Watermain Rehabilitation Eliminating the need for temporary bypass Derrick Horsman, P.Eng. Alltech...
-
Upload
haven-hayley -
Category
Documents
-
view
214 -
download
0
Transcript of Watermain Rehabilitation Eliminating the need for temporary bypass Derrick Horsman, P.Eng. Alltech...
Watermain RehabilitationWatermain RehabilitationEliminating the need for temporary bypassEliminating the need for temporary bypass
Derrick Horsman, P.Eng.
Alltech Solutions INC
OverviewOverview
Watermain problems and issuesWatermain problems and issues Spray Lining OverviewSpray Lining Overview Same Day Return to Service ?Same Day Return to Service ?
Eliminating Temporary BypassEliminating Temporary Bypass
The Problem:Despite recent increases in public infrastructure investments, municipal infrastructure is decaying faster than it is being renewed.1
1 National Guide to Sustainable Municipal Infrastructure.
Eliminating Temporary BypassEliminating Temporary Bypass
The Cause:
Internal (External) corrosion
Watermain breaks
Pipe surpassed useful life
Eliminating Temporary BypassEliminating Temporary Bypass
Inadequate Fire Inadequate Fire ProtectionProtection
High Rate of LeakageHigh Rate of Leakage
Eliminating Temporary BypassEliminating Temporary Bypass
Eliminating Temporary BypassEliminating Temporary Bypass
Eliminating Temporary BypassEliminating Temporary Bypass
What do we do?What do we do?
Eliminating Temporary BypassEliminating Temporary Bypass
Conventional open cut replacement
Low dig options Directional drilling Sliplining Pipebursting CIPP lining
Traditional Cleaning and Spray LiningCement lining processEpoxy lining process
Modern Cleaning and Spray LiningRapid cure polyurethane systemRapid cure high build system
Eliminating Temporary BypassEliminating Temporary Bypass
TRADITIONAL CLEANING AND SPRAY LINING Cement Lining process Epoxy Lining process
• Less expensive• No reduction in flow capacity• No requirement to re-tap services
• Some disruption• Not suitable for certain water types• Superseded in Europe by polyurethane lining systems.• Requires above ground temporary water supply $$$$$$$ ??
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
TRADITIONAL CLEANING AND CEMENT LINING
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
Eliminating Temporary BypassEliminating Temporary Bypass
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service•Only approved rapid cure material <15 sec•Potential for contamination effectively eliminated•No leaching•Immediate rectification of lining faults
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service• No requirement for above ground bypass
•Improved customer services; multi-stage notification process•Operations carried out during working hours•Removes potential hazards (ie. Tripping hazards, random breaks, security issues)
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service• No requirement for above ground bypass • Substantially less expensive - cost of bypass 20-45% of total job (Awwarf)
•Cost of temporary resources reduced•Shorter construction duration
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service• No requirement for above ground bypass • Substantially less expensive• Greatly reduced disruption
•Minimal setup time•Rapid road reinstatement•Small job site footprint
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service• No requirement for above ground bypass • Substantially less expensive• Greatly reduced disruption• Some revaluation of capital asset?• No reduction in flow capacity
•Application of 1mm – 5mm
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
MODERN CLEANING AND SPRAY LINING Rapid Cure Polyurethane system Rapid Cure High Build system
• Same day return to service• No requirement for above ground bypass • Substantially less expensive• Greatly reduced disruption• Some revaluation of capital asset?• No reduction in flow capacity• No requirement to re-tap services
Spray LiningSpray LiningSpray LiningSpray Lining
Eliminating Temporary BypassEliminating Temporary Bypass
Spray Lining High Build Structural Spray Lining High Build Structural SystemSystem
Spray Lining High Build Structural Spray Lining High Build Structural SystemSystem
1. Tough enough to survive dynamic loading at failure2. Ductile enough to accommodate movement after failure3. Sufficient shear strength to maintain longitudinal continuity4. Sufficient flexural strength to provide long term corrosion void spanning
capability
Performance Requirements for Lining Material
Eliminating Temporary BypassEliminating Temporary Bypass
Spray Lining High Build Structural Spray Lining High Build Structural SystemSystem
Spray Lining High Build Structural Spray Lining High Build Structural SystemSystem
Semi-Structural Lining
0
1
2
3
4
5
6
2 4 6 8 10 12 14 16 18 20 22 24Operating Pressure (Bar)
Lin
ing
Th
ickn
ess
(mm
)
1 Bar = 14.5 psi
@3mm 145psi
@5mm 348 psi
Eliminating Temporary BypassEliminating Temporary Bypass
Rapid Cure Polyurethane North American Experience•City of Saint John, NB •City of Moncton, NB•Atlantic Health Sciences Corporation, Saint John, NB•Millstone Nuclear Power Plant, Niantic, CT, USA•Region of Niagara, ON•New York Department of Environmental Protection
Rapid Cure Polyurethane International Experience•United Kingdom, Russia, India, Switzerland and Malaysia•More than 8,000 km in the UK by our partner affiliates
Spray Lining – Rapid Cure Spray Lining – Rapid Cure PolyurethanePolyurethane
Spray Lining – Rapid Cure Spray Lining – Rapid Cure PolyurethanePolyurethane
Eliminating Temporary BypassEliminating Temporary Bypass
QUESTIONS ???
Eliminating Temporary BypassEliminating Temporary Bypass