Page 1: Water Treatment Plant Presentation Final
Page 2: Water Treatment Plant Presentation Final

City of Amsterdam, NY Water Treatment Plant

Page 3: Water Treatment Plant Presentation Final

Chief Plant Operator 28 Years Experience

Senior Plant Operator 22 Years Experience

Lab Technician 29 Years Experience

Operator/Tecnician/Meter Reader 27 Years Experience

Operators 60 Years Experience

Watershed Supintendent 25 Years Experience

Reservoir Attendents 28 Years Experience

Page 4: Water Treatment Plant Presentation Final

Over a hundred years ago, thefounding fathers of the newlyincorporated City ofAmsterdam, NY had the visionof creating a water system thatwould serve its increasingresident and businesspopulation for many years intothe future. The vision todevelop a safe and reliablesource of water was ingenious.

Page 5: Water Treatment Plant Presentation Final

The Glen Wild watershed has been

supplying water to the City of

Amsterdam since December 1,

1890 from its expanse of almost

5,000 protected acres in the

Southern Adirondacks.

Page 6: Water Treatment Plant Presentation Final
Page 7: Water Treatment Plant Presentation Final

Steele’s Reservoir

Ireland Vly Round Lake

Employee Shop & House

Page 8: Water Treatment Plant Presentation Final
Page 9: Water Treatment Plant Presentation Final
Page 10: Water Treatment Plant Presentation Final
Page 11: Water Treatment Plant Presentation Final

As we well know, weather plays a big part in our daily lives. What many people donot understand is how it can affect ours. Weather extremes have been morecommon in recent years and though it may appear that our water is plentiful andpure, meteorological events such as drought and flooding can have a pronouncedimpact on treatment and making the water potable.

Page 12: Water Treatment Plant Presentation Final

After being full in May, 2012 and a summer of use, Steele’s reservoir was down 13 ft. by the end of 2012.

Page 13: Water Treatment Plant Presentation Final

Logging is an important part of watershed stewardship and provides revenue

Page 14: Water Treatment Plant Presentation Final

2013-2014 Logging Area

Page 15: Water Treatment Plant Presentation Final

The intake building channels water from Ireland Vly reservoir into a 24” pipe to be delivered to city. Steele’s reservoir is piped

directly from the reservoir to the intake and not influenced by stream conditions.

Page 16: Water Treatment Plant Presentation Final

Chlorine Dioxide is generated and injected at

the intake

Page 17: Water Treatment Plant Presentation Final

The raw water line traverses almost 15 miles of private property via a right-of-way through mostly

wooded lands.

Page 18: Water Treatment Plant Presentation Final

The transmission line from Glen Wild to the City of Amsterdam remains a critical piece of infrastructure which must not be overlooked.

Midline Rd. April 8, 2010Maple Ave. October 18, 2007

Page 19: Water Treatment Plant Presentation Final

Stairs Road crossing with a new isolation valve installed December, 2011

Page 20: Water Treatment Plant Presentation Final

September 15, 2009 marked the groundbreaking for the upgrade to the original facilitywhich was built in 1974 and was in need of improvements to remain in compliancewith state and federal regulations. The new 10.5 million dollar facility was partiallyfunded through the American Reinvestment and Recovery Act (ARRA) and went intoproduction on January 13, 2011.

Page 21: Water Treatment Plant Presentation Final
Page 22: Water Treatment Plant Presentation Final

Fill Line

Page 23: Water Treatment Plant Presentation Final
Page 24: Water Treatment Plant Presentation Final
Page 25: Water Treatment Plant Presentation Final
Page 26: Water Treatment Plant Presentation Final
Page 27: Water Treatment Plant Presentation Final
Page 28: Water Treatment Plant Presentation Final
Page 29: Water Treatment Plant Presentation Final
Page 30: Water Treatment Plant Presentation Final
Page 31: Water Treatment Plant Presentation Final

Adsorption Clarifier

Mixed Media Filter

Page 32: Water Treatment Plant Presentation Final
Page 33: Water Treatment Plant Presentation Final

Backwash Tank Replacement

Page 34: Water Treatment Plant Presentation Final

Ultraviolet light disinfection reduces the amount of chlorine needed and helps to reduce harmful byproducts of chlorine.

Page 35: Water Treatment Plant Presentation Final

Original filters retrofitted to be used as carbon

contactors for taste, odor and disinfection

byproduct removal.

Page 36: Water Treatment Plant Presentation Final
Page 37: Water Treatment Plant Presentation Final

Computer monitoring andcontinuous samplingallows for the ability ofmaking process changesat the treatment plantand remote locations. Italso provides necessaryoperational informationto operators.

Page 38: Water Treatment Plant Presentation Final

Besides continuouscomputer monitoring,over 250 physical testsare taken each day inour lab. These testsamount to over 93,000tests per year on 215contaminants.

Page 39: Water Treatment Plant Presentation Final

Operators are licensed by the New York State Department of Health and

must take continuing education courses to renew their licenses.

Page 40: Water Treatment Plant Presentation Final

The updated facility was planned to continue to provide safe potable water in compliance with state and federal regulations for years to come.

Page 41: Water Treatment Plant Presentation Final

Feel free to contact us with any questions or to plan a visit.