizes existing terrain & cleared area
• Greater cumulative impacts
Summary
Anne Arundel Co
Prince
George’s
Co
Alternative #3
Alternative #2
Existing Trail
Existing Trail
![Page 15: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/15.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Next Steps
• Finalize the Phase 1a: Feasibility – Alternatives Assessment
• Assemble & evaluate comments from tonight’s meeting
• Prepare interim draft report for review
• Final Report & supporting documents
• Anne Arundel County & Prince George’s County Review
• Begin Phase 1b: Schematic Design – 30%
• Detailed design based upon selected alternative
![Page 16: WB&A Trail Bridge at Patuxent RiverMar 28, 2017 · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers](https://reader034.fdocuments.in/reader034/viewer/2022043010/5fa1dfb37f4a7b27945105a6/html5/thumbnails/16.jpg)
ANNE ARUNDEL COUNTY
Department of Public Works
Questions / Comments
Deadline for Comments = April 17, 2017
Website:
http://www.aacounty.org/news-and-events/events/event/03/28/2017/proposed-bridge-over-the-patuxent-river-public-meeting
Comment Card (at tonight’s meeting)