Complete Pipe System Solutions
WAVISTRONG
ASSEMBLY INSTRUCTIONS
CONICAL-CYLINDRICAL (CB-CS) ADHESIVE BONDED JOINT
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 2/22
WAVISTRONGAssemblyInstructions
WAVISTRONG
ASSEMBLY INSTRUCTIONS
CONICAL-CYLINDRICAL (CB-CS) ADHESIVE BONDED JOINT
Date issued : February 1, 2012
Replaces : REP 419/ Rev 00-0101
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 3/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
Terms o use
All inormation was correct at the time o going to press. However, we reserve the right to alter, amend and update anyproducts, systems and services described in this brochure.
We accept no responsibility or the interpretation o statements made.
© Copyright by Future Pipe Industries.
This document contains condential and proprietary inormation. Reproduction or disclosure o any part o this document is
only allowed with written authorisation by Future Pipe Industries.
All rights are vested at Future Pipe Industries.
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 4/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
Table o contents
Section Page
1 General ................................................................................................................................................... 4
2 Reerences ............................................................................................................................................... 4
3 Quality .................................................................................................................................................... 4
4 Inspection ................................................................................................................................................ 4
5 Requirements or bonding surace and ambient conditions ............................................................................. 5
5.1 Cleaning o a plain pipe end or an unprepared bell end ......................................................................... 55.2 Unprepared and prepared surace ........................................................................................................ 5
5.3 Ambient conditions and conditioning o bonding suraces ........................................................................ 5
5.4 Cleaning o a machined spigot end or a sanded bell end ........................................................................ 6
5.5 Sanding o spigot- and bell end ............................................................................................................ 6
6 Dimensioning o cylindrical spigot end ......................................................................................................... 7
6.1 Cutting o pipe ................................................................................................................................... 7
6.2 Shaving o pipe end ............................................................................................................................ 8
7 Preparing or bonding ............................................................................................................................... 9
7.1 Sanding and conditioning o both bonding suraces ................................................................................ 9
7.2 Dry t and marking ............................................................................................................................. 97.3 Installation o pulling equipment ............................................................................................................ 9
8 Bonding ................................................................................................................................................. 10
8.1 Preparation o adhesive ..................................................................................................................... 10
8.2 Application o adhesive ..................................................................................................................... 10
8.3 Assembly o the spigot in the bell ........................................................................................................ 11
8.4 Curing o the adhesive ...................................................................................................................... 12
9 Materials, tools and consumables .............................................................................................................. 13
9.1 Materials ......................................................................................................................................... 13
9.2 Tools ............................................................................................................................................... 139.3 Consumables .................................................................................................................................... 13
10 Health and saety .................................................................................................................................... 14
Annex A Schemes assembly process Conical-Cylindrical bonded joint ..................................................................... 15
Annex A1 Scheme o spigot dimensioning process ..................................................................................... 15
Annex A2 Scheme o adhesive bonding process ........................................................................................ 16
Annex B Minimum cut length ............................................................................................................................. 17
Annex C Dimensions Cylindrical Spigot ............................................................................................................... 18
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 5/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 4
1 General
This document describes the method to assemble Conical-Cylindrical adhesive bonded joints.To ensure that the perormance o the installed joint complies with the requirements used or the design, it is essential that
all personnel involved in the bonding procedure is amiliar with and ully understands the techniques described in this
document.
The instructions in this document are as complete as possible. However, it is not possible to describe all circumstances that
might be encountered in the eld. Thereore, our experienced supervisors may deviate rom the described method in order
to achieve an optimum solution using the latest bonding techniques and processing methods.
Besides, our supervisors may be consulted or clarication o statements made in this document and or advice about
specic problems encountered in the eld.
Annex A shows schemes o the complete assembly process; Annex A1 shows the spigot dimensioning process and Annex
A2 shows the adhesive bonding process.
Denition o words used in these instructions:
- The word “shall” indicates a requirement
- The word “should” indicates a recommendation.
2 Reerences
These instructions are completed with the ollowing reerenced documents:
•WavistrongEasy-FitAdhesiveInstructions
•WavistrongCylindricalSpigotShaverInstructions
3 Quality
It is advised that the bonder possesses a valid Jointer/Bonder Qualication Certicate, issued by the pipe manuacturer or
a Qualied Certier.
Ater preparation o spigot- and bell end, the actual bonding and nishing o the adhesive joint shall be perormed
continuously and without any interruption or delay.
4 Inspection
All pipes, ttings or components used in the pipeline/piping system shall be inspected or damages, prior to the actual
bonding activity. Rejected items shall be separated and quarantined rom undamaged materials to avoid unintentional use.
Adhesive kits shall be inspected prior to use. Do not use adhesive kits or containers showing evidence o damage or
leakage.
The adhesive shall be used beore the expiry date, which is shown on the adhesive kit.
Make sure that storage o adhesive kits complies with the storage requirements.
Ensure all necessary tools and materials are available. Take notice o the saety precautions stated in this document and
those in the reerenced instructions.
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 6/22
WAVISTRONGAssemblyInstructions
5 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
5 Requirements or bonding surace and ambient conditions
This section gives descriptions o specic conditions o the pipe suraces meant or adhesive bonding, as well as methods toobtain the required condition o the bonding suraces.
5.1 Cleaning o a plain pipe end or an unprepared bell end
Both, the outer surace o a plain cut (not machined) pipe end and the inner
surace o an unprepared (see section 5.2) bell must be clean and dry beore
starting any operation.
I these unprepared suraces o product ends have been in contact with oil or
grease, they must be cleaned using a clean cloth, which is soaked in clean
acetone, M.E.K. (Methyl Ethyl Ketone) or M.I.B.K. (Methyl Iso Butyl Ketone).Dry the cleaned surace with a clean, dry and non-fuy cloth.
I there are no traces o oil or grease contamination on these pipe ends, clean
the suraces using a clean, dry and non-fuy cloth (see g. 5.1.a).
5.2 Unprepared and prepared surace
An unprepared surace is a surace on the inside o a bell or on the outside o a pipe end, where the original resin rich
coating is still intact as it was ater completion o the manuacturing process. Not any manual or mechanical abrasion
process, such as sanding or sand blasting, has ever reduced the original thickness o these resin rich layers.
A prepared surace is a surace on the inside o a bell or on the outside o a pipe end that has been abraded manually or
mechanically. By the abrasion process, the reinorcement o the composite may come in direct contact with the environmentand thereore this surace is sensitive or contamination.
5.3 Ambient conditions and conditioning o bonding suraces
I the bonding suraces are visibly wet, these suraces must be dried and heated.
I the temperature o the bonding suraces is less than dew point plus 3 0C, these suraces must be heated in order to avoid
condensate on the bonding surace.
I the relative humidity o the environment is > 95 %, i it is oggy, or i there is any orm o precipitation (e.g. rain, snow,
hail), precautionary measures must be taken to create an environment where the bonding process can be perormed under
conditioned circumstances (e.g. a shelter).Drying o wet suraces is perormed using a clean, dry and non-fuy cloth and is ollowed by heating o the bonding
areas.
Heating o suraces that are wet or below dew point plus 3 0C is perormed with a heating source such as a hot air blower
or a heating blanket.
The humidity o a (sheltered) bonding environment is reduced with e.g. a hot air blower.
Raise the temperature o the bonding suraces during the heating process up to maximum 80 0C, or set the temperature o
the heating blanket at maximum 80 0C.
I the environment heats the bonding surace above 40 0C, protect it rom direct radiation by sunlight.
The temperature o the bonding suraces o spigot- and bell end during the bonding procedure should be kept between
15 0C and 40 0C, but also at least 3 0C above dew point.
Precautionary measures shall be taken to guarantee the compliance with the required humidity and temperature conditions
during the complete bonding procedure.
Fig. 5.1.a
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 7/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 6
5.4 Cleaning o a machined spigot end or a sanded bell end
A machined, prepared or sanded bonding surace that has been in contact with oil or grease shall not be used and mustbe cut.
Machined, prepared or sanded bonding suraces that are contaminated by other means than oil or grease can be cleaned
by sanding (see section 5.5).
In case o doubt about the nature o the contamination cut the concerned spigot- or bell end.
I there are no traces o contamination on these pipe ends, clean the suraces using a clean, dry and non-fuy cloth.
Do not touch the cleaned surace, nor allow it to be contaminated.
5.5 Sanding o spigot- and bell end
The sanding operation o the bonding suraces o both, spigot- and bell end,shall be perormed within 2 hours rom the actual bonding.
Bonding suraces must be clean and dry at the start o the sanding operation
(see sections 5.1, 5.3 and 5.4).
Sanding o unprepared bell ends is perormed mechanically, using an emery
cup with a grid o grade P40 to P60 (see g. 5.5.a).
Sanding o actory and/or eld prepared spigot- and bell ends is perormed
mechanically using an emery cup, a fapper wheel or emery cloth with a grid
o grade P40 to P60.
A correctly sanded surace does not change in colour when continuing sanding
(see g. 5.5.b).
Bonding suraces must be sanded equally in circumerential direction.
The bonding surace must stay smooth by applying an even pressure on the
sanding equipment.
Do not orget to sand the pipe stop shoulder in the bell end, nor the head o the
bell end.
Break sharp edges o the tip o the machined spigot end.
The bonding surace is cleaned using a dry and clean dust bristle
(see g. 5.5.c).
Sanded suraces must have a dull, resh nish, not a polished look.
Do not touch the cleaned surace, nor allow it to be contaminated.
Fig. 5.5.a
Fig. 5.5.b
Fig. 5.5.c
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 8/22
WAVISTRONGAssemblyInstructions
7 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
6 Dimensioning o cylindrical spigot end
In case a pipe with the correct length and (actory) shaved spigot end is available, then continue with section 7 o theseinstructions.
This section 6 is relevant in case the pipe length has to be adjusted or a spigot end has to be shaved.
Make sure to comply with the relevant requirements stated in section 5 beore starting a next step in the activities to
complete the bonding procedure.
6.1 Cutting o pipe
a Contaminated pipe suraces must be cleaned prior to perorm any operation on the pipe
(see relevant requirements stated in section 5).
b Ensure that the pipe is adequately supported or clamped on a pipe vice.
Use rubber padding having a minimum thickness o 2 mm or similar to protect the pipe rom damage.
c Determine the required length rom the product drawing or
by measurement (see g. 6.1.c).
d Scribe the pipe at the required length, using a pipe tters’ wrap-around
(see g. 6.1.d); take notice o the minimum cut length (see Annex B).
e Cut the pipe square using a diamond coated or carbide hacksaw or an
abrasive wheel.
Ensure that the squareness o the cut end remains within required
tolerance (A) (see g. 6.1. and table 6.1.).
Table 6.1. Tolerance cut end
ID (mm) A (mm)
25 - 400 ± 3
Fig. 6.1.c
Fig. 6.1.d
Fig. 6.1.
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 9/22
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 10/22
WAVISTRONGAssemblyInstructions
9 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
7 Preparing or bonding
Beore any actual bonding activity can start, the spigot- and bell end to be jointed shall be prepared as described below.Especially in the small diameter range, more joints may have to be prepared, as more joints can be made with one
adhesive kit; in some cases it may be advantageous to assemble more joints at the same time (see section 2).
7.1 Sanding and conditioning o both bonding suraces
Make sure to comply with the relevant requirements stated in section 5.
Note 1
The maximum number of sanding operations for each of the bonding surfaces, either the spigot- or the bell end, is two.
In case the spigot is re-sanded the relevant spigot dimensions shall be checked by measuring.For dimensional requirements see Annex C, table C.
Determine the spigot diameter S1.
The wall thickness of the spigot (T) is measured at a number (>= 6) of positions at the end of the spigot, equally spaced in
the circumference.
In case the number of sanding operations of the bonding surfaces is more than two, or the spigot dimensions are not in
compliance with the requirements, the product shall not be used or the spigot end shall be cut.
7.2 Dry ft and marking
In order to be able to check the required nal position o the spigot relative to
the bell, the joint o a pipe and a tting is marked with an alignment mark.
Scribe a line, parallel to the axis o the product on the outer surace o the bell,
continuing on the outer surace o the pipe containing the shaved spigot end
(see g. 7.2).
7.3 Installation o pulling equipment
a I possible, the conical-cylindrical adhesive bonded joint is assembled without the use o mechanical pulling
equipment. However, starting rom ID 200 mm it is allowed to mount the spigot in the bell using pulling equipment.
b The pulling equipment is installed at both sides o the joint; normally two winches will suce.
The position o the winches is equally spaced over the circumerence o the parts to be jointed in order to realise
centric entrance o the spigot in the bell.
Make sure that there will be sucient space to apply adhesive on the bonding suraces.
c Respect the required alignment o the parts to be jointed as well as the support during the bonding operation.
Fig. 7.2
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 11/22
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 12/22
WAVISTRONGAssemblyInstructions
11 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
8.3 Assembly o the spigot in the bell
a Parts to be jointed shall be aligned as true as possible.Any visual misalignment is unacceptable.
b Insert the spigot in the bell and push it home while rotating slowly one
quarter o a rotation, i possible.
Pay attention to the alignment mark on the outer surace with regard to
the orientation o the parts to be jointed.
c When using pulling equipment or joints ID > 200 mm, the winches are
hooked, each winch is equally loaded and the sections to be bonded
are pulled together with a smooth movement.
d Make sure that the spigot is inserted centrically into the bell until the
entrance o the spigot is stopped by the shoulder in the bell.
Note 2
Continuation of activities on the pipeline/piping system may never result in
displacement of the position of the spigot relative to the bell in whatever
direction or orientation.
e Remove the excessive adhesive rom the outer surace
(see g. 8.3.d1) and i possible rom the inside o the joint.
The llet on the head o the bell should be smoothly rounded; the inside
might be cleaned with a plug (see g. 8.3.d2).
Fig. 8.3.d1
Fig. 8.3.d2
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 13/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 12
8.4 Curing o the adhesive
a Until completion o the cure o the adhesive the joint shall not be moved, vibrated or otherwise disturbed.
b Wrap the required size and voltage heating blanket around the joint,
ensuring ull coverage o the bond area and keeping the power supply
cable ree rom the blanket.
Tie the heating blanket down using e.g. a string or steel wire and
assuring an optimal surace contact with the bell (see g. 8.4.b).
c Overlapping ends o oversized blankets risk to be over-heated.
Insulate overlapping ends and position the overlap outside the
insulation.
d Insulate the heating blanket with suitable insulating material
(by preerence a re blanket or equivalent). Close at least one open end
o the jointed pipe line sections in order to avoid cooling down by
draught.
Insulating material should overlap the sides o the blanket with at least
100 mm and should match the pipe (see g. 8.4.d).
e Apply electric power to the heating blanket.
I applicable, adjust the temperature o the blanket such that the surace
temperature o the jointed parts complies with the requirements stated in
the relevant adhesive instructions (see section 2).
Check the unctioning o the heating blanket, at least at the start and atthe end o the curing process, by measuring the surace temperature o the bell using a (digital) thermometer.
The curing time starts when the required surace temperature o the jointed components is reached. Write the
starting time o the curing on the pipe, next to the heating blanket (see g. 8.4.d).
For the required curing process reerence is made to the relevant adhesive instructions (see section 2).
g Adhesive bonded fanges shall be cured by placing the heating blanket
against the inner surace o the fange.
For an optimal heat transer the blanket shall be pressed against the
inner surace o the jointed parts, ater the excess adhesive has been
removed rom the inside o the joint (see g. 8.4.g).
h I the curing process does not comply with the requirements o the curing
cycle, the complete curing cycle shall be repeated.
i The electrical power to the heating blanket shall be switched o ater
completion o the curing time and ater having checked the surace
temperature or the last time.
Indicate the end time o the curing cycle on the pipe.
It is advised to mark the joint, indicating that the adhesive is cured.
Allow the joint to cool down beore loading mechanically or hydrostatically.
Fig. 8.4.b
Fig. 8.4.d
Fig. 8.4.g
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 14/22
WAVISTRONGAssemblyInstructions
13 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
9 Materials, tools and consumables
9.1 Materials
•Adhesive*
9.2 Tools
•Shaver*
•Heatingblanket(plustemperaturecontroller,ifapplicable)*
•Measuringtapeand/orfoldingrule
•Verniercalliper •Pi-tape
•Pipetters’wrap-around
•Levelandmarker
•Protractor
•Pipeviceorstablesupports(brackets)withrubbercoatedclampingdevice
•Hacksaw,discgrinderorpowerjigsaw
•Smallelectricalorairdrivengrindingmachine
•Pairsofwinchesorcome-alongs(ifapplicable)
•Pairsofbandclampswithpullerrings(ifapplicable)
•Insulationmaterialor-blankets
•Digitaltemperaturegaugeforsurfacetemperaturemeasurement
•Dewpointmeter •Thermometer
•Relativehumiditymeter
•Infraredthermometer
•Hotairblower
•Tenting(subjecttoweatherconditions)
* To be supplied by the pipe manufacturer.
9.3 Consumables
•Cuttingdisks
•Emerydisks,emerycups,emerycloth,apperwheels(allgradeP40toP60)
•Spatula(rubberscraperplate,llingknife),markerpen,dust(paint)brush
•Rubbergloves,workinggloves,dustmasks,safetygoggles
•Cleaningplug
•Overalls,safetyshoes,safetyhelmet
•Cleaningrags,cleaninguidsuchasacetone,MethylEthylKetone(MEK)orMethylIsoButylKetone(MIBK)
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 15/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 14
10 Health and saety
When working with GRE products, ollowing saety precautions shall be taken:
•Wearatalltimesuitableprotectiveclothing
•UsePersonnelProtectiveEquipment(PPE),suchas:
-Longsleeves
- Hard hat (i required by site conditions)
- Saety shoes
- Glasses
- Gloves (or mechanical and chemical protection)
- Dust mask (during machining and sanding)
- Ear protection (during mechanical operations)
For health and saety data reerence is made to the applicable instructions
(see section 2).
Fig. 10
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 16/22
WAVISTRONGAssemblyInstructions
15 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
Annex A Schemes assembly process Conical-Cylindrical bonded joint
Annex A1 Scheme o spigot dimensioning process
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 17/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 16
Annex A2 Scheme o adhesive bonding process
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 18/22
WAVISTRONGAssemblyInstructions
17 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
Annex B Minimum cut length
Fig.BMinimumcutlength(Lo)forpipeConicalBell–CylindricalSpigot
TableBMinimumcutlength(Lo)(mm)
ID (mm)PN (bar)
8 12,5 16 20 25 32
25 280
40 280
50 280
65 290
80 540
100 540 550
125 550 565
150 550 560 575
200 550 565 580 600250 560 565 580 600 625
300 560 575 595 620 650
350 570 570 590 610 640
400 580 580 600 625 660
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 19/22
WAVISTRONGAssemblyInstructions
Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint 18
Annex C Dimensions Cylindrical Spigot
Fig. C Spigot dimensions
Table C Dimensions Cylindrical Spigot
PN(bar)
ID(mm)
(T)*(mm)
Tmin*(mm)
Tmax*(mm)
S1*(0,+0,4)
(mm)
SA*(0,+4)(mm)
8350 3,3 2,6 4,1 356,6 74
400 3,7 2,9 4,5 407,4 84
12,5
250 3,0 2,5 3,5 256,0 64
300 3,5 2,9 4,1 307,0 64
350 4,0 3,3 4,7 358,0 75
400 4,5 3,7 5,3 409,0 85
16
200 3,0 2,6 3,4 206,0 54
250 3,7 3,2 4,7 257,4 69
300 4,3 3,7 4,9 308,6 80
350 4,9 4,2 5,6 359,8 95
400 5,6 4,8 6,4 411,2 105
20
150 2,9 2,6 3,2 155,8 54
200 3,8 3,4 4,2 207,6 69
250 4,6 4,1 5,6 259,2 85
300 5,4 4,8 6,0 310,8 100
350 6,2 5,5 6,9 362,4 116
400 7,0 6,2 7,8 414,0 131
*(T) =Nominalwallthicknessofthespigot(forreferenceonly)
TolT = Tolerance on wall thickness o the spigot (T)
= ± (0.002 x ID, ≥ 0.3)
*Tmin
= Minimum wall thickness o spigot
= T – TolT
*Tmax
= Maximum wall thickness o spigot
= T + TolT
*S1 =NominalSpigotDiameter
*SA =NominalSpigotLength
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 20/22
WAVISTRONGAssemblyInstructions
19 Wavistrong Assembly Instructions Conical-Cylindrical (CB-CS) Adhesive Bonded Joint
Fig. C Spigot dimensions
Table C Dimensions Cylindrical Spigot
PN(bar)
ID(mm)
(T)*(mm)
Tmin*(mm)
Tmax*(mm)
S1*(0,+0,4)
(mm)
SA*(0,+4)(mm)
25
100 2,9 2,6 3,2 105,8 44
125 3,1 2,8 3,4 131,2 54
150 3,6 3,3 3,9 157,2 64
200 4,6 4,2 5,0 209,2 85
250 5,6 5,1 6,1 261,2 105
300 6,6 6,0 7,2 313,2 126
350 7,6 6,9 8,3 365,2 146
400 8,7 7,9 9,5 417,4 167
32
25 2,3 2,0 2,6 29,6 34
40 2,3 2,0 2,6 44,6 34
50 2,3 2,0 2,6 54,6 34
65 2,9 2,6 3,2 70,8 44
80 2,9 2,6 3,2 85,8 44
100 3,1 2,8 3,4 106,2 54
125 3,7 3,4 4,0 132,4 69
150 4,3 4,0 4,6 158,6 80
200 5,6 5,2 6,0 211,2 105
250 6,9 6,4 7,4 263,8 131
300 8,2 7,6 8,8 316,4 157
*(T) =Nominalwallthicknessofthespigot(forreferenceonly)
TolT = Tolerance on wall thickness o the spigot (T)
= ± (0.002 x ID, ≥ 0.3)
*Tmin
= Minimum wall thickness o spigot
= T – TolT
*Tmax
= Maximum wall thickness o spigot
= T + TolT
*S1 =NominalSpigotDiameter
*SA =NominalSpigotLength
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 21/22
WAVISTRONGMontageInstructies
Wavistrong Montage Instructies Conisch-Cylindrische (CB-CS) Lijmverbinding20
7/28/2019 WAVINSTRONG MONTAJE
http://slidepdf.com/reader/full/wavinstrong-montaje 22/22
C D 0 2 2 ( E ) R e v .
0 2 0 1 2 0 2 0 1