Operations updateMacquarie valley drought response: Water outage and temporary works
WaterNSW ABN 21 147 934 787169 Macquarie Street Parramatta NSW 2150PO Box 398, Parramatta NSW 2124T 1300 662 077 E [email protected] waternsw.com.au
14 June 2019
WaterNSW is in the final stage investigations to install temporary and removable modifications at Warren Weir and at Duck Creek and Crooked Creek regulators. Investigations began in early May 2019 for short-to-medium term projects that would extend the existing, limited water supplies in the Macquarie Valley.
Installation of the temporary modifications is expected to start in mid July 2019 and would take about two weeks to complete, weather permitting. Works will be in accordance with relevant approvals and environmental guidelines.
During the installation of these works, we will need to cease flows and water deliveries for seven to ten days. The water outage is expected from mid July 2019: This will reduce water levels to allow for safe access around the weir and regulators. When works are completed, current conditions will return with minimal flows and normal drought operations will continue.
If the current drought conditions continue into spring 2019, the temporary modifications will be used to raise the weir pool restricting flows past Warren Weir. We are also planning to close the fish passage at Duck Creek and Crooked Creek regulators to further manage flows.
These temporary changes will allow us to conserve water for town water supply and high security users and effectively manage storage and minimise system losses in the supply of water to the regional towns of Nyngan and Cobar. When rain events occur, the temporary modification can be removedefficiently, allowing flows to be directed to downstream customers when possible.
Under the assumption of no significant rainfall, no inflow to the river system, and no drought relief measures in place, the river and all flows are expected to cease by the end of March 2020. These modifications will assist with extending the water supply.
Timeframes are being finalised. We will notify you again when works and water outages are scheduled.
What we suggest you do nowWater users are advised to place orders now if they are considering extracting water before the end of the 2018/19 water year. Department of Industry -Water has advised potential restrictions to water allocation from 1 July 2019, the start of the 2019-20 water year. To view your current water allocation statement and water availability outlook for 2019-20
Update on River Operations Stakeholder Consultation Committee (ROSCCo)The new ROSCCo recently met in Narromine on 16 May to discuss and continue drought contingency planning and relief measures. We are working closely with government agencies and key stakeholders to ensure the options meet the critical water needs of regional towns and that the social, environmental and economic impacts are being monitored and effectively managed. For more information and to see the presentation, visit our webpage
Authorised by
Sri Sritharan,
Water System Operations Manager - Central
FRON
T VI
EWSC
ALE
1 : 10
0
PLAN
VIE
WSC
ALE
1 : 10
0
DETA
IL D
MID.
BOA
RD
SECT
ION
E-E
SCAL
E 1 :
25
DETA
IL F
SIDE
BOA
RD
SECT
ION
G-G
SCAL
E 1 :
25
ISOM
ETRI
C
SIDE
PAN
ELS
NAME
PLA
TEAL
UMIN
IUM,
RIVE
TED
ON
MIDD
LE P
ANEL
S NA
ME P
LATE
ALUM
INIU
M,RI
VETE
D ON
D
E E
F
G G
A3
12
34
56
78
12
34
56
78
A B C D E F
A B C D E F
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
1 OF
2 A
CONC
EPT
ONLY
HADM
H7/0
6/201
9
BDR
AWIN
G NU
MBER
, WIN
CHES
HA
DMH
13/06
/2019
N.T.
S11
0-ER
T-20
19-0
001
B
ERTE
CH/W
ATER
NSW
-CRO
OKED
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
CONC
EPT
ONLY
GENE
RAL A
RRAN
GEME
NT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
R US
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST TR
ACK
FABR
ICAT
ION
AND
DESI
GN.
1431WATER HEAD43
0BO
ARD
WID
TH
836WATER HEAD
430
BOAR
DW
IDTH
HILT
I HAS
-E-F
M12
x110
-28
BLIN
D RI
VET
Ø6.4
shan
k, mi
n. gr
ip1.6
Alum
inum
FLOW
FLOW
DOOR
LEAF
HAN
DLE
8mm
SHEE
TAl
uminu
m 50
83 H
116
SIDE
DOO
R LE
AF
8mm
SHEE
TAl
uminu
m 50
83 H
116
MIDD
LE D
OOR
LEAF
8mm
SHEE
TAl
uminu
m 50
83 H
116
HILT
I HAS
-E-F
M12
x110
-28
SILL
UNIS
TRUT
Alum
inum
6061
100
55
HEX
BOLT
HEX-
BOLT
M12
x40 A
S111
0St
ainles
s Stee
l AIS
I 316
GROU
T, N
ON S
HRIN
K10
mm
GROU
T, N
ON S
HRIN
K10
mm
SEAL
PVC
50 D
URO
WIN
CHES
OF
150k
g CAP
ACIT
Y W
ILL B
E MO
UNTE
D ON
THE
WAL
KWAY
RIDG
E 1,
FRON
T VI
EWCL
IENT
TO
APPR
OVE
DIME
NSIO
NSSI
DE V
IEW
A3
12
34
56
78
12
34
56
78
A B C D E F
A B C D E F
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
2 OF
2 A
CONC
EPT
ONLY
HADM
H7/0
6/201
9
BDR
AWIN
G NU
MBER
, WIN
CHES
HA
DMH
13/06
/2019
N.T.
S11
0-ER
T-20
19-0
001
B
ERTE
CH/W
ATER
NSW
-CRO
OKED
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
CONC
EPT
ONLY
GENE
RAL A
RRAN
GEME
NT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
R US
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST TR
ACK
FABR
ICAT
ION
AND
DESI
GN.
712 (
TYP.
)11
05 (T
YP.)
2401
836
1250
1631
200
836
FRON
T VI
EWSC
ALE
1 : 41
PLAN
VIE
WSC
ALE
1 : 41
DETA
IL AD
SCAL
E 1 :
8
DETA
IL AE
SCAL
E 1 :
10
VIEW
AU
STRU
CTUR
E NO
T SH
OWN
FOR
A CL
ARIT
Y
VIEW
AV
STRU
CTUR
E NO
T SH
OWN
FOR
A CL
ARIT
Y
G
J J
AD
AE
AFAF
AUAV
A1
12
34
56
78
12
34
56
78
AA
91010
911
12
1112
B C D E F G H I J
B C D E F G H I J
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
1 OF
4 A
CONC
EPT
HA14
/05/20
19
BGE
NERA
L ARR
ANGE
MENT
HADM
H28
/05/20
19C
VARI
OUS
CHAN
GES,
CON
CEPT
HADM
H07
/06/20
19
EIF
RHA
DMH
20/06
/2019
N.T.
S11
0-ER
T-20
19-0
000
E
ERTE
CH/W
ATER
NSW
-WAR
REN
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
WAR
REN
WEI
RSE
G. S
TOPB
OARD
SGE
NERA
L ARR
ANGE
MENT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
RUS
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST T
RACK
FAB
RICA
TION
AND
DES
IGN.
FLOW
SPEC
S.SE
CITO
NSCO
LUMN
SW
EIGH
T: 8
KgW
EIGH
T: 11
Kg e
ach
qty: 7
0qty
: 15
500
NORM
AL W
ATER
LEVE
LRL
: 194
.4
2593
0
FLOW
1604
14XS
PAN
100m
m HE
IGHT
SEG
MENT
S
196.4
RL:
193.9
0RL
:
1540
.5CL
EAR
WAT
ER W
AY
4224
6630
HILT
I HVU
2+HI
S-RN
M12
EMBE
DMEN
T 12
5St
ainles
s Stee
l AIS
I 316
FIXE
D BO
ARDS
TO B
E SI
MILA
RTO
OTH
ERSI
DE S
HOW
N
FISH
WAY
HEX
BOLT
HEX-
BOLT
M12
x30 A
S111
0St
ainles
s Stee
l AIS
I 316
FLAT
WAS
HER
Flat W
ashe
r-Nylo
n-Ø1
4XØ2
4X2.5
Nylon
6/6
POST
BEA
MI-B
EAM
165X
101x
800.0
mm
Alum
inum
6061
400
POUR
ED C
ONCR
ETE
1102
542
CSK
CSK-
M10x
25-S
S 31
6-gr
Stain
less S
teel A
ISI3
16FL
USH
ANCH
ORHI
LTI H
KD-S
R M1
0X40
Stain
less S
teel
GROU
T, N
ON S
HRIN
K
HILT
I HVU
2+HI
S-RN
M12
EMBE
DMEN
T 12
5St
ainles
s Stee
l AIS
I 316
INSU
LATI
NG W
ASHE
RTO
PHAT
M12
x8Ny
lon 6/
6
HEX
BOLT
HEX-
BOLT
M12
x40 A
S111
0St
ainles
s Stee
l AIS
I 316
PLAT
E BA
RRIE
R AN
GLE
E.A
50X6
X685
Alum
inum
6061
POST
BEA
MI-B
EAM
165X
101x
630.0
mm
Alum
inum
6061
STEP
PLA
TE 1
8.0 m
mmm
PLAT
EAl
uminu
m 50
83 H
116
FLUS
HAN
CHOR
HILT
I HKD
-SR
M10X
40St
ainles
s Stee
l
SEAL
ING
RUBB
ER,, P
VC3m
m TH
ICK
Rubb
erBE
TWEE
N PL
ATES
AND
I-BEA
MS
CSK
CSK-
M10x
25-S
S 31
6-gr
Stain
less S
teel A
ISI 3
16
END
BARR
IER
PLAT
E6.0
mm S
HEET
Alum
inum
5005
H34
END
BARR
IER
PLAT
E 2,
6MM
SHEE
TX45
0 lon
g
SECT
ION
J-JSC
ALE
1:10
DETA
IL G
SCAL
E 1:5
DETA
IL JA
SCAL
E 1 :
4
SECT
ION
AF-A
FSC
ALE
1 : 5
JA
A3
12
34
56
78
12
34
56
78
A B C D E F
A B C D E F
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
2 OF
4 A
CONC
EPT
HA14
/05/20
19
BGE
NERA
L ARR
ANGE
MENT
HADM
H28
/05/20
19C
VARI
OUS
CHAN
GES,
CON
CEPT
HADM
H07
/06/20
19
EIF
RHA
DMH
20/06
/2019
N.T.
S11
0-ER
T-20
19-0
000
E
ERTE
CH/W
ATER
NSW
-WAR
REN
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
WAR
REN
WEI
R SE
G. S
TOPB
OARD
SGE
NERA
L ARR
ANGE
MENT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
R US
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST TR
ACK
FABR
ICAT
ION
AND
DESI
GN.
541.8-5X101 HEIGHT SEGMENTS
738 POST HEIGHT
FLOW
FLOW
I-BEA
M IN
SERT
530.0
mm
Nylon
6
HEX
BOLT
HEX-
BOLT
M10
x55 A
S111
0St
ainles
s Stee
l AIS
I 316
CSK
Nylon
Was
her
Nylon
6/6
HILT
I HVU
2+HI
S-RN
M12
EMBE
DMEN
T 12
5St
ainles
s Stee
l AIS
I 316
8 POST
BAS
E PL
ATE
210.0
mmx
210.0
mmx
8.0 m
mAl
uminu
m 50
83 H
116
FLUS
H W
ITH C
ONCR
ETE
P-SE
AL S
UPPO
RT14
82.5
mmx2
5.0 m
mx10
.0 mm
Alum
inum
5083
H11
6
STOP
BOAR
D SE
GMEN
T CH
ANNE
L,SE
CTIO
N DI
M. W
ITH
SEAL
IS 12
4.4PF
C 10
1.6x5
0.8x1
578.5
Alum
inum
6061
MAXL
OK19
21 6.
4X29
.3RI
VET-
MAXL
OK 19
21 1/
4"Al
uminu
m
CSK-
M12x
30-S
S 31
6-gr
P-SE
AL, B
ENT
1495
.0 mm
PVC
50 D
URO
FLOW
POST
HAN
DLE
160.0
mmx
120.0
mmX
6.0 m
mAl
uminu
m 50
83 H
116
LIFTI
NG P
INØ1
0.0 m
mx50
.0 mm
Alum
inum
6060
2-OF
F PE
R SE
GMEN
T
150
TOP
CAP
CLAM
PING
PLA
TE6m
m SH
EET
Alum
inum
5083
H11
6
SEAL
RET
AINE
R14
82.5
mmx2
5.0 m
mx6.0
mm
Alum
inum
5083
H11
6
50PO
ST B
EAM
I-BEA
M 16
5X10
1x63
0.0 m
mAl
uminu
m 60
61
Flat W
ashe
r-SS
316-g
r-Ø10
.5XØ2
1X1.6
Stain
less S
teel A
ISI 3
16
30
30 150
TOP
CAP
ADJU
STIN
G PL
ATE
6mm
SHEE
TAl
uminu
m 50
05 H
34
120
SEAL
ING
RUBB
ER3m
m TH
ICK
Rubb
er
HEX
BOLT
HEX-
BOLT
M12
x40A
S111
0St
ainles
s Stee
lAIS
I 316
NYLO
C NU
TSt
ainles
s Stee
l AIS
I 316
INSU
LATI
NG W
ASHE
RTO
PHAT
M12
x8Ny
lon 6/
6
TOP
CAP
ADJU
STIN
G PL
ATE
6mm
SHEE
TAl
uminu
m 50
05 H
34
98
10 GROU
T, N
ON S
HRIN
K
30
LIP-S
EAL
EPDM
RUB
BER
LIP-S
EAL R
ETAI
NER
Stain
less S
teel A
ISI 3
16
SELF
TAP
PING
SCR
EWAN
SIB1
8.6.4
- No.
6 - 32
- 3/4
SS 31
6
I-BEA
M IN
SERT
Nylon
6SI
LL P
LATE
8.0x1
00.0x
1394
.0Al
uminu
m 50
83 H
116 ,
FI
XED
WIT
HHI
LTIH
KD-S
RM1
0X40
DRO
P IN
ANC
HORS
30
INSU
LATI
NG W
ASHE
RTO
PHAT
M8x8
Nylon
6/6
HEX
BOLT
HEX-
BOLT
M8x
35 A
S111
0St
ainles
s Stee
l AIS
I 316
SIDE
VIE
WBO
TTOM
SEG
MENT
S8 K
g
BOTT
OM S
EGME
NTS
8 Kg
SIDE
VIE
WTY
PICA
L SEG
MENT
8 Kg
TYPI
CAL S
EGME
NT8 K
g
A3
12
34
56
78
12
34
56
78
A B C D E F
A B C D E F
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
3 OF
4 A
CONC
EPT
HA14
/05/20
19
BGE
NERA
L ARR
ANGE
MENT
HADM
H28
/05/20
19C
VARI
OUS
CHAN
GES,
CON
CEPT
HADM
H07
/06/20
19
EIF
RHA
DMH
20/06
/2019
N.T.
S11
0-ER
T-20
19-0
000
E
ERTE
CH/W
ATER
NSW
-WAR
REN
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
WAR
REN
WEI
R SE
G. S
TOPB
OARD
SGE
NERA
L ARR
ANGE
MENT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
R US
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST TR
ACK
FABR
ICAT
ION
AND
DESI
GN.
LIFTI
NG P
N
101.6
124.4
1578
.5
50.8
978
50.8
101.6CUT-
OUTS
ON
EACH
END
TO IN
SERT
INTO
I-B
EAT
INSE
RT
6628 28
65
1578
.5
5050
979
5050
26.2 26.2
65
104 (
TYP.
)
104 (
TYP.
)
61.3
61.3
5 x 45
° CHA
M
A3
12
34
56
78
12
34
56
78
A B C D E F
A B C D E F
REV.
DRG
NoSC
ALE
SHEE
TAL
L DIM
ENSI
ONS
IN m
m U.
N.O.
3RD
ANGL
EPR
OJEC
TION
TITL
E
REV
DESC
RIPT
ION
DRN
APP
DATE
4 OF
4 A
CONC
EPT
HA14
/05/20
19
BGE
NERA
L ARR
ANGE
MENT
HADM
H28
/05/20
19C
VARI
OUS
CHAN
GES,
CON
CEPT
HADM
H07
/06/20
19
EIF
RHA
DMH
20/06
/2019
N.T.
S11
0-ER
T-20
19-0
000
E
ERTE
CH/W
ATER
NSW
-WAR
REN
WEI
RCO
NCEP
TFO
RST
OPBO
ARD
WAR
REN
WEI
R SE
G. S
TOPB
OARD
SGE
NERA
L ARR
ANGE
MENT
SHT
COPY
RIGH
T ©
THIS
DRA
WIN
G AN
D TH
E CO
NTEN
TSDE
PICT
ED O
R W
RITT
EN TH
EREO
N,W
HETH
ER IN
WHO
LE O
R IN
PAR
T, IS
THE
EXCL
USIV
E IN
TELL
ECTU
AL P
ROPE
RTY
OF F
AST
TRAC
K FA
BRIC
ATIO
N AN
DDE
SIGN
AND
MAY
NOT
BE
REPR
ODUC
ED O
R US
ED F
OR A
NYPU
RPOS
E W
ITHO
UT T
HE E
XPRE
SSW
RITT
EN A
PPRO
VAL O
F FA
ST TR
ACK
FABR
ICAT
ION
AND
DESI
GN.
HAND
LE6m
m TH
ICK
Alum
inum
5083
H11
6
SIE
BARR
IER
PLAT
E6m
mTH
CKAlu
minu
m50
05 H
34
PLAT
E BA
RRIE
R AN
GLE
E.A
50X6
X685
Alum
inum
6061
SEAL
ING
RUBB
ER, P
VC3m
m TH
ICK
Rubb
erFA
CES
SIDE
POS
T I-B
EAM
SEAL
ING
RUBB
ER3m
m TH
ICK
Rubb
erCU
T EX
TRA
TO C
OVER
THE
VOI
DBE
TWEE
N P
SEAL
AND
SID
E PO
ST
220 219.9
66.5°
WEI
GHT:
12kg
120
80
6
GROU
T, N
ON S
HRIN
K
DRILL
Ø15
THR
U(x1
1)
63x
120
63x
120
3.5°
FLUS
H AN
CHOR
HILT
I HKD
-SR
M10X
40St
ainles
s Stee
l
CSK
CSK-
M10x
25-S
S 31
6-gr
Stain
less S
teel A
ISI 3
16R2
6
5071
.9
80
37.9
FOR
RE
VIE
W
▪
≤≥
≥≥
≥≤
FOR
RE
VIE
W
FOR
RE
VIE
W
(a) Any environmental impact on a community?
(b) Any transformation of a locality?
(c) Any environmental impact on the ecosystem of the locality?
(d) Any reduction of the aesthetic, recreational, scientific or otherenvironmental quality or value of a locality?
(e) Any effect on a locality, place or building having aesthetic,anthropological, archaeological, architectural, cultural, historical, scientificor social significance or other special value for present or futuregenerations?
(f) Any impact on the habitat of protected fauna (within the meaning of theNational Parks and Wildlife Act 1974)?
(g) Any endangering of any species of animal, plant or other form of life,whether living on land, in water or in the air?
(h) Any long-term effects on the environment?
(i) Any degradation of the quality of the environment?
(j) Any risk to the safety of the environment?
(k) Any reduction in the range of beneficial uses of the environment?
(l) Any pollution of the environment?
(m) Any environmental problems associated with the disposal of waste?
(n) Any increased demands on resources (natural or otherwise) that are,or are likely to become, in short supply?
(o) Any cumulative environmental effect with other existing or likely futureactivities?
Operations update
Water Delivery Arrangements Macquarie River
WaterNSW ABN 21 147 934 787 169 Macquarie Street Parramatta NSW 2150 PO Box 398, Parramatta NSW 2124 T 1300 662 077 E [email protected] waternsw.com.au
1 July 2019
Update The severe and ongoing drought conditions across NSW are having a significant impact on the
ability of WaterNSW to deliver water to customers.
Over the last two years, rainfall across northern NSW has been well below average and in many
areas are now the lowest ever recorded. This, combined with higher than average temperatures,
has resulted in record low inflows to the storages. Inflows to Burrendong Dam are 36% of the
previous low record.
While allocations for the Macquarie River system have been announced by the NSW Department
of Planning, Industry and Environment, the delivery of water is restricted due to the ongoing
drought.
The Macquarie River system is currently being operated under drought contingency measures with
water delivery restrictions.
The water delivery restrictions and operational arrangements are outlined in the tables below and
are specifically outlined for each river section to best assist landholders and customers with
information relevant to their specific circumstances
Access to water this year will be highly dependent on further inflows into the catchment and
associated tributary inflows downstream from WaterNSW storages.
We encourage our customers and community to stay up to date with the latest information via the
options below.
Stay informed 1. Early Warning Network (EWN)
Customers will be notified of access arrangements through our EWN. If you have not
already signed up to the system, please phone us on 1300 662 077 or email us at
WaterNSW ABN 21 147 934 787 169 Macquarie Street Parramatta NSW 2150 PO Box 398, Parramatta NSW 2124 T 1300 662 077 E [email protected] waternsw.com.au
2. eNewsletters
Customers can stay up to date through weekly email communications sent by WaterNSW.
Visit waternsw.com.au/subscribe to choose which reports you would like to receive.
3. Website
Drought information is available on our website and updated weekly. Visit
waternsw.com.au/supply/drought-information
AWDs for Macquarie River 1 July 2019
Licence Category AWD Deliverability Domestic and Stock 80% Restricted – please see details below
Domestic and Stock (Domestic) 80% Restricted – please see details below
Domestic and Stock (Stock) 80% Restricted – please see details below
Local Water Utility 80%
Regulated River (General Security) 0% Restricted – please see details below
Regulated River (General Security) Carryover allocations
n/a Restricted – please see details below
Regulated River (High Security) 70% Restricted – please see details below
Regulated River (High Security) (Research) 35% Restricted – please see details below
Regulated River (High Security) (Town Water Supply)
35% Restricted – please see details below
Supplementary Water 100% Subject to availability
Deliverability of ordered water
River section Licence category Type of restriction Period of applicability
Method of placing water order
Burrendong Dam to Warren Weir
All licence categories
Unrestricted delivery of account water. Water orders to be placed as normal.
Until further notice
iWAS and customer help desk.
Burrendong Dam to Warren Town Weir (ESID: 2159)
Local Water Utility Unrestricted delivery of account water. Water orders to be placed as normal.
Until further notice
iWAS and customer help desk.
Warren Weir to Marebone Weir
All licence categories
Delivery of account water only with tributary flows and not with dam releases.
Until further notice
Only via customer help desk.
WaterNSW ABN 21 147 934 787 169 Macquarie Street Parramatta NSW 2150 PO Box 398, Parramatta NSW 2124 T 1300 662 077 E [email protected] waternsw.com.au
Water order is required to be placed and need to be approved by WaterNSW.
Confirmation of water order from WaterNSW is required.
Downstream of Marebone Weir
All licence categories
Delivery of account water only with tributary flows and not with dam releases.
Water order is required to be placed and need to be approved by WaterNSW.
Until further notice
Only via customer help desk.
Confirmation of water order from WaterNSW is required.
Downstream of Marebone Break and Bulgeragar Creek
All licence categories
Delivery of account water only with tributary flows and not with dam releases.
Water order is required to be placed and need to be approved by WaterNSW.
Until further notice
Only via customer help desk.
Confirmation of water order from WaterNSW is required.
Gunningbar Creek offtake to Gunningbar Weir
All licence categories
Unrestricted delivery of account water. Water orders to be placed as normal.
Until further notice
iWAS and customer help desk.
Gunningbar Weir to Bogan River confluence
All licence categories
Unrestricted delivery of account water. Water orders to be placed as normal.
Until further notice
iWAS and customer help desk.
Downstream of Duck Creek offtake
All licence categories
Delivery of account water only with tributary flows and not with dam releases.
Water order is required to be placed and need to be approved by WaterNSW.
Until further notice
Only via customer help desk.
Confirmation of water order from WaterNSW is required.
Downstream of Crooked Creek offtake
All licence categories
Delivery of account water only with tributary flows and not with dam releases.
Water order is required to be placed and need to be approved by WaterNSW.
Until further notice
Only via customer help desk.
Confirmation of water order from WaterNSW is required.
Trade restrictions
River section Licence category Type of restriction Period of applicability Macquarie River General Security Trading from general security licences
in the Macquarie River to any licences in Macquarie or Cudgegong rivers is suspended
Until further notice
Macquarie River High security and Supplementary licences
Trading is unaffected Until further notice
WaterNSW ABN 21 147 934 787 169 Macquarie Street Parramatta NSW 2150 PO Box 398, Parramatta NSW 2124 T 1300 662 077 E [email protected] waternsw.com.au
Cudgegong River to Macquarie River
All licence categories
Trading of allocations is suspended Until further notice
Macquarie River to Cudgegong River
High security and Supplementary licences
Trading is unaffected Until further notice
Authorised by
Sri Sritharan Water System Operations Manager Central
More information Please visit our website for more information at waternsw.com.au/supply/regional-nsw/customer-
notices. For more information on this event, phone us on 1300 662 077 or email us at
Aus
trost
ipa
wak
oolic
a
Aus
trost
ipa
erem
ophi
laA
. dru
mm
ondi
iA
ustro
dant
honi
a er
iant
haC
heila
nthe
s si
eber
i
pseu
dove
llea
Diu
ris tr
icol
or
Pte
rost
ylis
co
bare
nsis
Euc
alyp
tus
virid
isE
ucal
yptu
s vi
cina
Cas
uarin
a cr
ista
taS
enna
Ere
mop
hila
Sw
ains
ona
mur
raya
na
Sw
ains
ona
rect
a
Maccullochella peelii peeliiAn ‘important population’ of a vulnerable species is defined by DotE (2013) as ‘…a population that is necessary for the species’ long-term survival and recovery. This may include populations identified as such in recovery plans, and/or that are:
According to the DotE (2013) ‘significant impact criteria’ for a vulnerable species, an action is likely to have a significant impact on an vulnerable species if there is a real chance or possibility that it will:
Lead to a long-term decrease in the size of an important population
Reduce the area of occupancy of the species
Fragment an existing important population into two or more populations
Adversely affect habitat critical to the survival of a species
Disrupt the breeding cycle of an important population
Modify, destroy, remove, isolate or decrease the availability or quality of habitat to the extent that the species is likely to decline
Result in invasive species that are harmful to a vulnerable species becoming established in the vulnerable species’ habitat
Cyprinus carpio Gambusia affinis (
Introduce disease that may cause the species to decline
Interfere with the recovery of the species
Conclusion
Bidyanus bidyanus
According to the DotE (2013) ‘significant impact criteria’ for endangered species, an action is likely to have a significant impact on a critically endangered species if there is a real chance or possibility that it will:
Lead to a long-term decrease in the size of a population
Reduce the area of occupancy of the species
Fragment an existing population into two or more populations
Adversely affect habitat critical to the survival of a species
Disrupt the breeding cycle of a population
Modify, destroy, remove, isolate or decrease the availability or quality of habitat to the extent that the species is likely to decline
Result in invasive species that are harmful to a vulnerable species becoming established in the vulnerable species’ habitat
Cyprinus carpio Gambusia affinis (
Introduce disease that may cause the species to decline
Interfere with the recovery of the species
Conclusion
Maccullochella macquariensis
According to the DotE (2013) ‘significant impact criteria’ for endangered species, an action is likely to have a significant impact on an endangered species if there is a real chance or possibility that it will:
Maccullochella macquariensisLead to a long-term decrease in the size of a population
Reduce the area of occupancy of the species
Maccullochella macquariensis
Fragment an existing population into two or more populations
Adversely affect habitat critical to the survival of a species
Disrupt the breeding cycle of a population
Modify, destroy, remove, isolate or decrease the availability or quality of habitat to the extent that the species is likely to decline
Maccullochella macquariensis
Result in invasive species that are harmful to a vulnerable species becoming established in the vulnerable species’ habitat
Cyprinus carpio Gambusia affinis (
Introduce disease that may cause the species to decline
Interfere with the recovery of the species
Conclusion
Maccullochella macquariensis
Maccullochella macquariensisMaccullochella macquariensis
a) in the case of a threatened species, whether the action proposed is likely to have an adverse effecton the life cycle of the species such that a viable local population of the species is likely to be placed atrisk of extinction
Maccullochella macquariensis
b) in the case of an endangered population, whether the action proposed is likely to have an adverseeffect on the life cycle of the species that constitutes the endangered population such that a viable localpopulation of the species is likely to be placed at risk of extinction
(c) in the case of an endangered ecological community or critically endangered ecological community,whether the action proposed:i) is likely to have an adverse effect on the extent of the ecological community such that its localoccurrence is likely to be placed
(ii) is likely to substantially and adversely modify the composition of the ecological community such thatits local occurrence is likely to be placed at risk of extinction
d) in relation to the habitat of a threatened species, population or ecological community:(i) the extent to which habitat is likely to be removed or modified as a result of the action proposed, and
ii) whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as aresult of the proposed action, and
Maccullochella macquariensis
(iii) the importance of the habitat to be removed, modified, fragmented or isolated to the long-termsurvival of the species, population or ecological community in the locality
(e) whether the action proposed is likely to have an adverse effect on critical habitat (either directly orindirectly)
(f) whether the action proposed is consistent with the objectives or actions of a recovery plan or threatabatement plan
g) whether the action proposed constitutes or is part of a key threatening process or is likely to result inthe operation of, or increase the impact of, a key threatening process
Conclusion
Maccullochella macquariensis
Bidyanus bidyanusBidyanus bidyanus
a) in the case of a threatened species, whether the action proposed is likely to have an adverse effecton the life cycle of the species such that a viable local population of the species is likely to be placed atrisk of extinction
Bidyanus bidyanus
b) in the case of an endangered population, whether the action proposed is likely to have an adverseeffect on the life cycle of the species that constitutes the endangered population such that a viable localpopulation of the species is likely to be placed at risk of extinction
(c) in the case of an endangered ecological community or critically endangered ecological community,whether the action proposed:i) is likely to have an adverse effect on the extent of the ecological community such that its localoccurrence is likely to be placed
(ii) is likely to substantially and adversely modify the composition of the ecological community such thatits local occurrence is likely to be placed at risk of extinction
d) in relation to the habitat of a threatened species, population or ecological community:(i) the extent to which habitat is likely to be removed or modified as a result of the action proposed, and
ii) whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as aresult of the proposed action, and
(iii) the importance of the habitat to be removed, modified, fragmented or isolated to the long-termsurvival of the species, population or ecological community in the locality
Bidyanus bidyanus
(e) whether the action proposed is likely to have an adverse effect on critical habitat (either directly orindirectly)
(f) whether the action proposed is consistent with the objectives or actions of a recovery plan or threatabatement plan
g) whether the action proposed constitutes or is part of a key threatening process or is likely to result inthe operation of, or increase the impact of, a key threatening process
Conclusion
Bidyanus bidyanus
Tandanus tandanusTandanus tandanus
a) in the case of a threatened species, whether the action proposed is likely to have an adverse effecton the life cycle of the species such that a viable local population of the species is likely to be placed atrisk of extinction
b) in the case of an endangered population, whether the action proposed is likely to have an adverseeffect on the life cycle of the species that constitutes the endangered population such that a viable localpopulation of the species is likely to be placed at risk of extinction
Tandanus tandanus
Tandanus tandanus(c) in the case of an endangered ecological community or critically endangered ecological community,whether the action proposed:i) is likely to have an adverse effect on the extent of the ecological community such that its localoccurrence is likely to be placed
(ii) is likely to substantially and adversely modify the composition of the ecological community such thatits local occurrence is likely to be placed at risk of extinction
d) in relation to the habitat of a threatened species, population or ecological community:(i) the extent to which habitat is likely to be removed or modified as a result of the action proposed, and
ii) whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as aresult of the proposed action, and
(iii) the importance of the habitat to be removed, modified, fragmented or isolated to the long-termsurvival of the species, population or ecological community in the locality
(e) whether the action proposed is likely to have an adverse effect on critical habitat (either directly orindirectly)
(f) whether the action proposed is consistent with the objectives or actions of a recovery plan or threatabatement plan
Tandanus tandanusg) whether the action proposed constitutes or is part of a key threatening process or is likely to result inthe operation of, or increase the impact of, a key threatening process
Conclusion
Tandanus tandanus
a) in the case of a threatened species, whether the action proposed is likely to have an adverse effecton the life cycle of the species such that a viable local population of the species is likely to be placed atrisk of extinction
b) in the case of an endangered population, whether the action proposed is likely to have an adverseeffect on the life cycle of the species that constitutes the endangered population such that a viable localpopulation of the species is likely to be placed at risk of extinction
(c) in the case of an endangered ecological community or critically endangered ecological community,whether the action proposed:i) is likely to have an adverse effect on the extent of the ecological community such that its localoccurrence is likely to be placed at risk of extinction
(ii) is likely to substantially and adversely modify the composition of the ecological community such thatits local occurrence is likely to be placed at risk of extinction
d) in relation to the habitat of a threatened species, population or ecological community:(i) the extent to which habitat is likely to be removed or modified as a result of the action proposed, and
ii) whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as aresult of the proposed action, and
(iii) the importance of the habitat to be removed, modified, fragmented or isolated to the long-termsurvival of the species, population or ecological community in the locality
(e) whether the action proposed is likely to have an adverse effect on critical habitat (either directly orindirectly)
(f) whether the action proposed is consistent with the objectives or actions of a recovery plan or threatabatement plan
g) whether the action proposed constitutes or is part of a key threatening process or is likely to result inthe operation of, or increase the impact of, a key threatening process
Conclusion
RESULTS OF THE AHIMS SEARCH HAVE BEEN REMOVED AS A CONDITION OF AHIMS DATABASE USE
RESULTS OF THE AHIMS SEARCH HAVE BEEN REMOVED AS A CONDITION OF AHIMS DATABASE USE
RESULTS OF THE AHIMS SEARCH HAVE BEEN REMOVED AS A CONDITION OF AHIMS DATABASE USE