Page 1: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

WB&A Trail Bridge at WB&A Trail Bridge at WB&A Trail Bridge at WB&A Trail Bridge at Patuxent RiverPatuxent RiverPatuxent RiverPatuxent River

Public Input Meeting

March 28, 2017

6:00 - 8:00 p.m.

Two Rivers Community Center1425 Two Rivers Boulevard, Odenton, MD

Page 2: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Introduction

• Anne Arundel County

DRP – Rick Anthony, Director

DPW – Joan Viennas

DRP – Dawn Thomas

• Prince George’s County

M-NCPPC – Robert Patten

• Design Consultant

WBCM – Randy Hughes

AKRF – Mark Sutherland

Page 3: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Meeting Agenda

• Project Overview

• Project Process

• Feasibility – Alternatives Assessment

• Next Steps

• Questions / Comments

Page 4: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Project Overview

• Connecting Anne Arundel and Prince George's Counties

• Bicycle & pedestrian shared-use bridge over the Patuxent River.

• Project is a partnership between Anne Arundel County & Prince George’s County.

• Partial funding with Maryland Bikeways grant (MDOT/SHA)

Page 5: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Project Overview

• Intercounty Link

• Baltimore-Washington Link

• Supports the Anacostia Trails Heritage Area

• East Coast Greenway and American Discovery Trail

• Supports WB&A Trail

• Bowie Heritage Trail

• Revitalize BSU Area Nature Trails

• Bowie State University Activity Hub

Page 6: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Project ProcessMulti-phase design process

Current:

• 1a: Feasibility – Alternatives Assessment

• 1b: Schematic Design – 30%

Future:

• 2: Design Development – 65%

• 3: Construction Documents – 95%

• 4: Bid Documents – 100%

• 5: Construction

Page 7: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Feasibility – Alternatives Assessment

• Environmental Analysis

• Field Assessments

• National Environmental Policy Act (NEPA)

• Site Evaluation

• Three Alternatives for Assessment

• Comparison of Impacts

• Public Input

• Summary & Report with

Recommendations

Page 8: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Environmental Analysis

• Field Analysis

• Site investigations conducted to establish crossing location alternatives for further consideration.

• NEPA Process

• Review of potential environmental impacts

• Floodplain, cultural, social, waterways, wetlands & floodplains, historic resources

• Insure conformance with overlapping studies and programs

• Review through SHA/FHWA

Page 9: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Site Evaluation

Three Alternatives for Assessment

• Feasibility and Preliminary Location Alignment

• Types of Impacts

• Environmental Impacts (temporary & permanent)

• Constructability Challenges

• Construction Cost

• Permitting / Regulatory Requirements

• Easement Needs

Existing Trail

Existing Trail

Anne Arundel Co

Prince

George’s Co

Project Evaluation Area

Page 10: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

• Alternative #1: No-Build

• Alternative #2: Northern

• Alternative #3: Southern

Three Alternatives

Anne Arundel Co

Prince

George’s

Co

Alternative #3

Alternative #2

Existing Trail

Existing Trail

Page 11: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Alternative #1: No-Build

• Required alternative under NEPA documentation

• Pros

• No impacts to environmental resources

• Cons

• Does not achieve overall project goals of trail connection between the counties.

Page 12: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Alternative #2: Northern

• Preliminary Bridge Span

• Preliminary Trail Length

• Pros

• Most direct route

• Minimizes construction impact

• Minimizes floodplain impact

• Minimizes forest impact

• Minimizes wetlands impact

• Cons

• Steep approaches

• Existing ponding areas

Existing Trail

Existing Trail

Anne Arundel Co

Prince

George’s Co

Bridge crossing

Steep approach

Wetlands impact

Page 13: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Alternative #3: Southern

• Preliminary Bridge Span

• Preliminary Trail Length

• Pros

• Utilizes previously cleared area

• Steep approach segments limited

• Cons

• Longer new trail required

• Greater floodplain impact

• Greater forest clearing

• More new impervious / SWM requirements

• Easement required

Existing Trail

Existing TrailP

atu

xen

t Riv

er

Anne Arundel Co

Prince

George’s Co Bridge crossing

Existing

cleared

ridge line

Page 14: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

• Alternative #1: No-Build

• No trail connection

• Alternative #2: Northern

• Minimizes environmental impacts

• Alternative #3: Southern

• Approx 4x longer trail

• Utilizes existing terrain & cleared area

• Greater cumulative impacts

Summary

Anne Arundel Co

Prince

George’s

Co

Alternative #3

Alternative #2

Existing Trail

Existing Trail

Page 15: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Next Steps

• Finalize the Phase 1a: Feasibility – Alternatives Assessment

• Assemble & evaluate comments from tonight’s meeting

• Prepare interim draft report for review

• Final Report & supporting documents

• Anne Arundel County & Prince George’s County Review

• Begin Phase 1b: Schematic Design – 30%

• Detailed design based upon selected alternative

Page 16: WB&A Trail Bridge at Patuxent RiverMar 28, 2017  · WB&A Trail Bridge at Patuxent River Public Input Meeting March 28, 2017 6:00 -8:00 p.m. Two Rivers Community Center 1425 Two Rivers

ANNE ARUNDEL COUNTY

Department of Public Works

Questions / Comments

Deadline for Comments = April 17, 2017

Website:

http://www.aacounty.org/news-and-events/events/event/03/28/2017/proposed-bridge-over-the-patuxent-river-public-meeting

Comment Card (at tonight’s meeting)